Medical/Dental Coverage – Work Assignment Increases or Decreases Sample Clauses

Medical/Dental Coverage – Work Assignment Increases or Decreases. The District will allow regular employees who have never been enrolled previously, to enroll in the existing medical and/or dental insurance programs when the employee becomes eligible for an increased District contribution for medical or dental insurance due to a permanent increase in hours of employment. The District will notify the employee in writing of the provision of this section. The employee must then request enrollment in writing and within sixty (60) days of the effective date of the increased assignment. Coverage for this benefit would be effective the first day of the second month following written submission of enrollment application(s) to the Employee Benefits Department. Conversely, the District will allow a regular employee who is enrolled, to dis-enroll in existing medical and/or dental insurance programs and other optional benefits when the employee realizes a reduction in District contribution due to a permanent decrease in hours of employment.
AutoNDA by SimpleDocs

Related to Medical/Dental Coverage – Work Assignment Increases or Decreases

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • Work from Home The following applies when a Producer requires an employee to work remotely from home:

  • Extended Local Calling Scope Arrangement An arrangement that provides a Customer a local calling scope (Extended Area Service, “EAS”), outside of the Customer’s basic exchange serving area.

  • Additional Coverage To the extent that insurance coverage provided by Consultant maintains higher limits than the minimums appearing in Exhibit B, City requires and shall be entitled to coverage for higher limits maintained.

  • Salary Schedule Advancement The base salaries in each cluster within a step may be increased through COLA, turnover savings, increments, and additional educational attainment. Once placed in a cluster within a step, faculty do not move from cluster to cluster except as described in B.3.B below.

  • Schedule of Specific Commitments 1. Each Party shall set out in a schedule the specific commitments it undertakes under Article 106 (National Treatment), Article 000 (Xxxxxx Xxxxxx) and Article 108 (Additional Commitments). With respect to sectors where such commitments are undertaken, each Schedule shall specify: (a) terms, limitations and conditions on market access; (b) conditions and qualifications on national treatment; (c) undertakings relating to additional commitments referred to in Article 108 (Additional Commitments); and (d) where appropriate, the time-frame for implementation of such commitments and the date of entry into force of such commitments. 2. Measures inconsistent with both Articles 106 (National Treatment) and 000 (Xxxxxx Xxxxxx) are inscribed in the column relating to Article 107 (Market Access). In this case, the inscription is considered to provide a condition or qualification to Article 106 (National Treatment) as well. 3. The Parties' Schedules of Specific Commitments are set out in Annex 6 (Schedules of Specific Commitments).

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.

  • Teaching Staff Assigned to More Than One Building Each Educator who is assigned to more than one building will be evaluated by the appropriate administrator where the individual is assigned most of the time. The principal of each building in which the Educator serves must review and sign the evaluation, and may add written comments. In cases where there is no predominate assignment, the superintendent will determine who the primary evaluator will be.