Method of stowing/back filling Sample Clauses

Method of stowing/back filling. The final stope excavation is planned to be filled using a hydraulically placed sand and cement mixture according to a sequence that ensures mining proceeds on a continuous basis commencing from the base of a mining block. The base of every main block will be filled with GEMTECH CONSULTANTS Pvt. Ltd. Page / 86 Xxxx Xxxxxxx X.X.Xxxxxxx X.X.Xxxxx A/10, Baramunda HB Colony, BBSR-3 RQP/BBS/023/2000/A RQP/NGP/027/87/A RQP/CAL/175/93/A reinforced high strength fill material. This high strength fill would enable mining lower block up to the base of the upper block. The filled Sub block 1 will work as the working platform for mining of sub block 2, and the stope will progress upward. Details of the backfilling will be presented in a separate, specific backfill section.
AutoNDA by SimpleDocs

Related to Method of stowing/back filling

  • Method of Billing Consultant may submit invoices to the City for approval on a progress basis, but no more often than two times a month. Said invoice shall be based on the total of all Consultant’s services which have been completed to City’s sole satisfaction. City shall pay Consultant’s invoice within forty-five (45) days from the date City receives said invoice. Each invoice shall describe in detail, the services performed, the date of performance, and the associated time for completion. Any additional services approved and performed pursuant to this Agreement shall be designated as “Additional Services” and shall identify the number of the authorized change order, where applicable, on all invoices.

  • Method of Selection Bidder will be selected under Cost Based Selection-L1 (CBS) and procedures described in this Tender Document.

  • METHOD OF ORDERING The County shall issue Delivery Orders against the contract on an as needed basis for the goods or services listed on the Bid Response Form.

  • Method of Service A Notice may be given by:

  • Method of testing The emission of ESA representative of its type shall be tested by the method(s) according to ISO 7637-2 as described in Annex 10 for the levels given in Table 1. Table 1 Maximum allowed pulse amplitude Maximum allowed pulse amplitude for Polarity of pulse amplitude Vehicles with 12 V systems Vehicles with 24 V systems Positive +75 V +150 V Negative –100 V –450 V 6.8. Specifications concerning immunity of ESAs to electromagnetic radiation

  • Method of Measurement The harmonics emission on AC power lines generated by the vehicle representative of its type shall be measured using the method described in Annex 11. The method of measurement shall be defined by the vehicle manufacturer in accordance with the Technical Service.

  • Method of Application Applicants for the SORACOM Air Global Service (each such applicant, an “Applicant”) shall apply for the SORACOM Air Global Service via the on-line sign-up in accordance with the procedure specified by SORACOM after the Applicant agrees to the General Terms (such application, the “Application”).

  • Method of Accounting The Company will use the method of accounting previously determined by the Members for financial reporting and tax purposes.

  • Method of Payback The employee must choose one (1) of the following options for paying back the overpayment:

  • Method of Operations The edging of sidewalks, paved approaches, and curbs will create a distinct void; approximately one-half (1/2) inch horizontally between the structure and the turf. String trimmers will not be used in edging. Edging also includes the removal of all sand and debris from the areas designated to be edged. Upon completion of edging by the Contractor, no growth, sand or debris will touch any of the structures designated to be edged. The Contractor will remove all sand and debris from the areas designated for edging. The cost of this removal and disposal will be included in the unit price bid for mowing.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!