LABOUR AND PRODUCTS. (a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by Owner, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project in accordance with the Construction Schedule. (b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant. (c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property. (d) At Owner’s instruction, Project Co shall promptly remove from the Site any employee who represents a threat to the safety or progress of the Project or persons on the Project, who is not following the control procedures referred to in Section 11.7(c), or whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner under the Human Rights Code (Ontario). (e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site satisfactory to Owner. (f) Title to the Products shall pass to Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to Owner when paid for. Project Co shall promptly execute and deliver to Owner, from time to time as Owner may require, any further documentation required to identify, evidence, perfect or protect Owner’s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the Phase of the Work until the relevant Phased Occupancy Date in respect of that Phase, and with respect to the balance of the Work, until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion Date.
Appears in 2 contracts
Samples: Project Agreement, Project Agreement
LABOUR AND PRODUCTS. (a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by Owner, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project in accordance with the Construction Schedule.
(b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; and (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) At Owner’s instruction, Project Co shall promptly remove from the Site any employee who represents a threat to the safety or progress of the Project or persons on the Project, who is not following the control procedures referred to in Section 11.7(c), or whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner under the Human Rights Code (Ontario).
(e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site satisfactory to Owner.
(f) Title to the Products shall pass to Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to Owner when paid for. Project Co shall promptly execute and deliver to Owner, from time to time as Owner may require, any further documentation required to identify, evidence, perfect or protect Owner’s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding Notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the each applicable Phase of the Work until the relevant applicable Phased Occupancy Date, the Phase 1 Work until the date of issuance by the Consultant of its certificate under Section 16.1(d) stating the Phase 1 Completion Date in respect of that Phase, and with respect to the balance of the Work, until the date of issuance by the Consultant of its certificate under Section 16.1(e16.2(e) stating the Substantial Completion Date.
Appears in 2 contracts
Samples: Project Agreement, Project Agreement
LABOUR AND PRODUCTS. (a) 3.9.1 Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co the Contractor by the Owner, Project Co the Contractor shall provide and pay for labour, Products, tools, construction machinery and equipment, water, heat, light, power, transportation and other facilities and services necessary for the performance of the Work in accordance with the Contract and shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Worksuch services. Project Co The Contractor shall arrange for delivery of for materials and equipment to the Project in accordance with the Construction Schedule.
(b) 3.9.2 Products provided shall be new. All work will be new, of good quality, and free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co 3.9.3 The Contractor shall (i) maintain good order and discipline among all personnel engaged in respect of on the Work and shall promote and maintain a good relationship with all such personnel; (ii) personnel engaged on the Work, shall not employ any persons to perform the Work who is/are whose labour affiliation, or lack thereof is incompatible with other labour employed by Project Co the Contractor in connection with the Work; , comply with all applicable trade union agreements and (iii) act promptly on all problems of labour relations including grievances and grievances, jurisdictional disputes, and interpretations of any applicable trade union agreements. Project Co The Contractor shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) 3.9.4 At the Owner’s instruction, Project Co the Contractor shall promptly remove from the Site Place of the Work any employee who represents a threat to the safety or progress of the Project or persons on the Project, who is not following the control procedures referred to in Section 11.7(c), Project or whose conduct may be considered as harassment in the workplace of any person who is an employee of the Owner under the Human Rights Code (Ontario).
(e) Project Co 3.9.5 The Contractor is responsible for the safe on-site storage of Products and their protection (including Products supplied by the Owner and other contractors) in such a way so ways as to avoid dangerous conditions or contamination to the Products or other persons or property, property and in locations at the Site satisfactory Place of the Work to Ownerthe satisfaction of the Consultant.
(f) 3.9.6 Title to the Products shall pass to the Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to the Owner when paid for. Project Co The Contractor shall promptly execute and deliver to the Owner, from time to time as the Owner may require, any further documentation required to identify, evidence, perfect or protect the Owner’s interest in the ProductsProducts including without limitation, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding Notwithstanding the foregoing, Project Co the Contractor shall continue to bear the risk of loss or damage with respect to the Phase each phase of the Work until the relevant Phased Occupancy Date in respect of that Phasephase, with respect to the Interim Work until the Interim Completion Date, and with respect to the balance of the Work, Work until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion Performance Date.
