INTERCONNECT ROUTING RULES. 5.4.1 Traffic other than primary traffic shall be identified as overflow traffic. Overflow traffic has a lower priority than primary traffic. However:
AutoNDA by SimpleDocs

Related to INTERCONNECT ROUTING RULES

  • Interconnection If Manager desires to interconnect a portion of the Service Area Network with another carrier and Sprint PCS can interconnect with that carrier at a lower rate, then to the extent permitted by applicable laws, tariffs and contracts, Sprint PCS may arrange for the interconnection under its agreements with the carrier and if it does so, Sprint PCS will xxxx the interconnection fees to Manager.

  • Network Access Control The VISION Web Site and the Distribution Support Services Web Site (the “DST Web Sites”) are protected through multiple levels of network controls. The first defense is a border router which exists at the boundary between the DST Web Sites and the Internet Service Provider. The border router provides basic protections including anti-spoofing controls. Next is a highly available pair of stateful firewalls that allow only HTTPS traffic destined to the DST Web Sites. The third network control is a highly available pair of load balancers that terminate the HTTPS connections and then forward the traffic on to one of several available web servers. In addition, a second highly available pair of stateful firewalls enforce network controls between the web servers and any back-end application servers. No Internet traffic is allowed directly to the back-end application servers. The DST Web Sites equipment is located and administered at DST’s Winchester data center. Changes to the systems residing on this computer are submitted through the DST change control process. All services and functions within the DST Web Sites are deactivated with the exception of services and functions which support the transfer of files. All ports on the DST Web Sites are disabled, except those ports required to transfer files. All “listeners,” other than listeners required for inbound connections from the load balancers, are deactivated. Directory structures are “hidden” from the user. Services which provide directory information are also deactivated.

  • Emergency Generator Tenant shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsible, at its sole cost and expense, for installing, maintaining, repairing and replacing its connection between the Premises and the Unit Generator, and all associated cabling. Tenant shall be permitted to use up to an average of three (3) xxxxx per square foot of usable area in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tie-in and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Development.

  • Metering 1. If the Producer desires to sell electric power to the Company, the Company shall provide, own and maintain at the Producer's expense all necessary meters and associated equipment to be utilized for the measurement of energy and capacity for determining the Company's payment to the Producer pursuant to an applicable agreement.

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.

  • Quality Control Procedures The Seller must have an internal quality control program that verifies, on a regular basis, the existence and accuracy of the legal documents, credit documents, property appraisals, and underwriting decisions. The program must be capable of evaluating and monitoring the overall quality of its loan production and servicing activities. The program is to ensure that the Mortgage Loans are originated and serviced in accordance with prudent mortgage banking practices and accounting principles; guard against dishonest, fraudulent, or negligent acts; and guard against errors and omissions by officers, employees, or other authorized persons.

  • Electrical Service Subject to the limitation of this Paragraph 4, furnish electrical service to the Premises, including providing and installing all Building standard replacement lighting tubes. If Tenant uses more electrical power than Landlord in good faith considers reasonable or normal for office use, Tenant will pay Landlord on a monthly basis the cost of such excess power consumed by Tenant. Consumption will be determined, at Landlord’s election, either (a) by a survey performed by a reputable consultant selected by Landlord, or (b) through separate meters or submeters installed, maintained and read by Landlord at Tenant’s cost. For purposes of this Paragraph 4 only, “month” and “monthly” shall mean any billing period used by the utility or other power provider supplying electricity. All installations of electrical futures, appliances and equipment within the Premises shall be subject to Landlord’s prior approval, and if they affect the temperature or humidity otherwise maintained, Landlord may, at Tenant’s sole cost and expense (to be paid within (30) days after delivery of written demand supported by invoices or other reasonably satisfactory evidence), install supplemental air conditioning units. Tenant’s use of electricity shall never exceed Tenant’s share of the capacity of existing feeders to the Building or of the risers, wiring installations and transformers serving the floor(s) containing the Premises. Landlord shall provide up to 3.5 xxxxx per usable square foot (demand) of riser and floor panel electrical capacity averaged over the floor being serviced. EXHIBIT C Tenant shall be allocated an approximate 2.0 xxxxx per usable square foot for power and 1.5 xxxxx per usable square foot for lighting. Any risers or wiring necessary to meet Tenant’s excess electrical requirements will be installed by Landlord on Tenant’s request, at Tenant’s sole cost and expense (to be paid in advance), but only if in Landlord’s reasonable good faith belief they are necessary and will not cause damage to the Building or a dangerous condition, entail excessive or unreasonable alterations, repairs or expense, or disturb other occupants.

  • HEATING, VENTILATING AND AIR CONDITIONING The Tenant will operate and regulate those portions of the heating, ventilating, and air conditioning equipment within and serving the Leased Premises so as to maintain such reasonable conditions of temperature and humidity within the Leased Premises as are determined by the Landlord and its Architect and engineers so that no direct or indirect appropriation of the heating, ventilating and air conditioning from the other portions of the Building occurs. The Tenant shall comply with such stipulations and with all Rules and Regulations of the Landlord pertaining to the operation and regulation of such equipment. The Tenant shall immediately notify the Landlord in the event that any repairs are required to the heating, ventilating and air conditioning equipment serving the Leased Premises and shall reimburse the Landlord as part of its Proportionate Share of Operating Costs for the cost of any maintenance, repairs or replacements made by the Landlord in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises. The Landlord acknowledges that the Tenant shall not be responsible for the cost of capital repairs and capital replacements in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises provided that such capital repairs and capital replacements are not necessitated by the Tenant's incorrect or negligent use of equipment. The Tenant shall not under any circumstances go onto the roof of the Building or make any maintenance repairs or replacements to the heating, ventilating and air conditioning systems in the Building without the prior written consent of the Landlord. If the Tenant fails to comply with such stipulations and Rules and Regulations, the Landlord shall be entitled to take such steps as it deems advisable to correct such defaults (including, without limitation, entering upon the Leased Premises and assuming control of such equipment) without liability to the Tenant, and the Tenant will pay to the Landlord forthwith upon demand as Additional Rent all costs and expenses incurred by the Landlord in so doing. The Landlord represents and warrants to the Tenant that the heating, ventilating and air conditioning equipment serving the Leased Premises and required to be installed by the Landlord pursuant to Schedule "C" is and will be at the Commencement Date in good working order and condition.

  • Protocol (cc) Part 2(b) of the ISDA Schedule – Payee Representation.

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).