Mud Chemical Hose Sample Clauses

Mud Chemical Hose. Quantity : 2 Size : 5” Make/Type : Color coding : yes/no: No Make/Type connection : To be confirmed with Client connections
AutoNDA by SimpleDocs
Mud Chemical Hose. Quantity: no. 2 Size: in 4” diameter 60 meter length Make/type: Techflow flexibies / liquid mud delivery hose soft wall WP 15 bar Color coding: yes/no Yes Make/type connection: 4” Todo Male
Mud Chemical Hose. Quantity no.: 2 x 150’ Size inch: 5 Make/Type : TBA Color coding yes/no: YES Make/Type connection : TBA Quantity no.: 2 x 150’ Size inch: 5 Make/ Type : TBA Color coding yes/no: YES Make/Type connection : TBA Quantity no.: 2 x 150’ Size inch: 4 Make/Type : TBA Color coding yes/no: YES Make/Type connection : TBA Pressure Rating 150 psi wp Quantity no.: 2 x 150’ Size inch: 4 Make/Type : TBA Color coding yes/no: YES Make/Type connection : TBA Quantity no.: 2 Specification (API, etc.) ABS /US-DEN Make : LIEBHERR Type : PEDESTAL Location (stbd, port, aft, frwd) : PORT & STBD Maximum rated capacity (main hook) mt 100 Maximum rated capacity (whip hook) mt 15 Boom length ft: 150 Line length (no Boom ft: 1893 Main Hoist ft: 1920 Whip line ft: 475 Maximum capacity and hoisting speeds Radius Metric Main Hoist Platform Lift 4 lines Meters Tons 6.6 92 8 10 92 11 92 15 84.7 20 71.8 25 62.8 30 55.6 35 47.2 40 39.7 45 33.8 48 31.1 No Load Main Hoist Seastate Lift 4 lines Radius Meters 6.6 Metric Tons 51.5 10 46 11 44.8 15 40.7 20 36.8 25 33.5 30 30.6 35 26.4 40 22.4 45 19.4 48 18 No load Main Hoist Platform Lift 2 lines Radius Meters 6.6 Metric Tons 50 10 50 11 50 15 50 20 50 25 50 30 50 35 47.2 40 39.7 45 33.8 48 31.1 No load Main Hoist Seastate Lift 2 lines Radius Meters 6.6 Metric Tons 31.9 10 31.9 11 31.9 15 31.9 20 31.9 25 31.9 30 30.6 9 35 26.4 40 22.4 45 19.4 48 18 No Load Whip Line Platform Lift Radius Meters 51 Metric Tons 15 Seastate lift 51 10 No Load Hook load indicator automatically corrected for boom angle yes/no: YES Alarm (audible, visual, both) : BOTH Automatic brake yes/no: YES Safety latch on hooks yes/no: YES Crown saver (limit switch) yes/no: YES Boom illumination yes/no: YES Baskets for personnel transfer no.: 2

Related to Mud Chemical Hose

  • Přetrvávající platnost Tento odstavec 1.3 “Zdravotní záznamy a Studijní data a údaje” zůstane závazný i v případě zániku platnosti či vypršení platnosti této Smlouvy.

  • Substance Abuse Program The SFMTA General Manager or designee will manage all aspects of the FTA-mandated Substance Abuse Program. He/she shall have appointing and removal authority over all personnel working for the Substance Abuse Program personnel, and shall be responsible for the supervision of the SAP.

  • Přetrvající platnost This Section 3 “

  • Clinical Management for Behavioral Health Services (CMBHS) System 1. request access to CMBHS via the CMBHS Helpline at (000) 000-0000. 2. use the CMBHS time frames specified by System Agency. 3. use System Agency-specified functionality of the CMBHS in its entirety. 4. submit all bills and reports to System Agency through the CMBHS, unless otherwise instructed.

  • First Source Hiring Program Contractor must comply with all of the provisions of the First Source Hiring Program, Chapter 83 of the San Francisco Administrative Code, that apply to this Agreement, and Contractor is subject to the enforcement and penalty provisions in Chapter 83.

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5

  • Orally Administered Anticancer Medication In accordance with RIGL § 27-20-67, prescription drug coverage for orally administered anticancer medications is provided at a level no less favorable than coverage for intravenously administered or injected cancer medications covered under your medical benefit.

  • Secondary Systems The Developer and Connecting Transmission Owner shall each cooperate with the other in the inspection, maintenance, and testing of control or power circuits that operate below 600 volts, AC or DC, including, but not limited to, any hardware, control or protective devices, cables, conductors, electric raceways, secondary equipment panels, transducers, batteries, chargers, and voltage and current transformers that directly affect the operation of Developer or Connecting Transmission Owner’s facilities and equipment which may reasonably be expected to impact the other Party. The Developer and Connecting Transmission Owner shall each provide advance notice to the other Party, and to NYISO, before undertaking any work on such circuits, especially on electrical circuits involving circuit breaker trip and close contacts, current transformers, or potential transformers.

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (xxxxx://xxxxx.xxx.xxxxx.xx.xx/tpasscmblsearch/index.jsp) or by contacting

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!