Appears in 2 contracts
Samples: Guaranteed Price Contract, Guaranteed Price Contract
LABOUR AND PRODUCTS. (a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by OwnerHMQ, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project Projects in accordance with the Construction Schedule.
(b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) At OwnerHMQ’s instruction, Project Co shall promptly remove from the Site Sites any employee who represents a threat to the safety or progress of the Project Projects or persons on the Project, who is not following the control procedures referred to in Section 11.7(c), Projects or whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner HMQ or a Sponsor under the Human Rights Code (Ontario).
(e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner HMQ and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site Sites satisfactory to OwnerHMQ.
(f) Title to the Products shall pass to Owner HMQ upon payment therefor thereof or upon incorporation into the a Project, whichever occurs first. For greater certainty, title to Products delivered, delivered but not installed, shall pass to Owner HMQ when paid for. .
(g) Project Co shall promptly execute and deliver to Owner, HMQ from time to time time, as Owner HMQ may require, any further documentation required to identify, evidence, perfect or protect OwnerHMQ’s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the Phase of the Work any Products until the relevant Phased Occupancy Date in respect of that Phase, and with respect to the balance of the Work, until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion Date.
Appears in 1 contract
Samples: Project Agreement
LABOUR AND PRODUCTS. (a) 3.9.1 Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co the Contractor by the Owner, Project Co the Contractor shall provide and pay for labour, Products, tools, construction machinery and equipment, water, heat, light, power, transportation and other facilities and services necessary for the performance of the Work in accordance with the Contract and shall, as appropriate, provide separate metering for all such services and facilities necessary for the performance of the Work. Project Co The Contractor shall arrange for delivery of for materials and equipment to the Project in accordance with the Construction Schedule.
(b) 3.9.2 Products provided shall be new. All work will be new, of good quality, and free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co 3.9.3 The Contractor shall (i) maintain good order and discipline among all personnel engaged in respect of on the Work and shall promote and maintain a good relationship with all such personnel; (ii) personnel engaged on the Work, shall not employ any persons to perform the Work who is/are whose labour affiliation, or lack thereof is incompatible with other labour employed by Project Co the Contractor in connection with the Work; , comply with all applicable trade union agreements and (iii) act promptly on all problems of labour relations including grievances and grievances, jurisdictional disputes, and interpretations of any applicable trade union agreements. Project Co The Contractor shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) 3.9.4 At the Owner’s instruction, Project Co the Contractor shall promptly remove from the Site Place of the Work any employee who represents a threat to the safety or progress of the Project or persons on the Project, who is not following the control procedures referred to in Section 11.7(c), Project or whose conduct may be considered as harassment in the workplace of any person who is an employee of the Owner under the Human Rights Code (Ontario).
(e) Project Co 3.9.5 The Contractor is responsible for the safe on-site storage of Products and their protection (including Products supplied by the Owner and other contractors) in such a way so ways as to avoid dangerous conditions or contamination to the Products or other persons or property, property and in locations at the Site satisfactory Place of the Work to Ownerthe satisfaction of the Consultant.
(f) 3.9.6 Title to the Products shall pass to the Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to the Owner when paid for. Project Co The Contractor shall promptly execute and deliver to the Owner, from time to time as the Owner may require, any further documentation required to identify, evidence, perfect or protect the Owner’s interest in the ProductsProducts including without limitation, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding Notwithstanding the foregoing, Project Co the Contractor shall continue to bear the risk of loss or damage with respect to the Phase each phase of the Work until the relevant Phased Occupancy Date in respect of that Phase, phase and with respect to the balance of the Work, Work until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion Performance Date.
Appears in 1 contract
Samples: Guaranteed Price Contract
LABOUR AND PRODUCTS. (a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by Owner, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project in accordance with the Construction Schedule.
