Interior Lining Sample Clauses

Interior Lining. All pipes, fittings, and special castings, except sleeves and plugs, shall be cement mortar lined in accordance with ANSI A-21.4 and AWWA C104. Interior linings shall have tapered ends and shall be sealed with a bituminous seal coat.
AutoNDA by SimpleDocs
Interior Lining. The cement mortar lining shall be applied within the cylinder by the centrifugal method to the thickness specified in Table 200-3 and Table 200-4 of these specifications. Two or more external stiffener rings shall be in place around each cylinder during centrifugation of the lining. The end gauge rings and stiffener rings shall limit the deviation from the mean diameter of the cylinder, at any section, to a maximum of 1/2 percent. End gauge rings shall remain in place until the end of the primary cure. Stiffener rings shall also remain in place during primary cure unless equivalent support is provided by other means.

Related to Interior Lining

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;

  • Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:

  • Maintenance and Repair – Line Sharing 3.6.1 C.M. shall have access for repair and maintenance purposes to any Loop for which it has access to the High Frequency Spectrum. If C.M. is using a BellSouth owned splitter, C.M. may access the Loop at the point where the combined voice and data signal exits the central office splitter via a bantam test jack. If C.M. provides its own splitter, it may test from the collocation space or the Termination Point.

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.

  • Landscaping Maintaining, tending and cultivating and (as necessary) re-stocking any garden or grassed areas including replacing plants, shrubs and trees as necessary.

  • Work Area The specific work area and/or crew an employee reports to on a daily schedule. Work areas are generally smaller divisions of a larger Bid Area.

  • Building Maintenance The host facility provider shall maintain (in a state of good repair) all buildings used for the educational program. All damages made by the AGENCY’s program will be the responsibility of the AGENCY to repair.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!