LNG Vessel Sample Clauses

LNG Vessel. Not Ready for Unloading; Excess Berth Time
AutoNDA by SimpleDocs

Related to LNG Vessel

  • Vessels Each Vessel is

  • Delivery Pressure Seller shall be required to deliver or cause delivery of the Gas to the Point of Delivery and for delivering such Gas at a pressure sufficient to effect such delivery. Notwithstanding anything to the contrary herein, Seller shall have the right but not the obligation to install compression to effect deliveries of Gas hereunder.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Temperature The Committed Gas shall not have a temperature of less than forty degrees Fahrenheit (40°F) nor more than one hundred twenty degrees Fahrenheit (120°F).

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Classification society undertaking Each Borrower shall instruct the classification society referred to in Clause 14.3 (and procure that the classification society undertakes with the Security Trustee) in relation to its Ship:

  • Aircraft The Airframe to be sold by AVSA to the Owner Trustee as provided in the Participation Agreement and to be leased under the Lease (or any permitted substitute airframe thereunder) together with two Engines (whether either is an initial Engine or a Replacement Engine) whether or not any of such initial or Replacement Engines may from time to time be installed on such Airframe or may be installed on any other airframe or on any other aircraft, including any aircraft substituted pursuant to Section 11.03

  • Air Conditioning 35.01 Landlord shall make available to Tenant, and Tenant shall be permitted to use, the base Building equipment presently supplying air-conditioning service to the Premises and any replacements thereof (the “Existing HVAC Equipment”) Monday to Friday from 8:00 a.m. to 6:00 p.m. (i) during the Building’s “Cooling Season” (which is currently May 15 through October 15) for those portions of the Existing HVAC Equipment serving the perimeter portions of the Premises, and (ii) three hundred sixty-five (365) days a year for those portions of the Existing HVAC System serving the interior portions of the Premises, in each instance subject to and in accordance with the provisions of this Article. Landlord represents that as of the date hereof the Existing HVAC Equipment is in working order and has a cooling capacity which is appropriate for normal office use and normal occupancy density, to wit: the Existing HVAC Equipment is designed to make available a capacity of one (1) ton of HVAC per 300 usable square feet, and is designed to deliver a summer-winter temperature of between 72 and 78 degrees Fahrenheit. Landlord shall repair and maintain the Existing HVAC Equipment in good working order and condition, at Landlord’s cost and expense; provided, however, that all other air conditioning systems, equipment and facilities hereafter located in or servicing the Premises (the “Supplemental Systems”) including, without limitation, the ducts, dampers, registers, grilles and appurtenances utilized to distribute conditioned air within the Premises in connection with both the Existing HVAC Equipment and/or the Supplemental Systems (collectively hereinafter referred to as the “HVAC System”), shall be maintained, repaired and operated by Tenant in compliance with all present and future laws and regulations relating thereto at Tenant’s sole cost and expense. The parties acknowledge that as of the date hereof there is a two (2) ton water cooled supplemental air conditioning unit installed at the Premises (the “Existing Supplemental System”). Landlord hereby approves, in concept only, subject to Tenant’s compliance with the applicable provisions of this Lease including, without limitation, the provisions of this Article and of Article 8, above, Tenant’s installation, at Tenant’s sole cost and expense, of an additional three (3) ton supplemental air conditioning unit (or, should Tenant elect to remove the Existing Supplemental System, then Tenant’s installation of a five (5) ton supplemental air conditioning unit) to service the Premises (the “Additional Supplemental System”). Tenant shall pay for all electricity consumed in the operation of the HVAC System (and/or water, gas and steam) for the production of chilled and/or condenser water and its supply to the Premises, if applicable, which shall become the obligation of Tenant subject to the terms of Article 41 of this Lease. Tenant shall pay for all parts and supplies necessary for the proper operation of the HVAC System (other than the Existing HVAC Equipment) (and any restoration or replacement by Tenant of all or any part thereof shall be in quality and class at least equal to the original work or installations); provided, however, that Tenant shall not alter, modify, remove or replace the HVAC System, or any part thereof, without Landlord’s prior written consent, except that Tenant may remove the Existing Supplemental System in conjunction with Tenant’s installation of a five (5) ton replacement unit as contemplated hereinabove.

  • Control Areas Tenant shall be allowed to utilize up to its pro rata share of the Hazardous Materials inventory within any control area or zone (located within the Premises), as designated by the applicable building code, for chemical use or storage. As used in the preceding sentence, Tenant’s pro rata share of any control areas or zones located within the Premises shall be determined based on the rentable square footage that Tenant leases within the applicable control area or zone. For purposes of example only, if a control area or zone contains 10,000 rentable square feet and 2,000 rentable square feet of a tenant’s premises are located within such control area or zone (while such premises as a whole contains 5,000 rentable square feet), the applicable tenant’s pro rata share of such control area would be 20%.

Time is Money Join Law Insider Premium to draft better contracts faster.