Measures to Mitigate Groundwater Movement in Utility Backfill Sample Clauses

Measures to Mitigate Groundwater Movement in Utility Backfill. For utilities subject to the mitigation requirement, as described in Section 5.2.1, mitigation measures shall include: • the use of low permeability backfill; and/or • cutoff features. Low permeability backfill may include a low strength grout mix known as controlled density fill (“CDF”), or “flowable fill”. This material is poured like grout, has low strength and therefore can be excavated by hand, and flows into gaps and around utilities. It can provide a low permeability restriction to water flow when used as utility backfill. Other low permeability fill materials may also be used if approved by NASA. If a granular backfill material is used in a trench, a cutoff feature will be installed a minimum of every 300 feet, and within 50 feet of branches in the distribution system. The cutoff feature will be a wall of low permeability material, such as bentonite, concrete, or CDF. The cutoff feature will be at least 2 feet thick and will span the width of the trench from the base of the trench to an elevation at least 3 feet above the highest expected groundwater level at the location. The sides of the cutoff feature shall be keyed into native soil. Some utilities subject to the mitigation requirement of this section may be installed in horizontal boreholes with no backfill. If it is determined that the native soil will collapse around the utility, no further mitigation is required. If, however, the borehole may remain open or a granular backfill is installed around the utility line, cutoff features will be installed as described above for trenches. This may require potholing to the borehole to install the cutoff feature, or installing plugs of low permeability material around the utility when it is installed.
AutoNDA by SimpleDocs

Related to Measures to Mitigate Groundwater Movement in Utility Backfill

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Underground Storage Tanks Borrower shall not install or permit to be installed on the Property any underground storage tank.

  • Remedial Actions Relating to Hazardous Materials Activities Borrower shall, in compliance with all applicable Environmental Laws, promptly undertake, and shall cause each of its Subsidiaries promptly to undertake, any and all investigations, studies, sampling, testing, abatement, cleanup, removal, remediation or other response actions necessary to remove, remediate, clean up or xxxxx any Hazardous Materials Activity on, under or about any Facility that is in violation of any Environmental Laws or that presents a material risk of giving rise to an Environmental Claim. If Borrower or any of its Subsidiaries undertakes any such action with respect to any Hazardous Materials, Borrower or such Subsidiary shall conduct and complete such action in compliance with all applicable Environmental Laws and in accordance with the policies, orders and directives of all federal, state and local Government Authorities except when, and only to the extent that, Borrower’s or such Subsidiary’s liability with respect to such Hazardous Materials Activity is being diligently contested in good faith and by appropriate proceedings by Borrower or such Subsidiary.

  • Environmental and Safety Matters Except as disclosed in Schedule 4.13:

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Environmental, Health and Safety Matters (a) The Company has complied and is in compliance with all Environmental, Health, and Safety Requirements.

  • Contamination Lessee shall not cause, suffer or permit any Contamination;

  • HAZARDOUS SUBSTANCE CONDITIONS If a Hazardous Substance Condition occurs, unless Lessee is legally responsible therefor (in which case Lessee shall make the investigation and remediation thereof required by Applicable Requirements and this Lease shall continue in full force and effect, but subject to Lessor's rights under Paragraph 6.2(c) and Paragraph 13), Lessor may at Lessor's option either (i) investigate and remediate such Hazardous Substance Condition, if required, as soon as reasonably possible at Lessor's expense, in which event this Lease shall continue in full force and effect, or (ii) if the estimated cost to investigate and remediate such condition exceeds twelve (12) times the then monthly Base Rent or $100,000 whichever is greater, give written notice to Lessee within thirty (30) days after receipt by Lessor of knowledge of the occurrence of such Hazardous Substance Condition of Lessor's desire to terminate this Lease as of the date sixty (60) days following the date of such notice. In the event Lessor elects to give such notice of Lessor's intention to terminate this Lease, Lessee shall have the right within ten (10) days after the receipt of such notice to give written notice to Lessor of Lessee's commitment to pay for the excess costs of (a) investigation and remediation of such Hazardous Substance Condition to the extent required by Applicable Requirements, over (b) an amount equal to twelve (12) times the then monthly Base Rent or $100,000, whichever is greater. Lessee shall provide Lessor with the funds required of Lessee or satisfactory assurance thereof within thirty (30) days following said commitment by Lessee. In such event this Lease shall continue in full force and effect, and Lessor shall proceed to make such investigation and remediation as soon as reasonably possible after the required funds are available. If Lessee does not give such notice and provide the required funds or assurance thereof within the time period specified above, this Lease shall terminate as of the date specified in Lessor's notice of termination.

Time is Money Join Law Insider Premium to draft better contracts faster.