Metallic Yield Sample Clauses

Metallic Yield. In the particular case of metallic yield characterization, there are many other variables involved: Fe losses with exhaust dust and slag, other elements oxidation like C and Cr, liquid steel leaving through the slag door, etc. Additionally, the amount of liquid steel generated per heat is not a straightforward mass balance, since there is a certain amount of liquid steel remaining inside the furnace. Therefore, mass balances are just reliable enough when involving the whole production cycle (approximately a week), which reduces highly the amount of available data. The result is a not so good regression. However, it is clear that some grades are cleaner (both regarding residual elements and steriles) than others.
AutoNDA by SimpleDocs
Metallic Yield. As expected, the results for metallic yield show a high value with low spread for the hot metal (No. 01). Of the scrap types, only Nos. 5, 6 and 12 show similarly high values, while for most scrap types the metallic yield lies between 70 % and 90 %. The broad distribution for scrap types 3, 14 and 16, which cover the full range, is likely to be the effect of a lack of statistical robustness because of the low mass fraction in the heats of less than 1% on average of the scrap types in question. ___________________
Metallic Yield. Refial has also analysed the metallic yield of the nine types of scrap selected, and the results based on historical data can be observed in Figure 53.

Related to Metallic Yield

  • Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4. 5.7.2 BellSouth shall make available the following channelization systems and interfaces: 5.7.2.1 DS1 Channelization System: channelizes a DS1 signal into a maximum of twenty- four (24)

  • Fixed Kilowatt Rate Product If Clearview Energy would like to propose a change to a fixed kilowatt rate product, you will be notified by the process described in Change of Terms. Fixed price products may change due to new or modified federal, state or local laws; or regulatory actions that impose new or modified fees. 2b. Month-to-month Variable Kilowatt Rate Product – Month-to-month variable kilowatt rate products are subject to change without notice at Clearview Energy’s discretion outside of any applicable promotion. If applicable, the Monthly Base Charge may also fluctuate outside of any applicable promotion. All pricing can be viewed at xxx.XxxxxxxxxXxxxxx.xxx.

  • Grade The employee's grade level. (1-15)

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Points The points to be assigned to the classification levels under this Agreement shall be: C14 - C13 - C12 32 C11 64 C10 96 C9 12 additional points above C10 C8 24 additional points above C10 C7 36 additional points above C10 C6 48 additional points above C10 C5 60 additional points above C10 C4 Standards and points to be finalised C3 Standards and points to be finalised C2a Standards and points to be finalised C2b Standards and points to be finalised C1a Standards and points to be finalised C1b Standards and points to be finalised and in accordance with Table 2 in the National Metal and Engineering Competency Standards Implementation Guide.

  • Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.

  • COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.

  • Linear Interpolation Where Linear Interpolation is specified as applicable in respect of an Interest Period in the applicable Final Terms, the Rate of Interest for such Interest Period shall be calculated by the Agent by straight line linear interpolation by reference to two rates based on the relevant Reference Rate (where Screen Rate Determination is specified as applicable in the applicable Final Terms) or the relevant Floating Rate Option (where ISDA Determination is specified as applicable in the applicable Final Terms), one of which shall be determined as if the Designated Maturity were the period of time for which rates are available next shorter than the length of the relevant Interest Period and the other of which shall be determined as if the Designated Maturity were the period of time for which rates are available next longer than the length of the relevant Interest Period provided however that if there is no rate available for a period of time next shorter or, as the case may be, next longer, then the Agent shall determine such rate at such time and by reference to such sources as it determines appropriate.

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

  • Measuring DNS parameters Every minute, every DNS probe will make an UDP or TCP “DNS test” to each of the public-­‐DNS registered “IP addresses” of the name servers of the domain name being monitored. If a “DNS test” result is undefined/unanswered, the tested IP will be considered unavailable from that probe until it is time to make a new test.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!