Masonry Type Sample Clauses

Masonry Type. Adjustable strap-and-stirrup or T-shaped anchors to suit frame size, not less than 0.042 inch thick, with corrugated or perforated straps not less than 2 inches wide by 10 inches long; or wire anchors not less than 0.177 inch thick.
AutoNDA by SimpleDocs
Masonry Type. Provide reglets with offset top flange for embedment in masonry mortar joint.

Related to Masonry Type

  • MASONRY 4.1 Storm Shelter Area/Tornado Protection: In new building construction, provide lateral and vertical bracing in the walls around the employee toilet rooms. DIVISION 5 – METALS

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Table 3 Appendix Information

  • Contract Type OASIS SB is a family of Multiple Award, Indefinite Delivery, Indefinite Quantity (MA-IDIQ) task order contracts for Government-wide professional service based requirements which is available for use by all Federal agencies and other entities as listed in the current General Services Administration (GSA) Order, OGP 4800.2I, Eligibility to Use GSA Sources of Supply and Services. OASIS SB allows for all contract types at the task order level (e.g., Cost-Reimbursement (all types), Fixed-Price (all types), Time-and-Materials, and Labor-Hour). Task orders may also combine more than one contract type (e.g., FFP/Cost, FFP/Labor Hour etc.). Additionally, task orders may include incentives, performance based measures, multi-year or option periods, and commercial or non-commercial items.

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • Reference Description Dates E/CAM/0305 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0306 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0307 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0308 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0309 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0310 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 E/CAM/0311 Deeds 1, 6, 8, 9, 14, 16, 18, 21, 26, 28, 33-38 (incl), 40, 44, 46, 49, 50, 60, 63, 64, 67, 68-78 (even nos incl), 88-98 (even nos incl), 102, 104, and other messuages in Bayham Street; 36 and 00 Xxxxxx Xxxxx; 2, 4, and 0 Xxxxxx Xxxx Xxxxxx 1821-1942 Reference Description Dates E/CAM/0312 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0313 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0314 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0315 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0316 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0317 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0318 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0319 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0320 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0321 Deeds 86 and 00 Xxxx'x Xxxx (formerly 8 and 9 Camden Cottages) 1822-1896 E/CAM/0322 Deeds Grounds in Xxxxxxxx Xxxxxx xxx Xxxxxxx Xxxxxx; 1-21 (incl) St Paul's Terace, King's Road; six messuages in Canal Terrace, fronting Regent's Canal 1824-1832

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Traditional IRA-to-Xxxx XXX Conversions If you convert to a Xxxx XXX, the amount of the conversion from your Traditional IRA to your Xxxx XXX will be treated as a distribution for income tax purposes, and is includible in your gross income (except for any nondeductible contributions). Although the conversion amount generally is included in income, the 10 percent early distribution penalty tax will not apply to conversions from a Traditional IRA to a Xxxx XXX, regardless of whether you qualify for any exceptions to the 10 percent penalty tax. If you are required to take a required minimum distribution for the year, you must remove your required minimum distribution before converting your Traditional IRA.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

Time is Money Join Law Insider Premium to draft better contracts faster.