Common use of INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS Clause in Contracts

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, TSTRANSCO or DISCOM shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer has to bear the entire cost of the Interconnection Facilities as per the approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may allow the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the approved estimate at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further in case the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCO. 3.2 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and shall bear the necessary expenditure. The maintenance work of the connected bay together with equipment at the interconnection substation has to be done in coordination with the TSTRANSCO and DISCOM personnel. Where TSTRANSCO or DISCOM carries out the maintenance work, the solar power developer shall pay the expenses to TSTRANSCO or DISCOM as applicable. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut, 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may be. 3.4 The solar power developer shall be responsible to operate the Project as per this Agreement and to provide appropriate facility or instrumentation or metering arrangement as per Clause 4.1. 3.5 The solar power developer shall use components or equipment for the SPV complying with approved or minimum technical standards as per the International Electro-technical Commission (“IEC”) or Bureau of Indian Standards (“BIS”) or technical standards that are prescribed by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developer.

Appears in 2 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement

AutoNDA by SimpleDocs

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, TSTRANSCO or DISCOM shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may allow the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the approved estimate at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further procedure in case the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCOvogue. 3.2 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and shall bear the necessary expenditure. The maintenance work of the connected bay together with equipment at the interconnection substation grid sub- station has to be done in coordination with the TSTRANSCO and DISCOM personnel. Where TSTRANSCO or DISCOM carries out the maintenance Maintenance work, the solar power developer producer shall pay the expenses to TSTRANSCO or DISCOM as applicable. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut,. 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may be. 3.4 The solar power developer Solar Power Developer shall be responsible to operate the Project as per this Agreement and to provide appropriate facility or instrumentation or metering arrangement as per Clause 4.1. 3.5 The solar power developer Solar Power Developer shall use components or equipment for the SPV complying with approved or minimum technical standards as per the International Electro-technical Commission (“IEC”) or Bureau of Indian Standards (“BIS”) or technical standards that are prescribed by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developerSolar Power Developer.

Appears in 2 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, TSTRANSCO or APTRANSCO/ DISCOM shall will prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or sanctioned estimate. 3.2 APTRANSCO and DISCOM may allow also permit the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the approved sanctioned estimate at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further procedure in case the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCOvogue. 3.2 3.3 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall bear have to be borne by the necessary expenditureSolar Power Developer. The maintenance work of at the grid sub-station and connected bay together with and equipment at the interconnection substation has to be done in coordination with the TSTRANSCO APTRANSCO and DISCOM personnelauthorities. Where TSTRANSCO or If APTRANSCO/DISCOM carries out carryout the maintenance O&M work, the solar power developer producer shall pay the such expenses to TSTRANSCO or APTRANSCO/DISCOM as applicable. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut,. 3.3 3.4 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may beAPTRANSCO and DISCOM. 3.4 3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator /solar plants on the same feeder. 3.6 The solar power developer Solar Power Developer shall be responsible to operate the Project as per envisaged under this Agreement and & to provide appropriate facility or instrumentation or facility/ instrumentation/ metering arrangement as per Clause 4.1. 3.5 3.7 The solar power developer Solar Power Developer shall use components or deploy components/ equipment for the STP/SPV complying with approved or approved/ minimum technical standards as per the International Electro-technical Electrotechnical Commission (“IEC”) or & Bureau of Indian Standards (“BIS”) or technical standards that are prescribed as specified by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developerSolar Power Developer.

