Common use of Metering and Telemetry Clause in Contracts

Metering and Telemetry. a) Except as may be otherwise specifically provided for herein, electrical meters and associated equipment of the type approved by MSEDCL, which meters and equipment shall be installed on Generator’s premises at their cost and thereon owned, installed, operated and maintained by MSEDCL. Generator shall, at its own expense, furnish, install and maintain mounting facilities for such meters and associated devices located in the Dedicated Facilities. The Generator shall construct air-conditioned metering cabin of size 3.5 x 3.5 meter for housing energy and tariff metering. Special Energy Meters (ABT) with online reading features having continuous communication facility with SLDC shall be installed at the metering point. The utility / licensee, if opted for by the co-gen project entity, shall provide check meter, with identical specifications to that of main billing meter having independent CTs &PTs, at the cost of the project holder, to assess the energy generated and fed into the grid during such period when the main meter or its related accessories such as CT/PT fail or develop problems, so as to avoid disputes in future. Generator’s and MSEDCL’s electric metering equipment shall be sealed and the seals shall be broken only upon occasions when the meters are to be inspected, tested or calibrated before the representatives of Generator and MSEDCL , who shall be present upon such occasions. Normal inspection, testing and calibration shall be performed once a year, or at Generator’s expense, at more frequent intervals. b) If any of the electric metering equipment tests provided by normal inspection and testing disclose that the error for such equipment exceeds two tenths of a one percent (0.2%), plus or minus of one hundred percent (100%), then one half (1/2) of the readings of such metering equipment taken during the billing periods since the last test on such equipment was made will be adjusted, either upward or downward, to correct for such error, unless there is verifiable information available from readings from Generator installed meters. Any correction in billing resulting from such correction in meter records shall be made in the next monthly payment made by MSEDCL after inaccuracy is verified and such correction shall be made, in the absence of bad faith, manifest error, fraud, or intentional wrongdoing, will constitute a complete and final settlement of any claim arising between the Parties hereto out of such inaccuracy of the metering equipment. c) Should any metering equipment installed by MSEDCL fail to register to the electricity delivered during any period of time, or if Generator and MSEDCL agree that the meter registration is invalid, the amount of electricity delivered during such period will be based on meter readings available from Generator installed meter equipment.

Appears in 4 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

AutoNDA by SimpleDocs

Metering and Telemetry. a) Except as may be otherwise specifically provided for herein, electrical meters and associated equipment of the type approved by MSEDCL, which meters and equipment shall be installed on Generator’s premises at their cost and thereon owned, installed, operated and maintained by MSEDCL. Generator shall, at its own expense, furnish, install and maintain mounting facilities for such meters and associated devices located in the Dedicated Facilities. The Generator shall construct air-conditioned metering cabin of size 3.5 x 3.5 meter for housing energy and tariff metering. Special Energy Meters (ABT) with online reading features having continuous communication facility with SLDC shall be installed at the metering point. The utility / licensee, if opted for by the co-gen project entity, shall provide check meter, with identical specifications to that of main billing meter having independent CTs &PTs, at the cost of the project holder, to assess the energy generated and fed into the grid during such period when the main meter or its related accessories such as CT/PT fail or develop problems, so as to avoid disputes in future. Generator’s and MSEDCL’s electric metering equipment shall be sealed and the seals shall be broken only upon occasions when the meters are to be inspected, tested or calibrated before the representatives of Generator and MSEDCL , who shall be present upon such occasions. Normal inspection, testing and calibration shall be performed once a year, or at Generator’s expense, at more frequent intervals. b) If any of the electric metering equipment tests provided by normal inspection and testing disclose that the error for such equipment exceeds two tenths of a one percent (0.2%), plus or minus of one hundred percent (100%), then one half (1/2) of the readings of such metering equipment taken during the billing periods since the last test on such equipment was made will be adjusted, either upward or downward, to correct for such error, unless there is verifiable information available from readings from Generator installed meters. Any correction in billing resulting from such correction in meter records shall be made in the next monthly payment made by MSEDCL after inaccuracy is verified and such correction shall be made, in the absence of bad faith, manifest error, fraud, or intentional wrongdoing, will constitute a complete and final settlement of any claim arising between the Parties hereto out of such inaccuracy of the metering equipment. c) Should any metering equipment installed by MSEDCL fail to register to the electricity delivered during any period of time, or if Generator and MSEDCL agree that the meter registration is invalid, the amount of electricity delivered during such period will be based on meter readings available from availablefrom Generator installed meter equipment.