(b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; and (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) At Owner’s instruction, Project Co shall promptly remove from the Site any employee who represents a threat to the safety or progress of the Project or persons on the Project, who is not following the control procedures referred to in Section 11.7(c), or whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner under the Human Rights Code (Ontario).
(e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site satisfactory to Owner.
(f) Title to the Products shall pass to Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to Owner when paid for. Project Co shall promptly execute and deliver to Owner, from time to time as Owner may require, any further documentation required to identify, evidence, perfect or protect Owner’s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the Phase of the Work until the relevant Phased Occupancy Date in respect of that Phase, and with respect to the balance of the Work, until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion Date.
Appears in 1 contract
Samples: Project Agreement
LABOUR AND PRODUCTS. (a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by Owner, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project in accordance with the Construction Schedule.
(b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; and (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property. Project Co shall not employ any persons to perform Work whose labour affiliation, or lack thereof, is incompatible with other labour employed in connection with the Work. Any costs arising from labour disputes, as a result of the employment of any such person by Project Co, its subcontractors or suppliers shall be at the sole expense of Project Co. Any Contractor, Subcontractors, Sub-Subcontractors or Supplier performing the Work in respect of the Project at the Site must be unionized, except for any Contractor, Subcontractors, Sub-Subcontractors or Supplier specifically named in the Specifications as being a Contractor, Subcontractor, Sub-Subcontractor or Supplier that Project Co is required to engage.
(d) At Owner’s instruction, Project Co shall promptly remove from the Site any employee who represents a threat to the safety or progress of the Project or persons on the Project, who is not following the control procedures referred to in Section 11.7(c), or whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner under the Human Rights Code (Ontario).
(e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site satisfactory to Owner.
(f) Title to the Products shall pass to Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to Owner when paid for. Project Co shall promptly execute and deliver to Owner, from time to time as Owner may require, any further documentation required to identify, evidence, perfect or protect Owner’s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the Phase of the Work until the relevant Phased Occupancy Date in respect of that Phase, and with respect to the balance of the Work, until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion Date.
Appears in 1 contract
Samples: Project Agreement
LABOUR AND PRODUCTS. (a) 3.9.1 Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co the Contractor by the Owner, Project Co the Contractor shall provide and pay for labour, Products, tools, construction machinery and equipment, water, heat, light, power, transportation and other facilities and services necessary for the performance of the Work in accordance with the Contract and shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Worksuch services. Project Co The Contractor shall arrange for delivery of for such materials and equipment to the Project in accordance with the Construction Schedule.
(b) 3.9.2 Products provided shall be new. All work will be new, of good quality, and free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co 3.9.3 The Contractor shall (i) maintain good order and discipline among all personnel engaged in respect of on the Work and shall promote and maintain a good relationship with all such personnel; (ii) shall not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co the Contractor in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co The Contractor shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) 3.9.4 At the Owner’s instruction, Project Co the Contractor shall promptly remove from the Site Place of the Work any employee who represents a threat to the safety or progress of the Project or persons on the Project, or who is not following the instructions and the control procedures referred to in Section 11.7(c), GC 3.12.5 or whose conduct may be considered as harassment in the workplace of any person who is an employee of the Owner under the Human Rights Code (Ontario).
(e) Project Co 3.9.5 The Contractor is responsible for the safe on-site storage of Products and their protection (including Products supplied by the Owner and other contractors) in such a way so ways as to avoid dangerous conditions or contamination to the Products or other persons or property, property and in locations at the Site satisfactory Place of the Work to the satisfaction of the Owner.
(f) 3.9.6 Title to the Products shall pass to the Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to the Owner when paid for. Project Co The Contractor shall promptly execute and deliver to the Owner, from time to time as the Owner may require, any further documentation required to identify, evidence, perfect or protect the Owner’s interest in the ProductsProducts including without limitation, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding Notwithstanding the foregoing, Project Co the Contractor shall continue to bear the risk of loss or damage with respect to the Phase of the Interim Work until the relevant Phased Occupancy Date in respect of that PhaseInterim Completion Date, and with respect to the balance of the Work, Work until the date of issuance by the Consultant of its certificate under Section 16.1(e) GC 5.5.5 stating the Substantial Completion Performance Date.