Appears in 2 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, TSTRANSCO or APTRANSCO/DISCOM shall will prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or sanctioned estimate. 3.2 APTRANSCO and DISCOM may allow also permit the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the approved sanctioned estimate at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further procedure in case the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCOvogue. 3.2 3.3 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall bear have to be borne by the necessary expenditureSolar Power Developer. The maintenance work of at the grid sub-station and connected bay together with and equipment at the interconnection substation has to be done in coordination with the TSTRANSCO APTRANSCO and DISCOM personnelauthorities. Where TSTRANSCO or If APTRANSCO/DISCOM carries out carryout the maintenance O&M work, the solar power developer producer shall pay the such expenses to TSTRANSCO or APTRANSCO/DISCOM as applicable. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut,. 3.3 3.4 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may beAPTRANSCO and DISCOM. 3.4 3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder. 3.6 The solar power developer Solar Power Developer shall be responsible to operate the Project as per envisaged under this Agreement and & to provide appropriate facility or instrumentation or facility/ instrumentation/metering arrangement as per Clause 4.1. 3.5 3.7 The solar power developer Solar Power Developer shall use components or deploy components/equipment for the SPV complying with approved or approved/minimum technical standards as per the International Electro-Electro technical Commission (“IEC”) or & Bureau of Indian Standards (“BIS”) or technical standards that are prescribed as specified by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developerSolar Power Developer.

Appears in 2 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, TSTRANSCO or DISCOM shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer has to bear the entire cost of the Interconnection Facilities as per the approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or , 3.2 TRANSCO and DISCOM may allow also permit the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the approved sanctioned estimate at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further procedure in case the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCOvogue. 3.2 3.3 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall bear have to be borne by the necessary expenditureSolar Power Developer. The maintenance work of at the grid sub-station and connected bay together with and equipment at the interconnection substation has to be done in coordination with the TSTRANSCO TRANSCO and DISCOM personnelauthorities. Where TSTRANSCO or If TRANSCO/DISCOM carries out carryout the maintenance O&M work, the solar power developer producer shall pay the such expenses to TSTRANSCO or TRANSCO/DISCOM as applicable. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut,. 3.3 3.4 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may beTRANSCO and DISCOM. 3.4 3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder. 3.6 The solar power developer Solar Power Developer shall be responsible to operate the Project as per envisaged under this Agreement and & to provide appropriate facility or instrumentation or facility/ instrumentation/metering arrangement as per Clause 4.1. 3.5 3.7 The solar power developer Solar Power Developer shall use components or deploy components/equipment for the STP/SPV complying with approved or approved/minimum technical standards as per the International Electro-Electro technical Commission (“IEC”) or & Bureau of Indian Standards (“BIS”) or technical standards that are prescribed as specified by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developerSolar Power Developer.

Appears in 1 contract

Samples: Power Purchase Agreement

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, TSTRANSCO or DISCOM shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may allow the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the approved estimate at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further procedure in case the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCOvogue. 3.2 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and shall bear the necessary expenditure. The maintenance work of the connected bay together with equipment at the interconnection substation grid sub-station has to be done in coordination with the TSTRANSCO and DISCOM personnel. Where TSTRANSCO or DISCOM carries out the maintenance Maintenance work, the solar power developer producer shall pay the expenses to TSTRANSCO or DISCOM as applicable. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut,. 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may be. 3.4 The solar power developer Solar Power Developer shall be responsible to operate the Project as per this Agreement and to provide appropriate facility or instrumentation or metering arrangement as per Clause 4.1. 3.5 The solar power developer Solar Power Developer shall use components or equipment for the SPV complying with approved or minimum technical standards as per the International Electro-technical Commission (“IEC”) or Bureau of Indian Standards (“BIS”) or technical standards that are prescribed by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developerSolar Power Developer. 3.6 <Intentionally left blank>