Appears in 3 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

Metering and Telemetry. a) Except as may be otherwise specifically provided for herein, electrical meters and associated equipment of the type approved by MSEDCL, which meters and equipment shall be installed on Generator’s premises at their cost and thereon owned, installed, operated and maintained by MSEDCL. Generator shall, at its own expense, furnish, install and maintain mounting facilities for such meters and associated devices located in the Dedicated Facilities. The Generator shall construct air-conditioned metering cabin of size 3.5 x 3.5 meter for housing energy and tariff metering. Special Energy Meters (ABT) with online reading features having continuous communication facility with SLDC SLDC/ MSEDCL shall be installed at the metering point. The utility / licensee, if opted for by the co-gen project entity, shall provide check meter, with identical specifications to that of main billing meter having independent CTs &PTs, at the cost of the project holder, to assess the energy generated and fed into the grid during such period when the main meter or its related accessories such as CT/PT fail or develop problems, so as to avoid disputes in future. Generator’s and MSEDCL’s electric metering equipment shall be sealed and the seals shall be broken only upon occasions when the meters are to be inspected, tested or calibrated before the representatives of Generator and MSEDCL , who shall be present upon such occasions. Normal inspection, testing and calibration shall be performed once a year, or at Generator’s expense, at more frequent intervals. b) If any of the electric metering equipment tests provided by normal inspection and testing disclose that the error for such equipment exceeds two tenths of a one percent (0.2%), plus or minus of one hundred percent (100%), then one half (1/2) of the readings of such metering equipment taken during the billing periods since the last test on such equipment was made will be adjusted, either upward or downward, to correct for such error, unless there is verifiable information available from readings from Generator installed meters. Any correction in billing resulting from such correction in meter records shall be made in the next monthly payment made by MSEDCL after inaccuracy is verified and such correction shall be made, in the absence of bad faith, manifest error, fraud, or intentional wrongdoing, will constitute a complete and final settlement of any claim arising between the Parties hereto out of such inaccuracy of the metering equipment. c) Should any metering equipment installed by MSEDCL fail to register to the electricity delivered during any period of time, or if Generator and MSEDCL agree that the meter registration is invalid, the amount of electricity delivered during such period will be based on meter readings available from Generator installed meter equipment.

Appears in 2 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement

AutoNDA by SimpleDocs

Metering and Telemetry. a) a. Except as may be otherwise specifically provided for herein, electrical meters and associated equipment of the type approved by MSEDCL, which meters and equipment shall be installed on Generator’s premises at their cost and thereon owned, installed, operated and maintained by MSEDCL. Generator shall, at its own expense, furnish, install and maintain mounting facilities for such meters and associated devices located in the Dedicated Facilities. The Generator shall construct air-conditioned metering cabin of size 3.5 x 3.5 meter for housing energy and tariff metering. . b. Special Energy Meters (ABT) with online reading features having continuous communication facility with SLDC shall be installed at the metering point. The utility / licensee, if opted for by the co-gen biomass project entity, shall provide check meter, with identical specifications to that of main billing meter having independent CTs &PTs, at the cost of the project holder, to assess the energy generated and fed into the grid during such period when the main meter or its related accessories such as CT/PT fail or develop problems, so as to avoid disputes in future. . c. Generator’s and MSEDCL’s electric metering equipment shall be sealed and the seals shall be broken only upon occasions when the meters are to be inspected, tested or calibrated before the representatives of Generator and MSEDCL , who shall be present upon such occasions. Normal inspection, testing and calibration shall be performed once a year, or at Generator’s expense, at more frequent intervals. b) d. If any of the electric metering equipment tests provided by normal inspection and testing disclose that the error for such equipment exceeds two tenths of a one percent (0.2%), plus or minus of one hundred percent (100%), then one half (1/2) of the readings of such metering equipment taken during the billing periods since the last test on such equipment was made will be adjusted, either upward or downward, to correct for such error, unless there is verifiable information available from readings from Generator installed meters. . e. Any correction in billing resulting from such correction in meter records shall be made in the next monthly payment made by MSEDCL after inaccuracy is verified and such correction shall be made, in the absence of bad faith, manifest error, fraud, or intentional wrongdoing, will constitute a complete and final settlement of any claim arising between the Parties hereto out of such inaccuracy of the metering equipment. c) f. Should any metering equipment installed by MSEDCL fail to register to the electricity delivered during any period of time, or if Generator and MSEDCL agree that the meter registration is invalid, the amount of electricity delivered during such period will be based on meter readings available from Generator installed meter equipment.

Appears in 1 contract

Samples: Power Purchase Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!