Meter Test. 9.1. All meters supplied against the requirements of this specification will be tested before transfer to storage on IDECO Meter Test Bench, and should any meter found to be outside the specified accuracy tolerance, it will be rejected and the contractor shall supply the relevant number of replacement meters at no cost to the purchaser. 9.2. The meter shall be protected against high voltage DC discharge up to 100KV and this should be approved by shock a samples of the meter up to 20 times in two minutes by using 100kv DC Taser and the factory should provide IDECO engineer with this Taser. 9.3. The meters shall be factory-calibrated and tested under conditions according to IEC62052- 11 so that when they are tested under the reference conditions stipulated in IEC 62053-11 first Edition 2003, the percentage errors shall be far within the limits as specified in IEC62053-11. Should the meters be re-tested for at a later date, the difference in accuracy readings between the first and second tests shall not exceed 1%. Furthermore, the meters shall be capable of being transported by road to the purchaser's Test Station in Irbid without losing their calibration.
Appears in 3 contracts
Samples: Call Off Contract, Call Off Contract, Call Off Contract
Meter Test. 9.1. All meters supplied against the requirements of this specification will be tested before transfer to storage on IDECO Meter Test Bench, and should any meter found to be outside the specified accuracy tolerance, it will be rejected and the contractor shall supply the relevant number of replacement meters at no cost to the purchaser.
9.2. The meter shall be protected against high voltage DC discharge up to 100KV and this should be approved by shock a samples of the meter up to 20 times in two minutes by using 100kv DC Taser and the factory should provide IDECO engineer with this Taser.
9.3. The meters shall be factory-calibrated and tested under conditions according to IEC62052- 11 so that when they are tested under the reference conditions stipulated in IEC 62053-11 first Edition 2003, the percentage errors shall be far within the limits as specified in IEC62053-11. Should the meters be re-tested for at a later date, the difference in accuracy readings between the first and second tests shall not exceed 1%. Furthermore, the meters shall be capable of being transported by road to the purchaser's Test Station in Irbid without losing their calibration.
9.4. For Certification by Local Authorities, meters shall be tested against a minimum/maximum error limit of the percentage of the test points (loads) specified in IEC 26053 -11 First Edition 2003. The difference between the original test value and the certification value shall not exceed +/-1%.
Appears in 1 contract
Samples: Call Off Contract