Miscellaneous Plumbing Requirements. (i) Tenant may locate a toilet anywhere on the floor at Tenant’s expense, subject to Building Codes, with prior approval by the Landlord. (ii) Kitchen sink will be stainless steel commercial grade with commercial grade faucets. Sinks can be either cold only or hot and cold. Heated water can come from either tank type water heater concealed in the ceiling or under the counter, or an Insta-Hot installed under the counter. (iii) Tenant must use low flow, quiet flush water closets and urinals, as approved by the Building Department. (iv) Hot water “pop-off” valve options: a) Pop-off valve drain line can terminate into slop sink, floor sink or other approved Building Department locations, but not into a floor drain. b) Water heaters can set, and pop-off into, a sealed sheet metal pan. Pan shall have drain line to a “Y” tail section of lavatory waste pipe, as approved by the Building Department.
Appears in 2 contracts
Samples: Sublease Agreement (Scynexis Inc), Office Lease (Optimer Pharmaceuticals Inc)
Miscellaneous Plumbing Requirements. (i) Tenant may locate a toilet anywhere on the floor at Tenant’s 's expense, subject to Building Codes, with prior approval by the Landlord.
(ii) Kitchen sink will be stainless steel commercial grade with commercial grade faucets. Sinks can be either cold only or hot and cold. Heated water can come from either tank type water heater concealed in the ceiling or under the counter, or an Insta-Hot installed under the counter.
(iii) Tenant must use low flow, quiet flush water closets and urinals, as approved by the Building Department.
(iv) Hot water “"pop-off” " valve options:: 101 HUDSON STREET TENANX XXXXXXXX XXXXXX
a) Pop-off valve drain line can terminate into slop sink, floor sink or other approved Building Department locations, but not into a floor drain.
b) Water heaters can set, and pop-off into, a sealed sheet metal pan. Pan shall have drain line to a “"Y” " tail section of lavatory waste pipe, as approved by the Building Department.
Appears in 1 contract
Miscellaneous Plumbing Requirements. (i) Tenant may locate a toilet anywhere on the floor at Tenant’s expense, subject to Building Codes, with prior approval by the Landlord.
(ii) Kitchen sink will be stainless steel commercial grade with commercial grade faucets. Sinks can be either cold only or hot and cold. Heated water can come from either tank type water heater concealed in the ceiling or under the counter, or an Insta-Hot installed under the counter.
(iii) Tenant must use low flow, quiet flush water closets and urinals, as approved by the Building Department.. 101 HXXXXX STREET TENANT CRITERIA MANUAL
(iv) Hot water “pop-off” valve options:
a) Pop-off valve drain line can terminate into slop sink, floor sink or other approved Building Department locations, but not into a floor drain.
b) Water heaters can set, and pop-off into, a sealed sheet metal pan. Pan shall have drain line to a “Y” tail section of lavatory waste pipe, as approved by the Building Department.
Appears in 1 contract