Appears in 1 contract
Samples: Guaranteed Price Contract
LABOUR AND PRODUCTS. (a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by OwnerTHP, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project in accordance with the Construction Schedule.
(b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) At OwnerTHP’s instruction, Project Co shall promptly remove from the Site any employee who represents a threat to the safety or progress of the Project or persons on the Project, Project who is are not following the control procedures referred to in Section 11.7(c), ) or whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner THP under the Human Rights Code (Ontario).
(e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner THP and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site satisfactory to OwnerTHP.
(f) Title to the Products shall pass to Owner THP upon payment therefor thereof or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, delivered but not installed, shall pass to Owner THP when paid for. .
(g) Project Co shall promptly execute and deliver to Owner, THP from time to time time, as Owner THP may require, any further documentation required to identify, evidence, perfect or protect OwnerTHP’s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the each applicable Phase of the Work until the relevant applicable Phased Occupancy Date in respect of that Phase, and with respect to the balance of the Work, Work until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion Date.
Appears in 1 contract
Samples: Project Agreement
LABOUR AND PRODUCTS. (a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by Owner, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project in accordance with the Construction Schedule.
(b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) At Owner’s instruction, Project Co shall promptly remove from the Site any employee who represents a threat to the safety or progress of the Project or persons on the Project, who is not following the control procedures referred to in Section 11.7(c), or whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner under the Human Rights Code (Ontario).
(e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site satisfactory to Owner.
(f) Title to the Products shall pass to Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to Owner when paid for. Project Co shall promptly execute and deliver to Owner, from time to time as Owner may require, any further documentation required to identify, evidence, perfect or protect Owner’s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the Phase of the 1 Work until the relevant Phased Occupancy date of issuance by the Consultant of its certificate under Section 16.1(d) stating the Phase 1 Completion Date in respect of that Phase, and with respect to the balance of the Work, until the date of issuance by the Consultant of its certificate under Section 16.1(e16.2(e) stating the Substantial Completion Date.
Appears in 1 contract
Samples: Project Agreement
LABOUR AND PRODUCTS. (a) 3.9.1 Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co the Contractor by the Owner, Project Co the Contractor shall provide and pay for labour, Products, tools, construction machinery and equipment, water, heat, light, power, transportation and other facilities and services necessary for the performance of the Work in accordance with the Contract and shall, as appropriate, provide separate metering for all such services and facilities necessary for the performance of the Work. Project Co The Contractor shall arrange for delivery of for such materials and equipment to the Project in accordance with the Construction Schedule.
(b) 3.9.2 Products provided shall be new. All work will be new, of good quality, and free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co 3.9.3 The Contractor shall (i) maintain good order and discipline among all personnel engaged in respect of on the Work and shall promote and maintain a good relationship with all such personnel; (ii) shall not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co the Contractor in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co The Contractor shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) 3.9.4 At the Owner’s instruction, Project Co the Contractor shall promptly remove from the Site Place of the Work any employee who represents a threat to the safety or progress of the Project or persons on the Project, or who is not following the instructions and the control procedures referred to in Section 11.7(c), GC 3.12.5 or whose conduct may be considered as harassment in the workplace of any person who is an employee of the Owner under the Human Rights Code (Ontario).
(e) Project Co 3.9.5 The Contractor is responsible for the safe on-site storage of Products and their protection (including Products supplied by the Owner and other contractors) in such a way so ways as to avoid dangerous conditions or contamination to the Products or other persons or property, property and in locations at the Site satisfactory Place of the Work to the satisfaction of the Owner.
