Line Modifications Outside of Edic Substation Sample Clauses

Line Modifications Outside of Edic Substation. To accommodate the two (2) new 345 kV transmission circuits - Lines 351 and 352 - from Connecting Transmission Owner’s existing 345 xX Xxxx Substation to LS Power’s new 345 kV Princetown Substation, the line positions at the Edic Substation will be shifted. This will require the following line modifications outside of the Edic Substation: • Removal of the existing steel deadend lattice tower (Structure 1-0) on the existing Edic- New Scotland Line 14; • For the new Xxxx-Xxxxxx Rd. Line 14A, installation of one (1) 3-pole steel deadend structure with caisson foundations; • Installation of approximately 975 circuit feet of conductor (in total) from the demarcation points to the station termination structures for Lines 351, 352, and 14A; • Installation of approximately 275 linear feet of optical ground wire (“OPGW”) from the demarcation point to the station termination structure for Line 351; • Installation of approximately 425 linear feet of OPGW from the demarcation point to the station termination structure for Line 352; and SERVICE AGREEMENT NO. 2611 • Installation of approximately 275 linear feet of overhead shield wire (“OHSW”) from the demarcation point to the station termination structure Line 14A. (Note: Conductor and OPGW will match the conductor and OPGW used for the Transmission Project.) All exterior connections to the Edic Substation (e.g., demarcation points) shall be reviewed and accepted by Connecting Transmission Owner during final engineering.
AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.