Material Testing. I] The material in schedule B / brought at site/ erected at position will be tested from the Government Owned Regional Testing Laboratory. If the accepted tender cost is 10% or more than 10% below the Amount put to Tender then material brought on site will be tested as per direction of Tendering Authority If the report of the material sent for testing is found unsatisfactory, same will have to be replaced by the contractor at his own cost even though already erected. The material to be replaced needs to be brought at site & will have to be get tested before erection. The testing fee/charges and all other associated charges like transportation etc. will be entirely borne by the contractor. However the sampled quantity will be considered in the measurements for first time testing only. II ] The necessary testing of the Main panels/machinery/Electrical Appliances etc. shall be done at factory in presence of engineer-in-charge before delivery of the Materials and the factory test reports shall be submitted , the necessary charges and all other associated expenses like transportation etc. will be entirely borne by the contractor. 12 The Contractor has to co ordinate with necessary follow up with the Electric power supply Company as directions of the engineer in charge 13 For commissioning of electrical installations any statutory Permissions required Shall be Born by the Contractor at his own Cost.
Appears in 6 contracts
Samples: Construction Contract, Construction Contract, Construction Contract
Material Testing. I] The material in schedule B / brought at site/ erected at position will be tested from the Government Owned Regional Testing Laboratory. If the accepted tender cost is 10% or more than thane 10% below the Amount put to Tender then material brought on site will be tested as per direction of Tendering Authority If the report of the material sent for testing is found unsatisfactory, same will have to be replaced by the contractor at his own cost even though already erected. The material to be replaced needs to be brought at site & will have to be get tested before erection. The testing fee/charges and all other associated charges like transportation etc. will be entirely borne by the contractor. However the sampled quantity will be considered in the measurements for first time testing only. II ] The necessary testing of the Main panels/machinery/Electrical Appliances etc. shall be done at factory in presence of engineer-in-charge before delivery of the Materials and the factory test reports shall be submitted , the necessary charges and all other associated expenses like transportation etc. will be entirely borne by the contractor. 12 The Contractor has to co ordinate with necessary follow up with the Electric power supply Company as directions of the engineer in charge 13 For commissioning of electrical installations any statutory Permissions required Shall be Born by the Contractor at his own Cost.
Appears in 1 contract
Samples: Construction Contract