Length / Fit of Scrub Pants Sample Clauses

Length / Fit of Scrub Pants. Slacks / Attire: The length of slacks, pants, scrub pants being such that they drag the floor and are being walked on is not appropriate are prohibited for all staff. This also presents an infection control issue. All attire worn is to fit properly, to present a look of professionalism. Wearing skin tight clothing is inappropriate and prohibited for all staff. DRESS CODE
AutoNDA by SimpleDocs

Related to Length / Fit of Scrub Pants

  • Procurement of Small Works Works estimated to cost less than $100,000 equivalent per contract, up to an aggregate amount not to exceed $1,150,000 equivalent, may be procured under lump-sum, fixed-price contracts awarded on the basis of quotations obtained from three (3) qualified domestic contractors in response to a written invitation. The invitation shall include a detailed description of the works, including basic specifications, the required completion date, a basic form of agreement acceptable to the Association, and relevant drawings, where applicable. The award shall be made to the contractor who offers the lowest price quotation for the required work, and who has the experience and resources to complete the contract successfully. Part D: Review by the Association of Procurement Decisions

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • If You Fail to Sign Lease After Approval Unless we authorize otherwise in writing, you and all co-applicants must execute the Lease after your Application is approved. If you or any co-applicant fails to sign as required, we may keep the application deposit as liquidated damages and terminate all further obligation to each other.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Shipping must be Freight On Board Destination to the delivery location designated on the Customer purchase order The Contractor will retain title and control of all goods until delivery is completed and the Customer has accepted the delivery. All risk of transportation and all related charges are the responsibility of the Contractor. The Customer will notify the Contractor and H-GAC promptly of any damaged goods and will assist the Contractor in arranging for inspection. The Contractor must file all claims for visible or concealed damage. Unless otherwise stated in the Agreement, deliveries must consist only of new and unused merchandise.

  • Access to Premises Landlord, its agents, servants, or employees may enter the Premises at reasonable times with reasonable advance notice to Tenant (or an authorized employee of Tenant at the Premises), and at any time, upon reasonable notice to Tenant under the circumstances, in an emergency, to do the following: inspect the Premises; comply with all laws, orders, ordinances and requirements of any governmental unit or authority for which Landlord may be responsible under this Lease, if any; show the Premises to prospective lenders or purchasers and, during the ninety (90) days immediately prior to the expiration of this Lease if Tenant declines to renew for an additional term in accordance with the provisions of this Lease, to prospective tenants, but only if all such showings are accompanied by a representative of Tenant if so requested by Tenant; or post (on the Development, but not within or at the entrance of the Premises) for sale or for lease signs; provided; however, that all such entries shall be completed promptly in a good workmanlike manner so as to cause the least practical interference to Tenant’s business and Tenant’s use of the Premises. In all events, Landlord shall use commercially reasonable efforts to minimize interference with the Premises and Tenant’s business operations thereon. If Landlord’s entry materially and substantially interferes with the conduct of Tenant’s business and/or cause damage to Tenant’s property (and the entry is not needed because of Tenant’s default, negligence or willful misconduct), then in such event the rent and any sums due and payable as additional rents, shall xxxxx in proportion to the extent of the interference and Landlord shall be liable for any damage to Tenant’s property.

  • COMMERCIAL REUSE OF SERVICES The member or user herein agrees not to replicate, duplicate, copy, trade, sell, resell nor exploit for any commercial reason any part, use of, or access to 's sites.

  • Commencement of Services The Consultant shall begin carrying out the Services from the Effective Date or from such other Date specified in the SC.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Teaching Staff Assigned to More Than One Building Each Educator who is assigned to more than one building will be evaluated by the appropriate administrator where the individual is assigned most of the time. The principal of each building in which the Educator serves must review and sign the evaluation, and may add written comments. In cases where there is no predominate assignment, the superintendent will determine who the primary evaluator will be.

Time is Money Join Law Insider Premium to draft better contracts faster.