Common use of INTERFACE POINTS Clause in Contracts

INTERFACE POINTS. The feedwater tie-point is located on the pipe rack at the eastern corner of the site, shall be in general accordance with the following: • Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Insulation: ***** • Pressure: ***** • Temperature: ***** • Tie-Point Coordinates [1]: ***** [1]: Tie-points coordinates specified are located at the Provider/Off-Taker fence line. [2]: Approximate elevation subject to final pipe rack design with allowance for 18’ of nominal clearance from bottom of truss to roadway. SCHEDULE 1.11 Schedule 1.11 Coke Interface

Appears in 3 contracts

Samples: Processing Agreement (SunCoke Energy, Inc.), Processing Agreement (SunCoke Energy, Inc.), Processing Agreement (SunCoke Energy, Inc.)

AutoNDA by SimpleDocs

INTERFACE POINTS. The feedwater tie-point is located on the pipe rack at the eastern corner of the site, shall be in general accordance with the following: • Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Insulation: ***** • Pressure: ***** • Temperature: ***** • Tie-Point Coordinates [1]: ***** [1]: Tie-points coordinates specified are located at the Provider/Off-Taker fence line. [2]: Approximate elevation subject to final pipe rack design with allowance for 18’ of 18’of nominal clearance from bottom of truss to roadway. SCHEDULE 1.11 Schedule 1.11 Coke Interface1.11

Appears in 1 contract

Samples: Processing Agreement (SunCoke Energy, Inc.)

INTERFACE POINTS. The feedwater tie-point is located on the pipe rack at the eastern corner of the site, shall be in general accordance with the following: • Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Insulation: ***** • Pressure: ***** • Temperature: ***** • Tie-Point Coordinates [1]: ***** [1]: Tie-points coordinates specified are located at the Provider/Off-Taker fence line. [2]: Approximate elevation subject to final pipe rack design with allowance for 18’ of 18’of nominal clearance from bottom of truss to roadway. SCHEDULE 1.11 Schedule 1.11 Coke Interface

Appears in 1 contract

Samples: Processing Agreement (SunCoke Energy, Inc.)

AutoNDA by SimpleDocs

INTERFACE POINTS. The feedwater tie-point is located on the pipe rack at the eastern corner of the site, shall be in general accordance with the following: • Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Insulation: ***** • Pressure: ***** • Temperature: ***** • Tie-Point Coordinates [1]: ***** [1]: Tie-points coordinates specified are located at the Provider/Off-Taker fence line. [2]: Approximate elevation subject to final pipe rack design with allowance for 18’ of 18’of nominal clearance from bottom of truss to roadway. SCHEDULE 1.11 Schedule 1.11 Coke Interface

Appears in 1 contract

Samples: Coke Sale and Feed Water Processing Agreement