Method of Repair. Small size holes having surface dimensions about equal to the depth of the hole, holes left after removal of form bolts, grout insert holes and slots cut for repair of cracks shall be repaired as follows. The hole to be patched shall be roughened and thoroughly soaked with clean water until absorption stops. A 5 mm thick layer of grout of equal parts of cement and sand shall be well brushed into the surface to be patched, followed immediately by the patching concrete which shall be well consolidated with a wooden float and left slightly proud of the surrounding surface. The concrete patch shall be built up in 10 mm thick layers. After an hour or more, depending upon weather conditions, it shall be worked off flush with a wooden float and a smooth finish obtained by wiping with hessian. A steel trowel shall be used for this purpose. The mix for patching shall be of the same materials and in the same proportion as that used in the concrete being repaired, although some reduction in the maximum size of the coarse aggregates may be necessary and the mix shall be kept as dry as possible. Mortar filling by air pressure (guniting) shall be used for repair of areas too large and / or too shallow for patching with mortar. Patched surfaces shall be given a final treatment to match the colour and texture of the surrounding concrete. White cement shall be substituted for ordinary cement, if so directed by the Engineer, to match the shade of the patch with the original concrete.
AutoNDA by SimpleDocs
Method of Repair. Small size holes having surface dimensions about equal to the depth of the hole, holes left after removal of bolts, grout insert holes and slots cut for repair of cracks shall be repaired as follows. The holes to be patched shall be roughened and thoroughly soaked with clean water until absorption stops. Before surface treatment, grouting may have to be done by equal strength shrinkable grout. Unless otherwise specified, 5 mm. thick layer of grout of equal parts of cement and sand shall be well brushed into the surface to be patched, followed immediately by the patching concrete which shall be well consolidated with a wooden float and left slightly prod of the surrounding surface. The concrete patch shall be built up in 10 mm. thick layers. After an hour or more, depending upon weather conditions, it shall be worked off flush with a wooden flat and a smooth finish obtained by wiping with hessian, a steel trowel shall be used for this purpose. The mix for patching shall be of the same materials and in the same proportions as that used in the concrete being repaired, although some reduction in the maximum size of the coarse aggregates may be necessary and the mix shall be kept as dry as possible. Mortar filling by air pressure (guniting) shall be used for repair of areas too large and / or too shallow for patching with mortar. Patched surfaces shall be given a final treatment to match the colour and texture of the surrounding concrete. White cement shall be substituted for ordinary cement, if so directed by Engineer-In-Charge, to match the shade of the patch with the original concrete. Curing of patched work The patched area shall be covered immediately with an approved water retaining, water saturated material such as gunny bags which shall be kept continuously wet and protected against sun and wind for a period of 24 hours. Thereafter, the patched area shall be kept wet continuously by a fine spray or sprinkling for not less than 10 days. Approval by Engineer-In-Charge All materials, procedures and operations used in the repair of concrete and also the finished repair work shall be subject to the approval of Engineer-In-Charge. All fillings shall be tightly bonded to the concrete and shall be sound, free from cracks after the fillings have been cured and dried.

Related to Method of Repair

  • Cost of Repairs 54.1 Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the end of the Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the loss or damage arises from the Contractor's acts or omissions.

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • AIN Selective Carrier Routing for Operator Services, Directory Assistance and Repair Centers 4.3.1 BellSouth will provide AIN Selective Carrier Routing at the request of <<customer_name>>. AIN Selective Carrier Routing will provide <<customer_name>> with the capability of routing operator calls, 0+ and 0- and 0+ NPA (LNPA) 555-1212 directory assistance, 1+411 directory assistance and 611 repair center calls to pre-selected destinations.

  • Housekeeping Service and Cleanliness Housekeeping Service will be provided to clean only the kitchenette and washroom areas of the Room on a regularly scheduled basis as posted by the Manager. This Housekeeping Service is not optional. Residents must ensure that all counters and sinks are clear of any dishes, appliances, or any other personal items. As part of the Housekeeping Service, the Room will be inspected. Should the Room be found in an unhygienic state, the Resident(s) will be given 24 hours to return it to a proper state, or it will be cleaned at the discretion of the Manager with a minimum charge of $25.00. The Resident shall, at all times during the Term, keep all parts of the Room clean, including and not limited to; floor coverings, doors, walls, ceilings, kitchenette appliances, counters, cupboards, faucets, sinks, furniture, glass, window frames, and other furnishings. Vacuums, brooms, and mops may be signed out at the front desk, subject to availability.

  • Service Location and Equipment The AGENCY must request in writing and said request must be approved in writing by the COUNTY’S Manager of the CCC or designee, prior to any change in the dates, times, and locations of services provided in this Contract.

  • Access to the Work The Design Professional and its representatives shall have access to the Work at all times while it is in progress, and shall comply with all job site safety rules.

  • SPECIAL TOOLS & TEST EQUIPMENT If the price stated on the Offer includes the cost of any special tooling or special test equipment fabricated or required by the Contractor for the purpose of filling this order, such special tooling equipment and any process sheets related thereto shall become the property of the City and shall be identified by the Contractor as such.

  • MAINTENANCE AND REPAIR; RULES Tenant will, at its sole expense, keep and maintain the Premises and appurtenances in good and sanitary condition and repair during the term of this Agreement and any renewal thereof. Without limiting the generality of the foregoing, Tenant shall:

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • CARE OF BUILDING AND EQUIPMENT Exhibitors or their agents shall not injure or deface any part of the exhibit building, the booths, or booth contents or show equipment and décor. When such damage appears, the exhibitor is liable to the owner of the property so damaged. 14.