Instrumentation Plan. 41 At the same time as the Initial Design Submittal of the associated design, Developer shall 42 submit an initial Geotechnical Engineering Report to ADOT. At the same time as Final Design 43 Submittal of the associated design, Developer shall submit a final Geotechnical Engineering
Appears in 4 contracts
Samples: azdot.gov, apps.azdot.gov, apps.azdot.gov
Instrumentation Plan. 41 At the same time as With the Initial Design Submittal of the associated design, Developer shall 42 submit an initial Initial 42 Geotechnical Engineering Report Report(s) to ADOT. At With the same time as Final Design 43 Submittal of the associated 43 design, Developer shall submit a final Final Geotechnical EngineeringEngineering Report(s) to ADOT for review 44 and comment. The Final Geotechnical Engineering Report(s) must be signed and sealed by the 1 responsible Professional Engineer and include the Comment Resolution Form showing how the 2 Final Design Submittal addressed ADOT’s review comments.
Appears in 1 contract
Samples: apps.azdot.gov