Appears in 1 contract

Samples: Power Purchase Agreement

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, TSTRANSCO or TRANSCO/DISCOM shall will prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or sanctioned estimate. 3.2 TRANSCO and DISCOM may allow also permit the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the approved sanctioned estimate at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further procedure in case the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCOvogue. 3.2 3.3 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall bear have to be borne by the necessary expenditureSolar Power Developer. The maintenance work of at the grid sub-station and connected bay together with and equipment at the interconnection substation has to be done in coordination with the TSTRANSCO TRANSCO and DISCOM personnelauthorities. Where TSTRANSCO or If TRANSCO/DISCOM carries out carryout the maintenance O&M work, the solar power developer producer shall pay the such expenses to TSTRANSCO or TRANSCO/DISCOM as applicable. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut,. 3.3 3.4 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may beTRANSCO and DISCOM. 3.4 3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder. 3.6 The solar power developer Solar Power Developer shall be responsible to operate the Project as per envisaged under this Agreement and & to provide appropriate facility or instrumentation or facility/ instrumentation/metering arrangement as per Clause 4.1. 3.5 3.7 The solar power developer Solar Power Developer shall use components or deploy components/equipment for the STP/SPV complying with approved or approved/minimum technical standards as per the International Electro-Electro technical Commission (“IEC”) or & Bureau of Indian Standards (“BIS”) or technical standards that are prescribed as specified by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developerSolar Power Developer.

Appears in 1 contract

Samples: Power Purchase Agreement

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developersolar power developer, TSTRANSCO or DISCOM shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer has to bear the entire cost of the Interconnection Facilities as per the approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may allow the Solar Power Developer solar power developer to execute the Interconnection Facilities for power evacuation as per the approved estimate at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to timeprocedure in vogue. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further in case the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCO. 3.2 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and shall bear the necessary expenditure. The maintenance work of the connected bay together with equipment at the interconnection substation has to be done in coordination with the TSTRANSCO and DISCOM personnel. Where TSTRANSCO or DISCOM carries out the maintenance work, the solar power developer shall pay the expenses to TSTRANSCO or DISCOM as applicable. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut, 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may be. 3.4 The solar power developer shall be responsible to operate the Project as per this Agreement and to provide appropriate facility or instrumentation or metering arrangement as per Clause 4.1. 3.5 The solar power developer shall use components or equipment for the SPV complying with approved or minimum technical standards as per the International Electro-technical Commission (“IEC”) or Bureau of Indian Standards (“BIS”) or technical standards that are prescribed by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developer. 3.6 Intentionally left blank Acceptance or Performance Test 3.7 Verification by TSTRANSCO / DISCOM 3.7.1 The solar power developer shall allow entry to the site of the Project free of all encumbrances at all times during the term of the agreement to the personnel of TSTRANSCO or DISCOM for inspection and verification of the works being carried out by the solar power developer at the site of the Project. 3.7.2 The TSTRANSCO or DISCOM or its representative may verify the construction works or operation of the Project being carried out by the solar power developer and if it is found that the construction works or operation of the Project is not as per the Prudent Utility Practices, it may seek clarifications from the Solar Power Developer or require the works to be stopped or to comply with their instructions.

Appears in 1 contract

Samples: Power Purchase Agreement

AutoNDA by SimpleDocs

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, TSTRANSCO or DISCOM shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the approved estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may allow the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the approved estimate at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further procedure in case the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCOvogue. 3.2 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and shall bear the necessary expenditure. The maintenance work of the connected bay together with equipment at the interconnection substation grid sub-station has to be done in coordination with the TSTRANSCO and DISCOM personnel. Where TSTRANSCO or DISCOM carries out the maintenance Maintenance work, the solar power developer producer shall pay the expenses to TSTRANSCO or DISCOM as applicable. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut,. 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may be. 3.4 The solar power developer Solar Power Developer shall be responsible to operate the Project as per this Agreement and to provide appropriate facility or instrumentation or metering arrangement as per Clause 4.1. 3.5 The solar power developer Solar Power Developer shall use components or equipment for the SPV complying with approved or minimum technical standards as per the International Electro-technical Commission (“IEC”) or Bureau of Indian Standards (“BIS”) or technical standards that are prescribed by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developerSolar Power Developer. 3.6 <Intentionally left blank> <Intentionally left blank>. 3.7 Verification by TSTRANSCO/DISCOM 3.7.1 The Solar Power Developer shall allow entry to the site of the Project free of all encumbrances at all times during the Term of the Agreement to the personnel of TSTRANSCO or DISCOM for inspection and verification of the works being carried out by the Solar Power Developer at the site of the Project. 3.7.2 The TSTRANSCO or DISCOM or its representative may verify the construction works or operation of the Project being carried out by the Solar Power Developer and if it is found that the construction works or operation of the Project is not as per the Prudent Utility Practices, it may seek clarifications from the Solar Power Developer or require the works to be stopped or to comply with their instructions.

