MASONRY AND FINISHES Sample Clauses

MASONRY AND FINISHES o The perimeter walls will be latex paint o The following are the main finishes considered for the project. FINISH AREA ------------------------------------ ------------------------------------ FLOORS Ceramic tile Daltile Bathrooms and Cafeteria Marble Lobby Carpet: Terza model Trend Offices area FINISH AREA ------------------------------------ ------------------------------------ Concrete polish finish Warehouse Vinyl Conductive tile: Production area VPI 1/8" gauge 12" x 12" Electric Resistance (Average of 5 of more readings per NFPA 99 or ASTM f-150 between two electrodes 25,000 to 1,000,000 ohms. Floor to ground greater than 25,000 ohms. Static generation: Less than 100 volts with conductive footwear per AATCc-134 at 20% relativy humidity. Static Decay 5,000 volts to zero to less than 0.03 seconds per Federal Test Method 4046 at 15% relativy humidity Federal Specifications: Conforms to Federal Specification SS-t-312b Type III. Vinyl tile. Fire resistance: Critical Radiant Flux (ASTM E-648 or NFPA 253)>1.08W/cm2 (Class I interior floor finish. NFPA Life Safety Code 101) Flame spread (ASTM E-84 or NFPA 255)>75 Abrasion Resistance: ASTM D-1044 cd-10-f Wheel 500 Gm Weight Cycles % Gauge loss 2,500 0.4 5,000 0.8 7,500 1.2 10,000 1.6 Conforms to the requirements of NFPA 99 in effect of the time of installation UL 779 --------------------------------------------------------------------------------------- | WALL BASE | | | 4" Rubber or vinyl base Johnsonsite or similar | Offices & Cafeteria | --------------------------------------------------------------------------------------- | WALLS | | | Sherxxx Xxxxxxxx Xxxex paint | General Offices | | Epoxy paint | Interior walls of production area | | Unpainted exposed concrete | Exterior walls | --------------------------------------------------------------------------------------- | CEILINGS | | | Armsxxxxx xxxel Minaboard Fissured 755B | Offices and production area | | 21'x4' or similar. | | | Liner panel 2'x4' | kitchen area | ---------------------------------------------------------------------------------------
AutoNDA by SimpleDocs
MASONRY AND FINISHES o The perimeter walls will be latex paint. o There will be no type o insulation considered on the interior concrete block walls, The following are the main finishes considered for the project. -------------------------------- ----------------------------------------- FINISH AREA -------------------------------- ----------------------------------------- FLOORS Ceramic tile Daltile or similar. Bathrooms Cafeteria and offices. Carpet: Terza model Trend or similar Offices area -------------------------------- ----------------------------------------- Concrete polish finish Warehouse and production area ----------------------------------------------------------------------- WALL BASE

Related to MASONRY AND FINISHES

  • Changes to Specifications All Specifications and any changes thereto agreed to by the parties from time to time shall be in writing, dated and signed by the parties. Any change to the Process shall be deemed a Specification change. No change in the Specifications shall be implemented by Catalent, whether requested by Client or requested or required by any Regulatory Authority, until the parties have agreed in writing to such change, the implementation date of such change, and any increase or decrease in costs, expenses or fees associated with such change (including any change to Unit Pricing). Catalent shall respond promptly to any request made by Client for a change in the Specifications, and both parties shall use commercially reasonable, good faith efforts to agree to the terms of such change in a timely manner. As soon as possible after a request is made for any change in Specifications, Catalent shall notify Client of the costs associated with such change and shall provide such supporting documentation as Client may reasonably require. Client shall pay all costs associated with such agreed upon changes. If there is a conflict between the terms of this Agreement and the terms of the Specifications, this Agreement shall control. Catalent reserves the right to postpone effecting changes to the Specifications until such time as the parties agree to and execute the required written amendment.

  • GLASS The Tenant shall maintain the glass part of the demised premises, promptly replacing any breakage and fully saving the Landlord harmless from any loss, cost or damage resulting from such breakage or the replacement thereof.

  • Walls Sheetrock (drywall) damage should be patched and fire-taped so that there are no holes in either office or warehouse.

  • XXXXEAS Employer is engaged in the telephone and telecommunication installation and service, and manufacture sale and installation of highway signs and traffic control products.

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • XXXREAS the Trust is registered under the Investment Company Act of 1940, as amended, (the "1940 Act") as an open-end, series management investment company; and

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • Engines POSITION SERIAL NO. TOTAL HOURS TOTAL CYCLES HRS/CYCLES SINCE LAST SHOP VISIT Time Remaining to Next LIFE LIMITED PART REMOVAL PART NAME HOURS CYCLES MSN MSN

  • AIRCRAFT CONFIGURATION The guarantees defined in Paragraphs 2 and 3 below (the “Guarantees”) are applicable to the A321 Aircraft as described in the A321 Standard Specification ***** as amended by the following SCNs:

  • Spares Boeing will revise, as applicable, the customized Recommended Spares Parts List (RSPL) and Illustrated Parts Catalog (IPC).

Time is Money Join Law Insider Premium to draft better contracts faster.