Moisture Conditioning Sample Clauses

Moisture Conditioning. The Contractor's attention is drawn to the fact that meeting the specified moisture condition of this Specification is equally as important a compaction requirement as the specified Density Ratio. Tests at the time of the site investigation (September 2004) showed that the in-situ moisture contents of liner borrow materials were generally between ± 2% of optimum moisture content. Water addition or drying out that may be required in excess of this shall be carried out in the borrow area or at a temporary stockpile. After such moisture content adjustment in the borrow area or at a temporary stockpile, the lining material shall be stockpiled and allowed to cure for 24 hours prior to placement. The compacted surface of each layer of the liner should be kept moist by frequent watering until subsequent layers or the HDPE Liner is placed.
AutoNDA by SimpleDocs

Related to Moisture Conditioning

  • SUSPENSIVE CONDITION i) The contract only becomes binding and enforceable once:

  • SUSPENSIVE CONDITIONS 18.1 The Contract is subject to the suspensive condition that the Purchaser obtains a loan in the amount reflected in clause 7 of the SCHEDULE, forming part of the Purchase price payable by the Purchaser to the Seller for the Property, from a bank or other financial institution, against the security of a first mortgage bond over the Property in favour of such bank or financial institution, such loan to be approved in writing by such bank or financial institution within the period stipulated in clause 9 of the SCHEDULE.

  • Air Conditioning If the Apartment has been provided with a ledge for split air conditioning system with suitable provision for keeping outdoor units of the AC system and also the route to take refrigerant piping, which the Allottee shall have to strictly follow while installing AC units

  • Unsafe Conditions In accordance with 29 CFR § 1977, occasions might arise when an employee is confronted with a choice between not performing assigned tasks or subjecting himself/herself to serious injury or death arising from a hazardous condition at the workplace. If the employee, with no reasonable alternative, refuses in good faith to expose himself/herself to the dangerous condition, he/she would be protected against subsequent discrimination. The condition causing the employee's apprehension of death or injury must be of such a nature that a reasonable person, under the circumstances then confronting the employee, would conclude that there is a real danger of death or serious injury and that there is insufficient time, due to the urgency of the situation, to eliminate the danger by resorting to regular statutory enforcement channels. In addition, in such circumstances, the employee, where possible, must also have sought from his Employer, and been unable to obtain, a correction of the dangerous condition.

  • Safe Conditions Whenever an employee reports a condition which the employee feels represents a violation of safety or health rules and regulations or which is an unreasonable hazard to persons or property, such conditions shall be promptly investigated. The appropriate administrator shall reply to the concern, in writing, if the employee's concern is communicated in writing.

  • INCLEMENT CONDITIONS Section 1.

  • Subsurface Conditions Unless the Contract Documents stipulate specific quantities and units of rock or unsuitable soils, the Contractor shall assume material below the surface of the Earth to be earth and other material that can be removed by power shovel or similar equipment. Should conditions encountered below the surface of the ground be at variance to the number of unit requirements as indicated by drawings or specifications, and absent an agreed-upon unit price established prior to the bid by Addendum, or after contract execution by Change Order, the Contract Sum and/or time shall be adjusted as provided in the Contract Documents for changes in the work.

  • Site Conditions A. Existing Site Conditions: Information with respect to the site of the Work given in drawings or specifications has been obtained by County's representatives and is believed to be reasonably correct, but the County does not warrant either the completeness or accuracy of such information, and it is the responsibility of the Contractor to verify all such information.

  • SAFETY CONDITIONS 1.0 The responsibility for providing for safe working conditions that are in conformance with applicable law and which are within fiscal constraints shall be the District’s. Employees shall be responsible for complying with safety procedures and practices and for reporting any unsafe condition, facility, or equipment of which he/she is aware. The District shall be responsible for informing employees of necessary safety procedures and practices. There shall be no reprisal against an employee for reporting any real or potentially unsafe condition, facility, or equipment.

  • Adverse Weather Conditions Except in emergency situations, the Employer shall not require an employee:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!