Appears in 1 contract

Samples: Power Purchase Agreement

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the The Solar Power Developer, TSTRANSCO or DISCOM shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer Developer has to bear the entire cost of the Interconnection Facilities as per the approved sanctioned DISCOM estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may allow the Solar Power Developer to execute the for arranging Interconnection Facilities for power evacuation as per at the approved estimate Voltage of Interconnection. The Solar Power Developer shall also be responsible for obtaining any permits/ consents required for interconnection at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension sub-station and bay extension is not feasible, then the bidder shall procure land and undertake bay extension will be solely responsible for liaising at its own cost with any government body/ department for obtaining such a consent/ permit The interconnection line from Project switchyard to the location has to be constructed and maintained by the SPD at his cost. Further in case The entire cost of transmission including cost of procurement of land for bay (if any), construction of lines, metering equipment, losses, supervision charges etc., from the project connects Project up to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the Interconnection Point shall be borne by the SPD and shall invariably pay land cost for bays whether existing or to not be constructed, to TSTRANSCO. 3.2 reimbursed. The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall bear have to be borne by the necessary expenditureSolar Power Developer. The maintenance work of at the grid sub-station and connected bay together with and equipment at the interconnection substation has to be done in coordination with the TSTRANSCO and DISCOM personnel. Where TSTRANSCO or DISCOM carries out the maintenance work, the solar power developer shall pay the expenses to TSTRANSCO or DISCOM as applicableauthorities. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut, 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may be. 3.4 The solar power developer Solar Power Developer shall be responsible to operate the Project as per envisaged under this Agreement and & to provide appropriate facility or instrumentation or facility/ instrumentation/ metering arrangement as per Clause 4.1. 3.5 . The solar power developer Solar Power Developer shall use components or deploy components/equipment for the STP/SPV complying with approved or approved/minimum technical standards as per the International Electro-Electro technical Commission (“IEC”) or & Bureau of Indian Standards (“BIS”) or technical standards that are prescribed as specified by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developerSolar Power Developer.

Appears in 1 contract

Samples: Power Purchase Agreement

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the Solar Power Developer, TSTRANSCO or TSTRANSCO/DISCOM shall will prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer Solar Power Developer has to bear the entire cost of the Interconnection Facilities as per the approved estimate made by sanctioned estimate. 3.2 TSTRANSCO or DISCOM. Provided that the TSTRANSCO or and DISCOM may allow also permit the Solar Power Developer to execute the Interconnection Facilities for power evacuation as per the approved sanctioned estimate at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension and bay extension is not feasible, then the bidder shall procure land and undertake bay extension at its own cost. Further procedure in case the project connects to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the SPD shall invariably pay land cost for bays whether existing or to be constructed, to TSTRANSCOvogue. 3.2 3.3 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station Interconnection Substation from time to time and necessary expenditure shall bear have to be borne by the necessary expenditureSolar Power Developer. The maintenance work of at the grid sub-station and connected bay together with and equipment at the interconnection substation has to be done in coordination with the TSTRANSCO and DISCOM personnelauthorities. Where TSTRANSCO or If TSTRANSCO/DISCOM carries out carryout the maintenance O&M work, the solar power developer producer shall pay the such expenses to TSTRANSCO or TSTRANSCO/DISCOM as applicable. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut,. 3.3 3.4 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may beand DISCOM. 3.4 3.5 DISCOM reserves the right to add any additional loads on the feeder without detriment to the existing generator/solar plants on the same feeder. 3.6 The solar power developer Solar Power Developer shall be responsible to operate the Project as per envisaged under this Agreement and & to provide appropriate facility or instrumentation or facility/ instrumentation/metering arrangement as per Clause 4.1. 3.5 3.7 The solar power developer Solar Power Developer shall use components or deploy components/equipment for the SPV complying with approved or approved/minimum technical standards as per the International Electro-Electro technical Commission (“IEC”) or & Bureau of Indian Standards (“BIS”) or technical standards that are prescribed as specified by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developerSolar Power Developer.

