Equipment Requirements Sample Clauses

Equipment Requirements. No Equipment is provided to Customer as part of this Service.
Equipment Requirements. (a) All tractors must be equipped as necessary to allow the driver to safely enter and exit the cab, and hook and unhook the air hoses. All equipment used as city peddle trucks, and equipment regularly assigned to peddle runs, must have steps or other similar device to enable drivers to get in and out of the body. All twin trailers used in LTL pick-up and delivery operation with roll up doors purchased after April 1, 1985 shall be equipped with a hand hold and a DOT bumper which may serve as a step. All equipment purchased, ordered, and/or introduced to the Pickup and Delivery operations after April 1, 2003 will be equipped with air-conditioning and will be maintained in proper operating condition during the period of May 31st through September 30th. The Company will not exceed two weeks in making necessary air conditioning repairs during this period. It shall not be a violation of this section to operate any unit while waiting for repairs. (b) The Employer shall install heaters and defrosters on all trucks and tractors. (c) There shall be first-line tires on the steering axle of all road and local pick-up and delivery power units. (d) All road equipment regularly assigned to the fleet shall be equipped with an air-ride seat on the driver’s side. Such equipment shall be maintained in reasonable operating condition. All new air ride seats shall oscillate and have an adjustable lumbar support, height, backrest and seat tilt. (e) Tractors added to the road fleet and assigned to road operations on a regular basis, whether newly manufactured or not newly manufactured, shall be air conditioned. (f) When the Employer weighs a trailer, the over-the-road driver shall be furnished the resulting weight information along with his/her driver’s orders. (g) All company trailers shall be marked for height. (h) No driver shall be required to drive a tractor designed with the cab under the trailer. (i) All road and city equipment shall have a speedometer operating with reasonable accuracy. (j) The following minimum measurements for fuel tank placement shall apply to tractors added to the fleet after March 1, 1981, with the understanding that there shall be no retrofit of equipment currently in use: (1) front of fuel tank to rear of front tire-not less than 4 inches; (2) rear of fuel tank to front of duals-not less than 4 inches; (3) bottom of fuel tank to ground- provide clearance not less than 7.5 inches, measured on a flat surface; and (4) all fuel tank measurements as st...
Equipment Requirements. All equipment furnished by the Contractor and used on the work shall be of such size and of such mechanical condition that the work can be performed in an acceptable manner at a satisfactory rate of progress and the quality of work produced will be satisfactory. 7.20.4.1 Equipment used on any portion of the project shall be such that no injury to the work, persons at or near the site, adjacent property or other objects will result from its use. 7.20.4.2 If the Contractor fails to provide adequate equipment for the work, the contract may be terminated as provided under Section 7.27, TERMINATION OF CONTRACT FOR CAUSE. 7.20.4.3 In the event that the Contractor furnishes and operates equipment on a force account basis, it shall be operated to obtain maximum production under the prevailing conditions.
Equipment Requirements. Customer is responsible for providing a router or modem at each location where Service terminates. In some cases LightEdge will provide the required Equipment for Service termination. Equipment thus provided shall be treated under the same terms as Equipment “rented through LightEdge”. LightEdge will define Equipment compatibility with Service and reserves the right to modify this list of compatible Equipment at any time. LightEdge shall be the sole party responsible for defining which Equipment is compatible with Service.
Equipment Requirements. Customer is responsible for all Equipment used to deliver or provide Service and all equipment used to access Service.
Equipment Requirements. ‌ 13 Developer shall ensure that SPT hammers to be used for the geotechnical investigation have 14 been tested for energy efficiency within the last 12 months prior to use, with the energy 15 efficiency ratio reported in the boring logs and drilling records.
Equipment Requirements. To use Sharetec Online Banking, you need a computer with a modem and a web browser (such as Microsoft Internet Explorer, Netscape Navigator, Mozilla, or an equivalent). You are responsible for the set-up and maintenance of your home computer and modem and web browser.
Equipment Requirements. All equipment and components required for the Project shall comply with all manufacturers’ installation requirements, applicable laws, regulations, codes, licensing, and permit requirements. This includes, but is not limited to, SEQR; the International Building Code Series as amended by the New York State Uniform Code Supplement; the National Electric Code; New York State’s Standard Interconnection Requirements; and all applicable State, city, town, or local ordinances or permit requirements, and any additional requirements of the local Authority Having Jurisdiction.
Equipment Requirements. To use the Online Banking, you need a computer, smart phone or other device with a modem or a web browser (such as Microsoft Internet Explorer, Netscape Navigator, Mozilla, or an equivalent). You are responsible for the set-up and maintenance of your home computer, smart phone, modem, web browser or other device.
Equipment Requirements. Customer acknowledges and agrees that the standard functioning of the Services is dependent on Customer maintaining adequate access to the Internet, the availability of an adequate power supply and the use of correct equipment configuration. Customer also acknowledges and agrees that a number of factors outside of Aircall’s control may impact the quality of Customer’s communications and the access and/use of the Services including Customer’s local network, public Internet lines, the public switched telephone network, Customer’s Internet service provider and/or local network hardware. Aircall takes no responsibility and shall not be liable for any disruption, interruption or delay caused by any failure in any of these items or any other item over which Aircall has no control.