Modification of Final Specification Sample Clauses

Modification of Final Specification. A non-substantive correction to the Final Specification, for example the correction of a typographical error, may be submitted to the Board of Directors, which shall determine whether to approve the correction by Board Approval. Substantive corrections or modifications to the Final Specification shall require the approval of the revised Final Specification as a Draft Specification as provided for and in accordance with the process described in this Section 9.4.
AutoNDA by SimpleDocs

Related to Modification of Final Specification

  • Escrow Format Specification 3.1. Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Implementation Specifications 1. The Non-Exchange Entity must obtain informed consent from individuals for any use or disclosure of information that is not permissible within the scope of the Privacy Notice Statement and any relevant agreements that were in effect as of the time the PII was collected. Such consent must be subject to a right of revocation.

  • Modification of Schedules The Parties shall, upon written request by a Party, hold consultations to consider any modification or withdrawal of a specific commitment in the requesting Party’s Schedule of specific commitments. The consultations shall be held within three months after the requesting Party made its request. In the consultations, the Parties shall aim to ensure that a general level of mutually advantageous commitments no less favourable to trade than that provided for in the Schedule of specific commitments prior to such consultations is maintained. Modifications of Schedules are subject to the procedures set out in Articles 7.1 and 9.6

  • General specifications 6.1.1. A vehicle and its electrical/electronic system(s) or ESA(s) shall be so designed, constructed and fitted as to enable the vehicle, in normal conditions of use, to comply with the requirements of this Regulation.

Time is Money Join Law Insider Premium to draft better contracts faster.