(f) 3.9.6 Title to the Products shall pass to the Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to the Owner when paid for. Project Co The Contractor shall promptly execute and deliver to the Owner, from time to time as the Owner may require, any further documentation required to identify, evidence, perfect or protect the Owner’s interest in the ProductsProducts including without limitation, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding Notwithstanding the foregoing, Project Co shall continue the Contractor shall, subject to bear the risk of loss or damage with respect to the Phase of the Work until the relevant Phased Occupancy Date in respect of that Phase, and with respect to the balance of the Work, until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion DateGC 9.
Appears in 1 contract
Samples: Guaranteed Price Contract
LABOUR AND PRODUCTS. (a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by OwnerCHH, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project in accordance with the Construction Schedule.
(b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) At OwnerCHH’s instruction, Project Co shall promptly remove from the Site any employee who represents a threat to the safety or progress of the Project or persons on the Project, who is not following the control procedures referred to in Section 11.7(c), or Project whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner CHH under the Human Rights Code (Ontario).
(e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner CHH and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site satisfactory to OwnerCHH.
(f) Title to the Products shall pass to Owner CHH upon payment therefor thereof or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, delivered but not installed, shall pass to Owner CHH when paid for. .
(g) Project Co shall promptly execute and deliver to Owner, CHH from time to time time, as Owner CHH may require, any further documentation required to identify, evidence, perfect or protect OwnerCHH’s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the Phase of the Work any Products until the relevant Phased Occupancy Date in respect of that Phase, and with respect to the balance of the Work, until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion Date.
Appears in 1 contract
Samples: Project Agreement
LABOUR AND PRODUCTS. (a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by Owner, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project in accordance with the Construction Schedule.
(b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) At Owner’s Owner‟s instruction, Project Co shall promptly remove from the Site any employee who represents a threat to the safety or progress of the Project or persons on the Project, who is not following the control procedures referred to in Section 11.7(c), or whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner under the Human Rights Code (Ontario).
(e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site satisfactory to Owner.
(f) Title to the Products shall pass to Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to Owner when paid for. Project Co shall promptly execute and deliver to Owner, from time to time as Owner may require, any further documentation required to identify, evidence, perfect or protect Owner’s Owner‟s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the each applicable Phase of the Work until the relevant applicable Phased Occupancy Date in respect of that PhaseDate, and with respect to the balance of the Work, Interim Work until the date of issuance by the Consultant of its certificate under Section 16.1(e16.1(d) stating the Interim Completion Date and with respect to the balance of the Work until the date of issuance by the Consultant of its certificate under Section 16.2(e) stating the Substantial Completion Date.
Appears in 1 contract
Samples: Project Agreement
LABOUR AND PRODUCTS. (a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by OwnerSTEGH, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project in accordance with the Construction Schedule.
(b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) At OwnerSTEGH’s instruction, Project Co shall promptly remove from the Site any employee who represents a threat to the safety or progress of the Project or persons on the Project, Project who is are not following the control procedures referred to in Section 11.7(c), ) or whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner STEGH under the Human Rights Code (Ontario).
(e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner STEGH and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site satisfactory to OwnerSTEGH.
(f) Title to the Products shall pass to Owner STEGH upon payment therefor thereof or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, delivered but not installed, shall pass to Owner STEGH when paid for. .
(g) Project Co shall promptly execute and deliver to Owner, STEGH from time to time time, as Owner STEGH may require, any further documentation required to identify, evidence, perfect or protect OwnerSTEGH’s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the Phase of the Work any Products until the relevant Phased Occupancy Date in respect of that Phase, and with respect to the balance of the Work, until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion Date.
Appears in 1 contract
Samples: Project Agreement
LABOUR AND PRODUCTS. (a) 3.9.1 Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co the Contractor by the Owner, Project Co the Contractor shall provide and pay for labour, Products, tools, construction machinery and equipment, water, heat, light, power, transportation and other facilities and services necessary for the performance of the Work in accordance with the Contract and shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Worksuch services. Project Co The Contractor shall arrange for delivery of for such materials and equipment to the Project in accordance with the Construction Schedule.
