LNG Quality Measurement and Title Sample Clauses

LNG Quality Measurement and Title 
AutoNDA by SimpleDocs

Related to LNG Quality Measurement and Title

  • Benchmarks for Measuring Accessibility For the purposes of this Agreement, the accessibility of online content and functionality will be measured according to the W3C’s Web Content Accessibility Guidelines (WCAG) 2.0 Level AA and the Web Accessibility Initiative Accessible Rich Internet Applications Suite (WAI-ARIA) 1.0 for web content, which are incorporated by reference.

  • Safety Measures Awarded vendor shall take all reasonable precautions for the safety of employees on the worksite, and shall erect and properly maintain all necessary safeguards for protection of workers and the public. Awarded vendor shall post warning signs against all hazards created by the operation and work in progress. Proper precautions shall be taken pursuant to state law and standard practices to protect workers, general public and existing structures from injury or damage.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Year 2000 Compatibility Take all action necessary to assure that its computer based systems are able to operate and effectively process data including dates on and after January 1, 2000, and, at the reasonable request of the Administrative Agent or the Required Lenders, provide evidence to the Lenders of such year 2000 compatibility.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of fossil fuel consumption and associated GHG reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site(s) • Develop M&V protocol for pre-installation measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to:

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos. b. Each party agrees to use, and to cause its Permitted Sublicensees to use, the other party’s trademarks only in good faith and in a dignified manner consistent with such party’s use of the trademarks. Upon written notice to the breaching party, the breaching party has 30 days of the date of the written notice to cure the breach or the license will be terminated.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Interim Measures Notwithstanding any requirements for alternative dispute resolution procedures as set forth in Articles 18(B), any party to the Dispute may apply to a court for interim measures (i) prior to the constitution of the arbitral tribunal (and thereafter as necessary to enforce the arbitral tribunal’s rulings); or (ii) in the absence of the jurisdiction of the arbitral tribunal to rule on interim measures in a given jurisdiction. The Parties agree that seeking and obtaining such interim measures shall not waive the right to arbitration. The arbitrators (or in an emergency the presiding arbitrator acting alone in the event one or more of the other arbitrators is unable to be involved in a timely fashion) may grant interim measures including injunctions, attachments and conservation orders in appropriate circumstances, which measures may be immediately enforced by court order. Hearings on requests for interim measures may be held in person, by telephone, by video conference or by other means that permit the parties to the Dispute to present evidence and arguments.

  • Measurement and Billing 5.6.1 For billing purposes, each Party shall pass Calling Party Number ("CPN") information on each call carried over the Traffic Exchange Trunks at such time as the originating switch is equipped for SS7 and from all switches no later than December 31, 1998. At such time as either Party has the ability, as the Party receiving the traffic, to use such CPN information to classify on an automated basis traffic delivered by the other Party as either Local Traffic or Toll Traffic, such receiving Party shall xxxx the originating Party the Local Traffic termination rates, Intrastate Exchange Access rates, or Interstate Exchange Access rates applicable to each minute of Traffic for which CPN is passed, as provided in Exhibit A and applicable Tariffs. 5.6.2 If, under the circumstances set forth in subsection 5.6.1, the originating Party does not pass CPN on up to ten percent (10%) of calls, the receiving Party shall xxxx the originating Party the Local Traffic termination rates, Intrastate Exchange Access rates, Intrastate/Interstate Transit Traffic rates, or Interstate Exchange Access rates applicable to each minute of traffic, as provided in Exhibit A and applicable Tariffs, for which CPN is passed. For the remaining up to ten percent (10%) of calls without CPN information, the receiving Party shall xxxx the originating Party for such traffic as Local Traffic termination rates, Intrastate Exchange Access rates, Intrastate/Interstate Transit Traffic rates, or Interstate Exchange Access rates applicable to each minute of traffic, as provided in Exhibit A and applicable Tariffs, in direct proportion to the minutes of use of calls passed with CPN information. 5.6.3 If the originating Party does not pass CPN on more than ten percent (10%) of calls, or if the receiving Party lacks the ability to use CPN information to classify on an automated basis traffic delivered by the other Party as either Local Traffic or Toll Traffic, and the originating Party chooses to combine Local and Toll Traffic on the same trunk group, it will supply an auditable Percent Local Use ("PLU") report quarterly, based on the previous three months' traffic, and applicable to the following three months. If the originating Party also chooses to combine Interstate and Intrastate Toll Traffic on the same trunk group, it will supply an auditable Percent Interstate Use ("PIU") report quarterly, based on the previous three months' terminating traffic, and applicable to the following three months. In lieu of the foregoing PLU and/or PIU reports, the Parties may agree to provide and accept reasonable surrogate measures for an agreed-upon interim period. 5.6.4 Measurement of billing minutes for purposes of determining terminating compensation shall be in conversation seconds.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!