Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.
Trunk Group Connections and Ordering 5.2.1 For both One-Way and Two-Way Interconnection Trunks, if Onvoy wishes to use a technically feasible interface other than a DS1 or a DS3 facility at the POI, the Parties shall negotiate reasonable terms and conditions (including, without limitation, rates and implementation timeframes) for such arrangement; and, if the Parties cannot agree to such terms and conditions (including, without limitation, rates and implementation timeframes), either Party may utilize the Agreement’s dispute resolution procedures.
Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.
Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.
Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.
BUYER'S FACILITIES 1. Buyer will maintain at its own expense facilities from the delivery point to the point of use and the burners and equipment for using gas, and Buyer will at all times keep gas-using equipment on said premises in a condition conforming with such reasonable rules and regulations as may be prescribed therefore by regulatory authority having jurisdiction thereover and with the requirements of any valid law thereto appertaining. In the event that rules are not prescribed by a regulatory authority, Buyer will abide by codes as used in the gas industry.
FACILITIES, EQUIPMENT AND OTHER MATERIALS Except as otherwise specifically provided in this Agreement, CONTRACTOR shall, at its sole cost and expense, furnish all facilities, equipment, and other materials which may be required for performing services pursuant to this Agreement. At COUNTY’s discretion, COUNTY may make equipment or facilities available to CONTRACTOR for CONTRACTOR’s use in furtherance of this Agreement only where a COUNTY Facility or Equipment exhibit is attached to this Agreement identifying the equipment or facilities to be used by CONTRACTOR’s personnel. If COUNTY funds equipment as part of this contract, COUNTY will retain Equipment.
Carrier Lines All Participants acknowledge that the Transaction of Message Content between Participants is to be provided over various facilities and communications lines, and information shall be transmitted over local exchange and Internet backbone carrier lines and through routers, switches, and other devices (collectively, “carrier lines”) owned, maintained, and serviced by third-party carriers, utilities, and Internet service providers, all of which may be beyond the Participants’ control. Provided a Participant uses reasonable security measures, no less stringent than those directives, instructions, and specifications contained in this Agreement, the Performance and Service Specifications, and the Operating Policies and Procedures, the Participants assume no liability for or relating to the integrity, privacy, security, confidentiality, or use of any information while it is transmitted over those carrier lines, which are beyond the Participants’ control, or any delay, failure, interruption, interception, loss, transmission, or corruption of any Message Content or other information attributable to transmission over those carrier lines which are beyond the Participants’ control. Use of the carrier lines is solely at the Participants’ risk and is subject to all Applicable Law.
CONNECTING TRANSMISSION OWNER’S INTERCONNECTION FACILITIES As depicted on the one-line diagram in Attachment 3, the Connecting Transmission Owner’s Interconnection Facilities consist of the following constructed or installed between the POI and PCO, as well as metering and telecommunications located at the Xxxxxxxxx Solar Collector Substation.
Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.