Installation Work. a) The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RFS No dated: and the sanction letter issued by <NAME OF EXPERT PSU>. The Power Producer shall provide to the Purchaser a xxxx of materials listing the major equipment constituting the System. Such xxxx of materials shall be provided within 30 days of the Commercial Operation Date. b) The Power Producer shall have access as reasonably permitted by the Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the Power Producer shall commission the System with a capacity of kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. d) The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Purchaser. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, the Power Producer shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed ;(c) Carry out any other modification of the Premises without the written consent of the Purchaser. f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment / facilities owned by the Purchaser due to the Power Producer, the same shall be made good rectified by the Power Producer at their cost. g) The Power Producer shall, within fifteen (15) working days of the Effective Date, submit to the Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Purchaser has any objection/'recommendation in the Shop Drawings, he shall communicate the same to Power Producer within a period of ten (10) working days of the date of submission of the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. Subject to any punch-list items which shall be agreed by the. Purchaser as not being material to completion of the Project, the Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System. h) If the Power Producer is unable to commence supply of Solar Power to the Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 and 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document to this Agreement. i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement. j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.
Appears in 1 contract
Samples: Power Purchase Agreement (Ppa)
Installation Work. a) The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RFS No dated: and the sanction letter issued by <NAME OF EXPERT PSU>. The Power Producer shall provide to the Purchaser a xxxx of materials listing the major equipment constituting the System. Such xxxx of materials shall be provided within 30 days of the Commercial Operation Date.No
b) The Power Producer shall have access as reasonably permitted by the Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical.
c) It is agreed between the Parties that the Power Producer shall commission the System with a capacity of kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing.
d) The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Purchaser. The Delivery Point shall be where the Main Metering System is located.
e) Unless otherwise agreed between the Parties, the Power Producer shall not do
(a) chipping of rooftop; or (b) water proofing of roof to be disturbed ;(c) Carry out any other modification of the Premises without the written consent of the Purchaser.
f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment / facilities owned by the Purchaser due to the Power Producer, the same shall be made good rectified by the Power Producer at their cost.
g) The Power Producer shall, within fifteen (15) working days of the Effective Date, submit to the Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Purchaser has any objection/'recommendation in the Shop Drawings, he shall communicate the same to Power Producer within a period of ten (10) working days of the date of submission of the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. .Subject to any punch-list items which shall be agreed by the. Purchaser as not being material to completion of the Project, the Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System.
h) If the Power Producer is unable to commence supply of Solar Power to the Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 and 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document to this Agreement.
i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement.
j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.
Appears in 1 contract
Samples: Power Purchase Agreement (Ppa)
Installation Work. a) The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially c o n s t r u c t e d s u b s t a n t i a l l y in accordance a c c o r d a n c e with RFS No RF S No…… dated: and the sanction letter issued by <NAME OF EXPERT PSU>CSIR-AMPRI, Bhopal . The Power Producer shall provide shallprovide to the Purchaser a xxxx bill of materials listing the major equipment constituting the System. Such xxxx bill of materials shall be provided within 30 days of the Commercial Operation Date.]
b) The Power Producer shall have access as reasonably permitted by the Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical.
c) It is agreed between the Parties that the Power Producer shall commission the System with a capacity of kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing.
d) The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Purchaser. The Delivery Point shall be where the Main Metering System is located.
e) Unless otherwise agreed between the Parties, the Power Producer shall not do
(a) chipping of rooftop; or (b) water proofing of roof to be disturbed ;(c) Carry out any other modification of the Premises without the written consent of the Purchaser.
f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment / facilities owned by the Purchaser due to the Power Producer, the same shall be made good rectified by the Power Producer at their cost.
g) The Power Producer shall, within fifteen (15) working days of the Effective Date, submit to the Purchaser shop drawings of the Project for approval (a p p r o v a l( "Shop DrawingsD r a w i n g s "). The drawings d r a w i n g s will have ha ve to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Purchaser has any objection/'recommendation in the Shop Drawings, he shall communicate the same to Power Producer within a period of ten (10) working days of the date of submission of the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. Subject to any punch-list items which shall be agreed by the. Purchaser as not being material to completion of the Project, the Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System.
h) If the Power Producer is unable to commence supply of Solar Power to the Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 and 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document RFSdocument to this Agreement.
i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement.
j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.
Appears in 1 contract
Samples: Power Purchase Agreement
Installation Work. a) The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RFS No dated: and the sanction letter issued by <NAME OF EXPERT PSU>. The Power Producer shall provide to the Purchaser a xxxx bill of materials listing the major equipment constituting the System. Such xxxx bill of materials shall be provided within 30 days of the Commercial Operation Date.
b) The Power Producer shall have access as reasonably permitted by the Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical.
c) It is agreed between the Parties that the Power Producer shall commission the System with a capacity of kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing.
d) The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Purchaser. The Delivery Point shall be where the Main Metering System is located.
e) Unless otherwise agreed between the Parties, the Power Producer shall not do
(a) chipping of rooftop; or (b) water proofing of roof to be disturbed ;(c) Carry out any other modification of the Premises without the written consent of the Purchaser.
f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment / facilities owned by the Purchaser due to the Power Producer, the same shall be made good rectified by the Power Producer at their cost.
g) The Power Producer shall, within fifteen (15) working days of the Effective Date, submit to the Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Purchaser has any objection/'recommendation in the Shop Drawings, he shall communicate the same to Power Producer within a period of ten (10) working days of the date of submission of the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. Subject to any punch-list items which shall be agreed by the. Purchaser as not being material to completion of the Project, the Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System.
h) If the Power Producer is unable to commence supply of Solar Power to the Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 and 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document to this Agreement.
i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement.
j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.