(b) 3.9.2 Products provided shall be new. All work will be new, of good quality, and free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co 3.9.3 The Contractor shall (i) maintain good order and discipline among all personnel engaged in respect of on the Work and shall promote and maintain a good relationship with all such personnel; (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co the Contractor in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co The Contractor shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) 3.9.4 At the Owner’s instruction, Project Co the Contractor shall promptly remove from the Site Place of the Work any employee who represents a threat to the safety or progress of the Project or persons on the Project, or who is not following the instructions and the control procedures referred to in Section 11.7(c), GC 3.12.5 or whose conduct may be considered as harassment in the workplace of any person who is an employee of the Owner under the Human Rights Code (Ontario).
(e) Project Co 3.9.5 The Contractor is responsible for the safe on-site storage of Products and their protection (including Products supplied by the Owner and other contractors) in such a way so ways as to avoid dangerous conditions or contamination to the Products or other persons or property, property and in locations at the Site satisfactory Place of the Work to the satisfaction of the Owner.
(f) 3.9.6 Title to the Products shall pass to the Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to the Owner when paid for. Project Co The Contractor shall promptly execute and deliver to the Owner, from time to time as the Owner may require, any further documentation required to identify, evidence, perfect or protect the Owner’s interest in the ProductsProducts including without limitation, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding Notwithstanding the foregoing, Project Co the Contractor shall continue to bear the risk of loss or damage with respect to the Phase each phase of the Work until the relevant Phased Occupancy Date in respect of that Phase, phase and with respect to the balance of the Work, Work until the date of issuance by the Consultant of its certificate under Section 16.1(e) GC 5.5.5 stating the Substantial Completion Performance Date.
Appears in 1 contract
Samples: Guaranteed Price Contract
LABOUR AND PRODUCTS.
(a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by OwnerContracting Authority, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project in accordance with the Construction Schedule.Works Schedule.
(b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) At OwnerContracting Authority’s instruction, Project Co shall promptly remove from the Site any employee who represents a threat to the safety or progress of the Project or persons on the Project, Project who is are not following the control procedures referred to in Section 11.7(c), ) or whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner Contracting Authority under the Human Rights Code (Ontario).
(e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner Contracting Authority and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site satisfactory to OwnerContracting Authority.
(f) Title to the Products shall pass to Owner Contracting Authority upon payment therefor thereof or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, delivered but not installed, shall pass to Owner Contracting Authority when paid for. .
(g) Project Co shall promptly execute and deliver to Owner, Contracting Authority from time to time time, as Owner Contracting Authority may require, any further documentation required to identify, evidence, perfect or protect OwnerContracting Authority’s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the each applicable Phase of the Work until the relevant applicable Phased Occupancy Date in respect of that Phase, and with respect to the balance of the Work, Work until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion Date.
Appears in 1 contract
Samples: Project Agreement
LABOUR AND PRODUCTS. (a) 3.9.1 Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co the Contractor by the Owner, Project Co the Contractor shall provide and pay for labour, Products, tools, construction machinery and equipment, water, heat, light, power, transportation and other facilities and services necessary for the performance of the Work in accordance with the Contract and shall, as appropriate, provide separate metering for all such services and facilities necessary for the performance of the Work. Project Co The Contractor shall arrange for delivery of for materials and equipment to the Project in accordance with the Construction Schedule.
(b) 3.9.2 Products provided shall be new. All work will be new, of good quality, and free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co 3.9.3 The Contractor shall (i) maintain good order and discipline among all personnel engaged in respect of on the Work and shall promote and maintain a good relationship with all such personnel; (ii) personnel engaged on the Work, shall not employ any persons to perform the Work who is/are whose labour affiliation, or lack thereof is incompatible with other labour employed by Project Co the Contractor in connection with the Work; , comply with all applicable trade union agreements and (iii) act promptly on all problems of labour relations including grievances and grievances, jurisdictional disputes, and interpretations of any applicable trade union agreements. Project Co The Contractor shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) 3.9.4 At the Owner’s instruction, Project Co the Contractor shall promptly remove from the Site Place of the Work any employee who in the Consultant’s opinion represents a threat to the safety or progress of the Project or persons on the Project, who is not following the control procedures referred to in Section 11.7(c), Project or whose conduct may be considered as harassment in the workplace of any person who is an employee of the Owner under the Human Rights Code (Ontario).
