NOT OVERLOAD ELECTRICAL CIRCUITS Sample Clauses

NOT OVERLOAD ELECTRICAL CIRCUITS. You must not damage electric wires or overload the electrical circuits by using inappropriate multi-socket electrical adaptors or extension cables which are not surge protected when connecting appliances to the mains.
AutoNDA by SimpleDocs
NOT OVERLOAD ELECTRICAL CIRCUITS. You must not overload the electrical circuits by using inappropriate multi-socket electrical adaptors or extension cables when connecting equipment to the mains.

Related to NOT OVERLOAD ELECTRICAL CIRCUITS

  • Electrical Provide drawings for the following systems:

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Overload A regular employee who works an overload in a given year shall receive no less than either:

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Electrical connections Equipment requiring electrical connections for operation shall either be hard wired to the Authorized User's provided connections or the Contractor shall be responsible for a male electrical union. All connections shall be made by the Contractor and accomplished in accordance with National Electrical Code requirements. Electrically operated equipment shall be available in the following volts and phases: 208 volt 1 or 3 phase, 60 HZ 220 volt 1 or 3 phase, 60 HZ 440 volt 1 or 3 phase, 60 HZ

  • Overload Teaching Paragraph 1: Overload teaching is that teaching conducted by a full-time classroom teacher teaching daily in a vacant position during his/her planning period.

  • Mechanical a. Heating and cooling load calculations as required and major duct or pipe runs sized to interface with structural.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!