Lines and Grades, Setting Stakes Sample Clauses

Lines and Grades, Setting Stakes. The Contractor shall give at least five (5) work days notice in writing when he/she will require the services of RMWD for laying out any portion of the work. Elevations shown for various part of the Work refer to the Datum Bench Mark which will be established by RMWD near the site. RMWD will establish the necessary base lines and grades at the surface of the ground and at convenient locations for the construction of the Work. The base line for pipeline construction will be parallel to and offset from the position of the pipeline. From the established base lines and grades, the Contractor shall extend the necessary lines and grades for construction of the Work and shall be responsible for the correctness of same. The Contractor shall preserve all stakes set for lines, grades, or measurements of the Work in their proper places until authorized to move them by RMWD. Any expense incurred in replacing said stakes which the Contractor may have failed to preserve shall be borne by the Contractor. (See Section 00800.)
AutoNDA by SimpleDocs
Lines and Grades, Setting Stakes. The Contractor shall give two working daysnotice in writing when he will require the services of the Engineer for laying out any portion of the work. Elevations shown for the various parts of the work refer to the Datum Bench Mark, which will be established by the Engineer near the site. The Engineer shall establish the necessary base lines at the surface of the ground for the construction of the work. From the established base lines, the Contractor shall extend the necessary lines and grades for construction of the work and shall be responsible for the correctness of the same. The Contractor shall preserve all stakes set for lines, grades, or measurements of the work in their proper places until authorized to move them by the Engineer. Any expense incurred in replacing said stakes shall be borne by the Contractor. Three consecutive points set on the same slope shall be used together in order that any variation from a straight grade can be detected. If any such variation is found, it shall be reported to the Engineer. In the absence of such report, the Contractor shall be responsible for any error in the grade of the finished work. Prior to any request for construction stakes, the Contractor shall have all utility lines located and marked in the field.

Related to Lines and Grades, Setting Stakes

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service and Capacity Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Switching System Hierarchy and Trunking Requirements For purposes of routing CSTC traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to CSTC, the subtending arrangements between CSTC Tandem Switches and CSTC End Office Switches shall be the same as the Tandem/End Office subtending arrangements that CSTC maintains for the routing of its own or other carriers’ traffic.

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Interconnection Product Options Interconnection Customer has selected the following (checked) type of Interconnection Service:

  • Escorting Visitors Visitors to areas where PHI COUNTY discloses to 4 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY is 5 contained shall be escorted and such PHI shall be kept out of sight while visitors are in the area.