LNG Vessel Not Ready for Unloading Sample Clauses

LNG Vessel Not Ready for Unloading. Excess Berth Time
AutoNDA by SimpleDocs
LNG Vessel Not Ready for Unloading. If any LNG Vessel, previously believed to be ready for unloading, is determined to be not ready after being berthed, Buyer’s Facility may direct the LNG Vessel’s master to vacate the berth and proceed to anchorage, whether or not other LNG vessels are awaiting the berth, unless it appears reasonably certain to Buyer’s Facility that such LNG Vessel can be made ready without disrupting the overall unloading schedule of Buyer’s Facility or operations of Buyer’s Facility. When an unready LNG Vessel at anchorage becomes ready for unloading, its master shall notify Buyer. Upon the re-berthing of any LNG Vessel vacated pursuant to this Section 5.8, Seller shall be responsible for any actual costs incurred by Buyer acting as a Reasonable and Prudent Person as a result of such LNG Vessel not being ready for unloading. If an LNG Vessel is ready for unloading and Buyer or Buyer’s Facility nonetheless directs the LNG Vessel to vacate the berth, Buyer shall indemnify and hold Seller harmless for all Liabilities resulting from causing the LNG Vessel to leave the berth and delay discharging the Cargo.

Related to LNG Vessel Not Ready for Unloading

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Vessels Each Vessel is

  • Delivery Pressure Seller shall be required to deliver or cause delivery of the Gas to the Point of Delivery and for delivering such Gas at a pressure sufficient to effect such delivery. Notwithstanding anything to the contrary herein, Seller shall have the right but not the obligation to install compression to effect deliveries of Gas hereunder.

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • Air Conditioning 35.01 Landlord shall make available to Tenant, and Tenant shall be permitted to use, the base Building equipment presently supplying air-conditioning service to the Premises and any replacements thereof (the “Existing HVAC Equipment”) Monday to Friday from 8:00 a.m. to 6:00 p.m. (i) during the Building’s “Cooling Season” (which is currently May 15 through October 15) for those portions of the Existing HVAC Equipment serving the perimeter portions of the Premises, and (ii) three hundred sixty-five (365) days a year for those portions of the Existing HVAC System serving the interior portions of the Premises, in each instance subject to and in accordance with the provisions of this Article. Landlord represents that as of the date hereof the Existing HVAC Equipment is in working order and has a cooling capacity which is appropriate for normal office use and normal occupancy density, to wit: the Existing HVAC Equipment is designed to make available a capacity of one (1) ton of HVAC per 300 usable square feet, and is designed to deliver a summer-winter temperature of between 72 and 78 degrees Fahrenheit. Landlord shall repair and maintain the Existing HVAC Equipment in good working order and condition, at Landlord’s cost and expense; provided, however, that all other air conditioning systems, equipment and facilities hereafter located in or servicing the Premises (the “Supplemental Systems”) including, without limitation, the ducts, dampers, registers, grilles and appurtenances utilized to distribute conditioned air within the Premises in connection with both the Existing HVAC Equipment and/or the Supplemental Systems (collectively hereinafter referred to as the “HVAC System”), shall be maintained, repaired and operated by Tenant in compliance with all present and future laws and regulations relating thereto at Tenant’s sole cost and expense. The parties acknowledge that as of the date hereof there is a two (2) ton water cooled supplemental air conditioning unit installed at the Premises (the “Existing Supplemental System”). Landlord hereby approves, in concept only, subject to Tenant’s compliance with the applicable provisions of this Lease including, without limitation, the provisions of this Article and of Article 8, above, Tenant’s installation, at Tenant’s sole cost and expense, of an additional three (3) ton supplemental air conditioning unit (or, should Tenant elect to remove the Existing Supplemental System, then Tenant’s installation of a five (5) ton supplemental air conditioning unit) to service the Premises (the “Additional Supplemental System”). Tenant shall pay for all electricity consumed in the operation of the HVAC System (and/or water, gas and steam) for the production of chilled and/or condenser water and its supply to the Premises, if applicable, which shall become the obligation of Tenant subject to the terms of Article 41 of this Lease. Tenant shall pay for all parts and supplies necessary for the proper operation of the HVAC System (other than the Existing HVAC Equipment) (and any restoration or replacement by Tenant of all or any part thereof shall be in quality and class at least equal to the original work or installations); provided, however, that Tenant shall not alter, modify, remove or replace the HVAC System, or any part thereof, without Landlord’s prior written consent, except that Tenant may remove the Existing Supplemental System in conjunction with Tenant’s installation of a five (5) ton replacement unit as contemplated hereinabove.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Materials of Environmental Concern have not been transported or disposed of from the Properties in violation of, or in a manner or to a location that could give rise to liability under, any Environmental Law, nor have any Materials of Environmental Concern been generated, treated, stored or disposed of at, on or under any of the Properties in violation of, or in a manner that could give rise to liability under, any applicable Environmental Law;

  • Trash Tenant shall not allow anything to be placed on the outside of the Building, nor shall anything be thrown by Tenant out of the windows or doors, or down the corridors, elevator shafts, or ventilating ducts or shafts of the Building. All trash shall be placed in receptacles provided by Tenant on the Premises or in any receptacles provided by Landlord for the Building.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • HEATING, VENTILATING AND AIR CONDITIONING The Tenant will operate and regulate those portions of the heating, ventilating, and air conditioning equipment within and serving the Leased Premises so as to maintain such reasonable conditions of temperature and humidity within the Leased Premises as are determined by the Landlord and its Architect and engineers so that no direct or indirect appropriation of the heating, ventilating and air conditioning from the other portions of the Building occurs. The Tenant shall comply with such stipulations and with all Rules and Regulations of the Landlord pertaining to the operation and regulation of such equipment. The Tenant shall immediately notify the Landlord in the event that any repairs are required to the heating, ventilating and air conditioning equipment serving the Leased Premises and shall reimburse the Landlord as part of its Proportionate Share of Operating Costs for the cost of any maintenance, repairs or replacements made by the Landlord in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises. The Landlord acknowledges that the Tenant shall not be responsible for the cost of capital repairs and capital replacements in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises provided that such capital repairs and capital replacements are not necessitated by the Tenant's incorrect or negligent use of equipment. The Tenant shall not under any circumstances go onto the roof of the Building or make any maintenance repairs or replacements to the heating, ventilating and air conditioning systems in the Building without the prior written consent of the Landlord. If the Tenant fails to comply with such stipulations and Rules and Regulations, the Landlord shall be entitled to take such steps as it deems advisable to correct such defaults (including, without limitation, entering upon the Leased Premises and assuming control of such equipment) without liability to the Tenant, and the Tenant will pay to the Landlord forthwith upon demand as Additional Rent all costs and expenses incurred by the Landlord in so doing. The Landlord represents and warrants to the Tenant that the heating, ventilating and air conditioning equipment serving the Leased Premises and required to be installed by the Landlord pursuant to Schedule "C" is and will be at the Commencement Date in good working order and condition.

Time is Money Join Law Insider Premium to draft better contracts faster.