Implement New Underground Storage Tank Program Sample Clauses

Implement New Underground Storage Tank Program. The Underground Storage Tank (UST) Program is a major component of the Massachusetts groundwater resource protection effort, and also a key federal grant commitment. To protect the environment from leaking underground chemical and petroleum products from storage tanks, MassDEP will fully implement federal requirements addressing registration and inspection of UST systems used to store petroleum fuels or hazardous substances.
AutoNDA by SimpleDocs
Implement New Underground Storage Tank Program. The new Underground Storage Tank (UST) program is a major component of the Massachusetts groundwater resource protection effort, and also a key federal grant commitment. To protect the environment from leaking underground chemical and petroleum products from storage tanks, MassDEP will work to ensure compliance with requirements to remove or upgrade all outdated single wall steel tanks in FFY2018 as well as registration and inspection commitments for UST systems storing petroleum fuels or hazardous substances. Continuing to provide a publicly available database of information (including geo-location information) on regulated underground tanks in Massachusetts, and implementing a third party inspection program are key components of this groundwater protection effort.

Related to Implement New Underground Storage Tank Program

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Optional Extended Local Calling Scope Arrangement Traffic (5) special access, private line, Frame Relay, ATM, or any other traffic that is not switched by the terminating Party; (6) Tandem Transit Traffic; (7) Voice Information Service Traffic (as defined in Section 5 of the Additional Services Attachment); or, (8) Virtual Foreign Exchange Traffic (or V/FX Traffic) (as defined in the Interconnection Attachment). For the purposes of this definition, a Verizon local calling area includes a Verizon non-optional Extended Local Calling Scope Arrangement, but does not include a Verizon optional Extended Local Calling Scope Arrangement.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Commingling of Resold Services with Unbundled Network Elements and Combinations of Unbundled Network Elements 6.7.1 To the extent it is Technically Feasible and pursuant to the terms of Section 9.1, CLEC may Commingle Telecommunications Services purchased on a resale basis with an Unbundled Network Element or combination of Unbundled Network Elements.

  • No Storing Hazardous Articles Not to keep or store any offensive, combustible, obnoxious, hazardous or dangerous articles in the said Apartment, the Common Areas, and the Building.