Meaning of abbreviations for the column headings Sample Clauses

Meaning of abbreviations for the column headings. ‌ Axis 1 Marking of 1 axis in location plan (max. 5 places) Axis 2 Marking of 2 axis in location plan (max. 5 places) Axis 3 Marking of 3 axis in location plan (max. 5 places) Axis 4 Marking of 4 axis in location plan (max. 5 places) Botton Con Lower connection part, if the support is designed without a clamp. (0,60, 61, 74, 63, 73, 75) CalcNo Number of the Calculation point (max. 32 digits) Config. No. Number of support configuration (see manual, 7.2) Start with "S" for static supports, e.g. S13 Start with "Y" for dynamic supports, e.g. Y01 Start with "C" for so-called cold supports (C01 = U-bolt) Cust DWG No Customer drawing number (up to 25 digits) Cust. DWG No. Customer drawing number (max. 25 places) DIM 1 Difference installation height (one or more differences are needed DIM 2 according to the configuration) DIM 3 DIM 4 Dist A Location plan: Distance between 1. axis and centre of pipe Dist B Location plan: Distance between 2. axis and centre of pipe Dist C Location plan: Distance between 3. axis and centre of pipe Dist D Location plan: Distance between 4. axis and centre of pipe Drawing N° LICAD drawing number (e.g. for taking over data from another LICAD version) Elev 1/L 1st height notation, or lefthand notation in double structural attachment. Elev 2/R 2nd height notation, or righthand notation in double structural attachment Elev 3 Elev 4 Elev 5 Xxxxxx xxxx Xxxxxx xxxx number (max. 32 digits) Hng_Type Specification of the type of hanger (Input of a six-digit hanger type number, but limited to Type 11, 21 or 39. Other types are determined by the hanger configuration.) Hydro load Test load e.g. for hydro static test Insul Pipe insulation thickness Load Cold or hot load (depends to specification settings) Move X Pipe movement into pipe direction Move Y Pipe movement laterally to pipe direction Move Z Pipe movement in vertical direction Pipe Pipe diameter Qty Qty. of supports Rot_X_Vect Rotation round high axis for PDS transfer Rot_Y_Vect Rotation round high axis for PDS transfer Rot_Z_Turn Rotation round high axis for PDS transfer Temp Temperature Temp2-Temp9 Additional Temperature values used in XXXXXX XX only Top Con Structural attachment type (73, 74, 75, 76, 78 if option ‘Selection with connection parts to building structure’ is set, otherwise 60, 61, 63) V_Cl_Type Vertical pipe clamps (Type 46, 48) . Type 46 encase type 45 too. Width Pin to pin dimension of Trapezes or riser clamps X_Coor Reference point pipe connection for PDS transfer Y_Coor ...
AutoNDA by SimpleDocs
Meaning of abbreviations for the column headings. Axis 1 Marking of 1 axis in location plan (max. 5 places) Axis 2 Marking of 2 axis in location plan (max. 5 places) Axis 3 Marking of 3 axis in location plan (max. 5 places) Axis 4 Marking of 4 axis in location plan (max. 5 places) Botton Con Lower connection part, if the support is designed without a clamp. (0,60, 61, 74, 63, 73, 75) CalcNo Number of the Calculation point (max. 32 digits)

Related to Meaning of abbreviations for the column headings

  • Table of Contents and Section Headings The table of contents and the Section and subsection headings herein are intended for convenience only and shall be ignored in construing this Agreement.

  • Section Headings and References The section headings are for the convenience of the parties and in no way alter, modify, amend, limit or restrict the contractual obligations of the parties. Any reference in this agreement to a particular section or subsection shall refer to a section or subsection of this Agreement, unless specified otherwise.

  • Section Headings and Gender The Section headings used herein are inserted for reference purposes only and shall not in any way affect the meaning or interpretation of this Agreement. All personal pronouns used in this Agreement shall include the other genders, whether used in the masculine, feminine or neuter gender, and the singular shall include the plural, and vice versa, whenever and as often as may be appropriate.

  • Article Headings The Article headings and numbers contained in this Agreement have been inserted only as a matter of convenience and for reference, and in no way shall be construed to define, limit or describe the scope or intent of any provision of this Agreement.

  • Table of Contents; Headings The table of contents, cross-reference sheet and headings of the Articles and Sections of this Indenture have been inserted for convenience of reference only, are not intended to be considered a part hereof and shall not modify or restrict any of the terms or provisions hereof.

  • Article and Section Headings The article and section headings herein are for convenience of reference only, and shall not limit or otherwise affect the meaning hereof.

  • Table of Contents, Headings, etc The table of contents and the titles and headings of the articles and sections of this Indenture have been inserted for convenience of reference only, are not to be considered a part hereof, and shall in no way modify or restrict any of the terms or provisions hereof.

  • Captions and Paragraph Headings Captions and paragraph headings used herein are for convenience only and are not a part of this Agreement and shall not be used in construing it.

  • Table of Contents, Headings and Captions The table of contents, headings, subheadings and captions contained in this Agreement are included for convenience of reference only, and in no way define, limit or describe the scope of this Agreement or the intent of any provision hereof.

  • Effect of Headings and Table of Contents The Article and Section headings herein and the Table of Contents are for convenience only and shall not affect the construction hereof.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!