No Penetration of Membrane Sample Clauses

No Penetration of Membrane. Buyer acknowledges that if Buyer conducts, undertakes or permits any construction, remodeling, repair, alteration, or use of the Property which would result in the penetration of the landfill gas membrane improvements (the “Membrane”), Buyer will be required to comply with the “Repairs to Membrane” requirements and conditions described in the Landfill Gas Barrier, Venting, and Monitoring System and Membrane Repair information which is included in the Documents and Materials. Buyer will also be required to maintain the gas monitoring system and otherwise comply with the Site Specific Post Closure Maintenance Plan which will be completed on or following substantial completion of the Shell Improvements.
AutoNDA by SimpleDocs

Related to No Penetration of Membrane

  • Leave for Storms or Hazardous Conditions (a) Time lost by an employee as a result of absence or lateness due to storm conditions or because of the condition of public streets and highways or because an employee finds it necessary to seek permission to leave prior to the end of the regular shift must be:

  • Leave for Storm Or Hazardous Conditions It is the responsibility of the Nurse to make every reasonable effort to arrive at their work location as scheduled, however, during storm conditions, when such arrival is impossible, or delayed, all absent time will be deemed to be leave, and the Nurse has the option to:

  • No Installing Generator Not to install or keep or run any generator in the Said Apartment.

  • ALTERATION OF AGREEMENT A. It is hereby agreed that any alteration or modification of this Agreement shall be binding upon the parties only if agreed to in writing by both parties.

  • CERTIFICATION OF NO ASBESTOS CONTAINING MATERIALS OR WORK 8.1 The Contractor shall be responsible for ensuring that no asbestos containing materials or work is included within the scope of the Work. The Contractor shall take whatever measures it deems necessary to insure that all employees, suppliers, fabricators, material men, subcontractors, or their assigns, comply with this requirement.

  • No alterations No alterations or additions may be made to the premises nor may any fixtures be installed or placards, decorations or other articles be attached in any way to any part of the premises without the prior written approval of the Village Hall Secretary. Any alteration, fixture or fitting or attachment so approved shall at the discretion of the Village Hall remain in the premises at the end of the hiring. It will become the property of the Village Hall unless removed by the Hirer who must make good to the satisfaction of the Village Hall any damage caused to the premises by such removal.

  • No Alteration Not alter, modify or in any manner change the (1) elevation and exterior colour scheme of the said Apartment and the building and (2) design and/or the colour scheme of the windows, grills and the main door of the said Apartment.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • No Additional Work or Material No claim for additional services, not specifically provided in this contract, performed or furnished by the contractor, will be allowed, nor may the contractor do any work or furnish any material not covered by the contract unless the work or material is ordered in writing by the Project Director and approved by the Agency Head.

Time is Money Join Law Insider Premium to draft better contracts faster.