Appears in 1 contract

Samples: Power Purchase Agreement

INTERCONNECTION FACILITIES, SYNCHRONIZATION, COMMISSIONING AND COMMERCIAL OPERATIONS. 3.1 Upon receipt of a requisition from the The Solar Power Developer, TSTRANSCO or DISCOM shall prepare an estimate of cost for arranging the Interconnection Facilities for power evacuation at the Voltage of Delivery. The solar power developer Developer has to bear the entire cost of the Interconnection Facilities as per the approved sanctioned DISCOM estimate made by TSTRANSCO or DISCOM. Provided that the TSTRANSCO or DISCOM may allow the Solar Power Developer to execute the for arranging Interconnection Facilities for power evacuation as per at the approved estimate Voltage of Delivery. 3.2 The Solar Power Developer shall also be responsible for obtaining any permits/ consents required for interconnection at its discretion duly collecting the supervision charges as per the solar policy of the Government of Telangana from time to time. In case the project connects to a 33 / 11 kV interconnection substation where available capacity is subject to bay extension sub-station and bay extension is not feasible, then the bidder shall procure land and undertake bay extension will be solely responsible for liaising at its own cost with any government body/ department for obtaining such a consent/ permit 3.3 The interconnection line from Project switchyard to the location has to be constructed and maintained by the SPD at his cost. Further in case The entire cost of transmission including cost of procurement of land for bay (if any), construction of lines, metering equipment, losses, supervision charges etc., from the project connects Project up to EHT interconnection substations of 132/33, 220/132 KV and 400/220 KV, the Interconnection Point shall be borne by the SPD and shall invariably pay land cost for bays whether existing or to not be constructed, to TSTRANSCOreimbursed. 3.2 3.4 The Solar Power Developer shall own, operate and maintain Interconnection Facilities from Project to grid sub-station from time to time and necessary expenditure shall bear have to be borne by the necessary expenditureSolar Power Developer. The maintenance work of at the grid sub-station and connected bay together with and equipment at the interconnection substation has to be done in coordination with the TSTRANSCO and DISCOM personnel. Where TSTRANSCO or DISCOM carries out the maintenance work, the solar power developer shall pay the expenses to TSTRANSCO or DISCOM as applicable. The SPD have to be handed over to the licensee concerned, the facilities provided at interconnection point at a depreciated value as approved by the Commission in case the agreement is not extended or the project is shut, 3.3 Any modifications or procedures or changes in arranging the Interconnection Facilities for power evacuations shall rest with TSTRANSCO or DISCOM as the case may beauthorities. 3.4 3.5 The solar power developer Solar Power Developer shall be responsible to operate the Project as per envisaged under this Agreement and & to provide appropriate facility or instrumentation or facility/ instrumentation/ metering arrangement as per Clause 4.1. 3.5 3.6 The solar power developer Solar Power Developer shall use components or deploy components/equipment for the STP/SPV complying with approved or approved/minimum technical standards as per the International Electro-Electro technical Commission (“IEC”) or & Bureau of Indian Standards (“BIS”) or technical standards that are prescribed as specified by the Ministry of New and Renewable Energy (“MNRE”) as amended from time to time at the cost of the solar power developerSolar Power Developer.

Appears in 1 contract

Samples: Power Purchase Agreement