Interference Floor Shaping Sample Clauses

Interference Floor Shaping. As mentioned above, the distances to strong transmitters as seen from an individual UE might in some cases be very large, when distant transmitters have almost line-of-sight channels to an UE. Countering such effects by forming cooperation areas over 7 or more sites seems to be unrealistic and ineffective. Therefore, these far-off interferers will generate an interference floor that may significantly limit the potential CoMP gains. This is illustrated by the 2-user rate region in Figure 5.4. Assuming an interference limited scenario with a very low noise floor, the rate region without cooperation will be limited by the inter-cell interference (blue area). The optimum rate region with CoMP is (or might be) just limited by the maximum modulation and coding schemes (MCS) for example 64QAM9/10 for LTE. This assumes that that the interference from other clusters is below the noise floor. In case there is a noise floor generated by the out-of- cluster cells, the rate region will be reduced significantly to the red area. (A similar effect would happen in case of a significant noise floor, but this would violate our main assumption of being in an interference-limited scenario.) Interference floor shaping as such is difficult to achieve in conventional networks as there is typically a trade-off between reduced interference at the outside of the cell versus signal quality within the cell, leaving relatively little room for optimization. From the beginning of cellular radio systems, antenna tilting has been used to localize signal power to the vicinity of the base stations. It is commonly used with good results for network planning [WLS+00].16 16 For the LTE Advanced case 1, increasing and optimizing the antenna tilts for all eNBs from 7 to 15 degree provided a substantial gain in spectral efficiency helping to fulfil the target requirements of e.g.
AutoNDA by SimpleDocs

Related to Interference Floor Shaping

  • Cost of the Work § 6.1 For purposes of this Agreement, the Cost of the Work shall be the total cost to the Owner to construct all elements of the Project designed or specified by the Architect and shall include contractors’ general conditions costs, overhead and profit. The Cost of the Work also includes the reasonable value of labor, materials, and equipment, donated to, or otherwise furnished by, the Owner. The Cost of the Work does not include the compensation of the Architect; the costs of the land, rights-of-way, financing, or contingencies for changes in the Work; or other costs that are the responsibility of the Owner.

  • MAINTENANCE OF THE BUILDING /APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the Association upon the issuance of the completion certificate of the Project. The cost of such maintenance has been included in the Total Extras and Deposits as mentioned in clause 1.2.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Elevators Landlord shall provide passenger elevator service during normal business hours to Tenant in common with Landlord and all other tenants. Landlord shall provide limited passenger service at other times, except in case of an emergency.

  • Landscaping Maintaining, tending and cultivating and (as necessary) re-stocking any garden or grassed areas including replacing plants, shrubs and trees as necessary.

  • Communications Equipment Members of the board of directors or any committee thereof may participate in and act at any meeting of such board or committee through the use of a conference telephone or other communications equipment by means of which all persons participating in the meeting can hear each other, and participation in the meeting pursuant to this section shall constitute presence in person at the meeting.

  • MAINTENANCE OF THE SAID BUILDING / APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the association of the allottees. The cost of such maintenance has been included in the Total Price of the [Apartment/Plot]. [Insert any other clauses in relation to maintenance of project, infrastructure and equipment]

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

Time is Money Join Law Insider Premium to draft better contracts faster.