(e) Project Co 3.9.5 The Contractor is responsible for the safe on-site storage of Products and their protection (including Products supplied by the Owner and other contractors) in such a way so ways as to avoid dangerous conditions or contamination to the Products or other persons or property, property and in locations at the Site satisfactory Place of the Work to Ownerthe satisfaction of the Consultant.
(f) 3.9.6 Title to the Products shall pass to the Owner upon payment therefor or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, but not installed, shall pass to the Owner when paid for. Project Co The Contractor shall promptly execute and deliver to the Owner, from time to time as the Owner may require, any further documentation required to identify, evidence, perfect or protect the Owner’s interest in the ProductsProducts including without limitation, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding Notwithstanding the foregoing, Project Co the Contractor shall continue to bear the risk of loss or damage with respect to the Phase of the Work until the relevant Phased Occupancy Date in respect of that Phase, and with respect to the balance Substantial Performance of the Work, until the date of issuance by the Consultant of its certificate under Section 16.1(e) stating the Substantial Completion Date.
Appears in 1 contract
Samples: Guaranteed Price Contract
LABOUR AND PRODUCTS. (a) Unless otherwise stipulated elsewhere in the Contract Documents or in other documents made available to Project Co by OwnerCMH, Project Co shall, as appropriate, provide separate metering for all services and facilities necessary for the performance of the Work. Project Co shall arrange for delivery of materials and equipment to the Project in accordance with the Construction Schedule.
(b) Products shall be free from faults, improper workmanship and defects and in conformance with the Contract Documents. Products which are not specified shall be of a quality best suited to the purpose required and their use shall be subject to the approval of the Consultant.
(c) Project Co shall (i) maintain good order and discipline among all personnel engaged in respect of the Work and shall promote and maintain a good relationship with all such personnel; (ii) not employ any persons to perform the Work who is/are incompatible with other labour employed by Project Co in connection with the Work; and (iii) act promptly on all problems of labour relations including grievances and jurisdictional disputes. Project Co shall not employ on the Work anyone not skilled in the task assigned to him and shall adopt and enforce regulations with respect to safety, fire prevention, smoking, the use of alcoholic beverages, illegal drugs and other controlled substances and other activities that will or may constitute a danger to life, health or property.
(d) At OwnerCMH’s instruction, Project Co shall promptly remove from the Site any employee who represents a threat to the safety or progress of the Project or persons on the Project, Project who is are not following the control procedures referred to in Section 11.7(c), ) or whose conduct may be considered as harassment in the workplace of any person who is an employee of Owner CMH under the Human Rights Code (Ontario).
(e) Project Co is responsible for the safe on-site storage of Products and their protection (including Products supplied by Owner CMH and other contractors) in such a way so as to avoid dangerous conditions or contamination to the Products or other persons or property, and in locations at the Site satisfactory to OwnerCMH.
(f) Title to the Products shall pass to Owner CMH upon payment therefor thereof or upon incorporation into the Project, whichever occurs first. For greater certainty, title to Products delivered, delivered but not installed, shall pass to Owner CMH when paid for. .
(g) Project Co shall promptly execute and deliver to Owner, CMH from time to time time, as Owner CMH may require, any further documentation required to identify, evidence, perfect or protect OwnerCMH’s interest in the Products, including any registrations pursuant to the Personal Property Security Act (Ontario). Subject to Section 11.19(d), notwithstanding the foregoing, Project Co shall continue to bear the risk of loss or damage with respect to the each applicable Phase of the Work until the relevant applicable Phased Occupancy Date in respect of that PhaseDate, and with respect to the balance of the Work, Work until the date of issuance by the Consultant of its certificate under Section 16.1(e16.2(e) stating the Substantial Completion Date.
Appears in 1 contract
Samples: Project Agreement