Irrigation Water and Ditch Easements Sample Clauses

Irrigation Water and Ditch Easements. The Project is located entirely upon land upgradient from the primary irrigation source for the area, the Dove Creek Canal. Agriculture is of the dryland variety and as such, the Company is not aware of any potential ditch impacts, nor do any easements appear following comprehensive land surveying and title work. Nonetheless, should the Company be notified of an impact and determine it to be caused by the Project, the Company will, as soon as practicable, develop a plan to rectify the situation.
AutoNDA by SimpleDocs

Related to Irrigation Water and Ditch Easements

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Utility Easements 2.1 Some properties may at the discretion of the Developer be subject to easements in favour of suppliers of water, power, gas, telephone, internet and wastewater utilities and services, including SaskPower for location of a transformer and SaskTel. The Property Owner acknowledges that the location of any transformer and which lots will be affected by any such easements, will not be known until such utility and service providers complete their design work and the Developer has negotiated the terms and conditions thereof. The Property Owner further specifically acknowledges and agrees that the Property may be subject to any such easement, and that the same shall not affect or result in a decrease or abatement of the purchase price of the Property.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Conservation Easement School shall abide by the terms of the Easement, attached as Exhibit “D” and granted by the District to Authority. The Easement shall be recorded against the Subject Property by the Authority, at the Authority’s sole cost and expense. This Easement may be executed and recorded without further approval of the Parties’ governing bodies, except that approval is required to authorize the execution of this Agreement.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Access Easement The Owner shall grant to VBWD the necessary easements and rights-of-way and/or maintain perpetual access from public rights-of-way to the Facility for VBWD, its agent, or contractor.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

Time is Money Join Law Insider Premium to draft better contracts faster.