Main Pumps Sample Clauses

Main Pumps. Four main dewatering pumps shall be provided. These shall be capable of dewatering Dry Dock No. 1 in approximately 2¾ hours or Dry Dock No. 2 in approximately 3 hours with the intermediate gate in place (70m from dock head), or approximately 3½ hours for the full dry dock, from mean sea level with no ship in the dry dock in each case. The pumps shall be conventional vertical spindle mixed flow pumps installed in the pumproom. They shall be powered by electric motors supplied from the substation located on the roof of the pumphouse. The pump room is divided to isolate the main pumps into two pairs and separate them from the auxiliary pumps in case of fire or flooding.
AutoNDA by SimpleDocs

Related to Main Pumps

  • Brakes Master cylinder, wheel cylinders, hydraulic lines and fittings, power booster and brake callipers. Excludes linings, pads, drums and discs.

  • Smoke Detectors At Owner's expense, smoke detectors will be installed on the Property in working condition in accordance with the law prior to the tenant's occupancy. During the occupancy, it shall be the tenant's responsibility to maintain all smoke detectors. Owner will replace smoke detector equipment as needed.

  • Firefighters Any truck with an inoperative aerial ladder shall be regularly and routinely staffed with one (1) officer and five (5) firefighters for the period of time that the aerial ladder is inoperative, or until such time as the truck with the inoperative aerial ladder is replaced with a truck with an operative aerial ladder. At 0800 and 2000 hours, all trucks shall be staffed with one (1) officer and four (4) firefighters, and any truck with an inoperative aerial ladder shall be staffed with one (1) officer and five (5) firefighters.

  • Television Equipment Recycling If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.

  • Metalwork Section 2

  • Přetrvávající platnost Tento odstavec 1.3 “Zdravotní záznamy a Studijní data a údaje” zůstane závazný i v případě zániku platnosti či vypršení platnosti této Smlouvy.

  • Baggage For the transportation of checked baggage and cargo THE CARRIER’s liability shall be limited to ten grams of pure gold per kilo of checked baggage or cargo per person, unless a special declaration of value has been made by the sender at the time cargo is of delivered to THE CARRIER and by paying a supplementary fee, if applicable. With respect to items under the Passenger’s custody, THE CARRIER’s liability shall be limited to two hundred grams of pure gold per person for all carry-on items.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

Time is Money Join Law Insider Premium to draft better contracts faster.