Appears in 1 contract
Installation Work. a) The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RFS RFP No dated: and the sanction letter issued by <NAME OF EXPERT PSU>. The Power Producer shall provide to the Purchaser a xxxx of materials listing the major equipment constituting the System. Such xxxx of materials shall be provided within 30 days of the Commercial Operation Date.
b) The Power Producer shall have access as reasonably permitted by the Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical.
c) It is agreed between the Parties that the Power Producer shall commission the System with a capacity of kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing.
d) The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Purchaser. The Delivery Point shall be where the Main Metering System is located.
e) Unless otherwise agreed between the Parties, the Power Producer shall not do
do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed ;(c) Carry out any other modification of the Premises without the written consent of the Purchaser.
f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment / facilities owned by the Purchaser due to the Power Producer, the same shall be made good rectified by the Power Producer at their cost.
g) The Power Producer shall, within fifteen (15) working days of the Effective Date, submit to the Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Purchaser has any objection/'recommendation in the Shop Drawings, he shall communicate the same to Power Producer within a period of ten (10) working days of the date of submission of the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. Subject to any punch-list items which shall be agreed by the. Purchaser as not being material to completion of the Project, the Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System.
h) If the Power Producer is unable to commence supply of Solar Power to the Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 and 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-pre- estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS RFP appended as Schedule VI format as per respective RFS RFP document to this Agreement.
i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement.
j) Power Producer shall fulfill fulfil all obligations undertaken by it under this Agreement.
Appears in 1 contract
Samples: Power Purchase Agreement (Ppa)
Installation Work. a) The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RFS No dated: and the sanction letter issued by <NAME OF EXPERT PSU>. The Power Producer shall provide to the Purchaser a xxxx bill of materials listing the major equipment constituting the System. Such xxxx bill of materials shall be provided within 30 days of the Commercial Operation Date.
b) The Power Producer shall have access as reasonably permitted by the Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical.
c) It is agreed between the Parties that the Power Producer shall commission the System with a capacity of kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing.
d) The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Purchaser. The Delivery Point shall be where the Main Metering System is located.
e) Unless otherwise agreed between the Parties, the Power Producer shall not do
(a) chipping of rooftop; or (b) water proofing of roof to be disturbed ;(c) Carry out any other modification of the Premises without the written consent of the Purchaser.
f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment / facilities owned by the Purchaser due to the Power Producer, the same shall be made good rectified by the Power Producer at their cost.
g) The Power Producer shall, within fifteen (15) working days of the Effective Date, submit to the Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Purchaser has any objection/'recommendation in the Shop Drawings, he shall communicate the same to Power Producer within a period of ten (10) working days of the date of submission of the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. .Subject to any punch-list items which shall be agreed by the. Purchaser as not being material to completion of the Project, the Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System.
h) If the Power Producer is unable to commence supply of Solar Power to the Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 and 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document to this Agreement.
i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement.
j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.
Appears in 1 contract
Installation Work. a) The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RFS No dated: and the sanction letter issued by <NAME OF EXPERT PSU>. The Power Producer shall provide to the Purchaser a xxxx of materials listing the major equipment constituting the System. Such xxxx of materials shall be provided within 30 days of the Commercial Operation Date.
b) The Power Producer shall have access as reasonably permitted by the Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical.
c) It is agreed between the Parties that the Power Producer shall commission the System with a capacity of kWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing.
d) The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Purchaser. The Delivery Point shall be where the Main Metering System is located.
e) Unless otherwise agreed between the Parties, the Power Producer shall not do
do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed ;(c) Carry out any other modification of the Premises without the written consent of the Purchaser.
f) The Power Producer shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment / facilities owned by the Purchaser due to the Power Producer, the same shall be made good rectified by the Power Producer at their cost.
g) The Power Producer shall, within fifteen (15) working days of the Effective Date, submit to the Purchaser shop drawings of the Project for approval ("Shop Drawings"). The drawings will have to be approved from the Power Purchaser within 3 working days from the submission of the drawings. If the Purchaser has any objection/'recommendation in the Shop Drawings, he shall communicate the same to Power Producer within a period of ten (10) working days of the date of submission of the Shop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. Subject to any punch-list items which shall be agreed by the. Purchaser as not being material to completion of the Project, the Power Producer agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date ("Scheduled Completion Date"). Purchaser shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and drawl of power from System.
h) If the Power Producer is unable to commence supply of Solar Power to the Purchaser by the Scheduled Completion Date, other than for the reasons specified in Article 11 and 12.2 (Force Majeure or Purchaser Default), the Power Producer or its contractor shall pay to <NAME OF EXPERT PSU> genuine pre-estimated liquidated damages for the delay in such commencement of supply of Solar Power as per the clause of the <NAME OF EXPERT PSU> RFS appended as Schedule VI format as per respective RFS document to this Agreement.
i) The Purchaser shall ensure that all arrangements and infrastructure for receiving Solar Power beyond the Delivery Point are ready on or prior to the Commercial Operation Date and is maintained in such state in accordance with applicable laws through the Term of the Agreement.
j) Power Producer shall fulfill all obligations undertaken by it under this Agreement.
Appears in 1 contract
Samples: Power Purchase Agreement