Install Plant Wall Insulation in Deficient Areas (Freezing Protection. Insulation and heat tape will be installed to prevent damage to equipment as the result of uninsulated walls that results in insufficiently heated areas of the plant (resulting in freezing pipes and equipment during the winter months).
AutoNDA by SimpleDocs

Related to Install Plant Wall Insulation in Deficient Areas (Freezing Protection

  • Closet/Urinal Requirements 6.1 Employees Closets Urinals 1-5 1 Nil 6-10 1 1 11-20 2 2 21-35 3 4 36-50 4 6 51-75 5 7 76-100 6 8

  • System Protection Facilities The Interconnection Customer shall, at its expense, install, operate and maintain System Protection Facilities as a part of the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities. The Participating TO shall install at the Interconnection Customer's expense any System Protection Facilities that may be required on the Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System as a result of the interconnection of the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • UNIFORMS & EQUIPMENT Uniforms and equipment required by the Department to be worn/used by employees will be furnished by the Department.

  • Monitoring Equipment 2.2.1 24-hour TSP air quality monitoring was performed using High Volume Sampler (HVS) located at each designated monitoring station. The HVS meets all the requirements of the Project Specific EM&A Manual. Portable direct reading dust meters were used to carry out the 1-hour TSP monitoring. Brand and model of the equipment is given in Table 2.1.

  • UNDERGROUND LOCATIONS Prior to the Company commencing any work the Customer must advise the Company of the precise location of all underground services on the site and clearly xxxx the location. The underground mains and services the Customer must identify include, but are not limited to, telephone cables, fibre optic cables, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigations pipes, oil pumping mains and any other services that may be on site. Whilst the Company will take all care to avoid damage to any underground services the Customer agrees to indemnify the Company in respect of all any liability claims, loss, damage, cost and fines as a result of damage to services not precisely located and notified pursuant to this clause.

  • Safe Equipment The City shall furnish and maintain in the best possible working condition, within the limits of its financial capability, the necessary tools, facilities, vehicles, supplies, and equipment required for members to safely carry out their duties. Members are responsible for reporting unsafe conditions or practices, for avoiding negligence, and for properly using and caring for tools, facilities, vehicles, supplies, and equipment provided by the City.

  • STANDARD EQUIPMENT All items of standard equipment which are provided by the OEM shall be furnished unless such items are expressly deleted by the Authorized User or are specified to be other than standard in the Mini-Bid. When Optional equipment is specified, all components listed in the OEM’s data book as being included with the Option shall be furnished.

  • Contractor’s Equipment Payment for required equipment owned by the Construction Manager or an affiliate of the Construction Manager will be based solely on an hourly rate derived by dividing the current appropriate monthly rate by 176 hours. No payment will be made under any circumstances for repair costs, freight and transportation charges, fuel, lubricants, insurance, any other costs and expenses, or overhead and profit. Payment for such equipment made idle by delays attributable to the Government will be based on one-half the derived hourly rate under this subsection.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.