Materials of Concern Sample Clauses

Materials of Concern. 6.1 Minimum Performance Standards from WAC 000-000-000 Materials of concern must be handled according to the standards in this section. "Materials of concern" are any of the following:
AutoNDA by SimpleDocs

Related to Materials of Concern

  • Materials Stored If the Application for Payment includes materials delivered and suitably stored at the Site but not incorporated in the work, they shall, if required by the Owner or the Design Professional, be conditional upon submission by the Contractor of bills of sale or such other procedure as will establish the Owner's title to such material or otherwise adequately protect the Owner's interest. The Contractor is responsible for the existence, protection, and, if necessary, replacement of materials until execution of the Final Certificate of the Design Professional. The Owner shall not pay for any materials stored off-site.

  • Materials and Supplies The cost of materials and supplies is allowable. Purchases should be charged at their actual prices after deducting all cash discounts, trade discounts, rebates, and allowances received. Withdrawals from general stores or stockrooms should be charged at cost under any recognized method of pricing, consistently applied. Incoming transportation charges are a proper part of materials and supply costs.

  • MATERIALS AND WORKMANSHIP Unless otherwise specified, all materials and equipment incorporated in the work under the Contract shall be new. All workmanship shall be first class and by persons qualified in the respective trades.

  • Materials and Equipment ‌ Material means property that may be consumed or expended during performance, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end item. Equipment means a tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for performance. Materials and Equipment shall be priced in accordance with the terms of the task order award, contract type, and applicable FAR and agency-specific regulatory supplements. Unless otherwise directed by task order terms and conditions, the Contractor may apply indirect costs to materials and equipment consistent with the Contractor’s usual accounting practices.

  • CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK 8.1 The Contractor shall be responsible for ensuring that no asbestos containing materials or work is included within the scope of the Work. The Contractor shall take whatever measures it deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement.

  • DEVELOPMENTAL REQUIREMENTS The Personal Development Plan (PDP) for addressing developmental gaps is attached as Annexure B.

  • Materials and Methods 86 2.1 PARTICIPANTS 87 We used baseline measurements from a convenience sample of participants in previous (3) and 88 ongoing cohort studies investigating the effects of rehabilitation on balance responses (Table 1). PD 89 participants were mild-moderate with bilateral symptoms (Xxxxx and Xxxx stage 2-3 (13)). All 90 participants provided written informed consent and all study procedures were approved by Institutional 91 Review Boards at the Georgia Institute of Technology and Emory University.

  • Environmentally Preferable Procurement Policy The Environmentally Preferable Procurement Policy, along with a brief policy description, is located on the City’s website at the following link: xxxx://xxx.xxxxxxxxx.xxx/esd/natural-energy-resources/epp.htm. Environmental procurement policies and activities related to the completion of any Work will include, whenever practicable, but are not limited to:  The use of recycled and/or recyclable products in daily operations (i.e. 30%, 50%, 100% PCW paper, chlorine process free, triclosan free hand cleaner, etc.);  The use of energy-star compliant equipment;  The use of alternative fuel and hybrid vehicles, and implementation of protocols aimed at increasing the efficiency of vehicle operation;  The implementation of internal waste reduction and reuse protocol(s); and  Water and resource conservation activities within facilities, including bans on individual serving bottled water and the use of compostable food service products.

  • Area of Concern Cracks in walkways and/or patios within property boundaries and/or driveway. Standard: Cracks that do not exceed an average of ½ inch in width and vertical displacement that does not exceed an average of ½ inch are to be expected. Developer or Initial Purchaser must immediately seal all cracks appearing with a waterproof substance.

  • ENVIRONMENTAL CONCERNS In the worse case scenario, many environmental concerns must be addressed. Along with the police and fire marshal, the state environmental protection department will be on site to monitor the situation. Items to be concerned with in a large central office building could include:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!