LP/LT Samples Pumps Sample Clauses

LP/LT Samples Pumps. The LP/LT sample pumps are designed with material to prevent contamination of the sample. The sample flow of the LP/LT samples pressures and existing power requirements is listed in Table 8 below. Table 8: LP Sample Pumps (existing) Requirements Sample Sample Pump Pressure Requirements Power Requirements (kW) Suction Pressure [kPa Abs] Discharge Pressure [kPa] Boiler Feed Pump Condensate Extraction 4 250 0.55 HP Condenser 4 250 0.55 LP Condenser 4 250 0.55 CPP A 4 250 0.55 CPP B 4 250 0.55 CPP C 4 250 0.55
AutoNDA by SimpleDocs

Related to LP/LT Samples Pumps

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Biological Samples If so specified in the Protocol, Institution and Principal Investigator may collect and provide to Sponsor or its designee Biological Samples (“Biological Samples”). 12.2.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Interconnection Product Options Interconnection Customer has selected the following (checked) type of Interconnection Service:

  • Program Components Activities and services delivered under this Program Element align with Foundational Programs and Foundational Capabilities, as defined in Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf) as well as with public health accountability outcome and process metrics (if applicable) as follows:

  • Use of Interconnection Facilities by Third Parties 6551 Error! Hyperlink reference not valid.9.9.1 Purpose of Interconnection Facilities. 6551

  • Test Samples The Contractor is responsible for providing Samples of sufficient size for test purposes and for coordinating such tests with the Work Progress Schedule to avoid delay.

  • Weapons (1) If the Contractor requests that its personnel performing in the USCENTCOM AOR be authorized to carry weapons for individual self-defense, the request shall be made through the Contracting Officer to the Combatant Commander, in accordance with DoD Instruction 3020.41. The Combatant Commander will determine whether to authorize in-theater contractor personnel to carry weapons and what weapons and ammunition will be allowed.

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

Time is Money Join Law Insider Premium to draft better contracts faster.