Common use of NOTICE IDENTIFICATION Clause in Contracts

NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: Xxxxxxx Xxxxxxxx, P.E., Chief Engineer Department of Transportation 0000 Xxxx Xxxxxx Xxxxx 5th Floor Denver, CO 80204 With copies to (State Buildings Program (or Delegate) State of Colorado): Xxxxxx X. Xxxxxx Department of Transportation Property Management 0000 Xxxx Xxxxxx Xxxxx 4th Floor Denver, CO 80204 Notice to Contractor: With copies to: *Persons signing for Contractor hereby swear and affirm that they are authorized to act on Contractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted THE CONTRACTOR STATE OF COLORADO, acting by and through: Department of Transportation By: Legal Name of Contracting Entity Xxxxxxx Xxxxxxxx, P.E., Chief Engineer Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: By: Xxxxxx X. Xxxxxx Date: C.R.S. § 00-00-000 requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Contractor is not authorized to begin performance until such time. If Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Contactor for such performance or for any goods and/or services provided hereunder. STATE OF COLORADO STATE CONTROLLER'S OFFIC E State Controller (or authorized Delegate) STATE OF COLORADO‌ (STATE FORM SC-6.21) CONTRACTOR’S BID (Form SBP-6.13) ADVERTISEMENT FOR BID ADDENDA‌‌ STATE OF COLORADO‌ OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS BID Institution/Agency: Colorado Department of Transportation Project No./Name: 23332/Glenwood Springs 11 Bay VSF, Communications Bldg & Site Work Bidder Acknowledges Receipt of Addenda Numbers: Bidder Anticipates Services outside the United States or Colorado:* No Yes If Yes see 3A below Bidder will comply with 80% Colorado Labor on project above $500,000: Yes No If No see 3B below Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes If Yes see 3C below Base Bid $ (Refer to Bid Alternate Form SC-6.13.1 Attached, If Applicable) Bidder’s Time of Completion a. Time Period from Notice to Proceed to Substantial Completion: b. Time Period from Substantial Completion to Final Acceptance: c. Total Time of Completion of Entire Project (a + b): 1. BID: Pursuant to the advertisement by the State of Colorado dated the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.

Appears in 1 contract

Samples: Contractor's Design/Bid/Build Agreement

AutoNDA by SimpleDocs

NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: Xxxxxxx Xxxxxxxx, P.E., Chief Engineer Department of Transportation 0000 Xxxx Xxxxxx Xxxxx 5th Floor Denver, CO 80204 [Name and address] With copies to (State Buildings Program (or Delegate) State of Colorado): Xxxxxx X. Xxxxxx Department of Transportation Property Management 0000 Xxxx Xxxxxx Xxxxx 4th Floor Denver, CO 80204 [Name and address] Notice to ContractorConstruction Manager: [Name and address] With copies to: File [Name and address] *Persons signing for Contractor Construction Manager hereby swear and affirm that they are authorized to act on ContractorConstruction Manager’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted accepted. REGENTS OF THE CONTRACTOR STATE UNIVERSITY OF COLORADO, a body corporate, acting by and through: Department of Transportation through the UNIVERSITY OF COLORADO COLORADO SPRINGS By: Legal Name of Contracting Entity Xxxxxxx XxxxxxxxXxxx Xxxxx, P.E., Chief Engineer Principal Representative Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: By: Xxxxxx X. Xxxxxx Date: DEPARTMENT OF LAW Attorney General (or authorized Delegate) Date: C.R.S. § 00-00-000 requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Contractor Construction Manager is not authorized to begin performance until such time. If Contractor Construction Manager begins performing prior thereto, the State of Colorado is not obligated to pay Contactor Construction Manager for such performance or for any goods and/or services provided hereunder. STATE OF COLORADO STATE CONTROLLER'S OFFIC E ’S OFFICE State Controller (or authorized Delegate) STATE OF COLORADO‌ Date: (STATE FORM SC-6.21SC-6.5) CONTRACTOR(Attached) SC-6.5 Rev. 7/2020 PHASE: PRECONSTRUCTION PRE- CONST SVCS FEE CONST SRVS FEE GEN CONDS. DIRECT COST OF WORK ARCHITECTURAL SELECTION X CIVIL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND OTHER SUB- CONSULTANTS AS APPLICABLE 1 2 SPECIAL CONSULTANT SELECTION X SURVEYOR SELECTION X SITE SELECTION RECOMMENDATIONS 2 1 REVIEW DESIGN CONCEPTS X DEVELOP BID PACKAGES/SUB- CONTRACTING STRATEGY 1 2 SITE USE RECOMMENDATIONS 2 1 MATERIAL SELECTION RECOMMENDATIONS 2 1 BUILDINGS SYSTEMS RECOMMENDATONS 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (MOVEABLE) 2 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (FIXED) 2 2 1 CONSTRUCTION FEASIBILITY RECOMMENDATIONS 1 2 PROJECT MASTER SCHEDULING X BID PACKAGE RECOMMENDATIONS 1 2 LIFE CYCLE COSTING ANALYSIS 2 1 INFORMAL AND FORMAL VALUE ENGINEERING X 2 ENERGY USE ANALYSIS AND RECOMMENDATIONS 2 1 PRELIMINARY TOTAL COST FEASIBILITY REVIEW 1 2 LABOR AVAILABILITY REVIEW (SUBCONTRACTORS) X MATERIAL EQUIPMENT AND CONTRACTOR AVAILABILITY X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PROJECT BUDGETING AND COST CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK TOTAL PROJECT COST BUDGET X CONSTRUCTION COST BUDGET X CONSTRUCTION COST BUDGET ESTIMATES X PRELIMINARY COST MODEL X SCHEMATIC DESIGN PHASE ESTIMATES X DESIGN DEVELOPMENT PHASE ESTIMATES X BID PACKAGE/SUBCONTRACT ESTIMATES X CASH FLOW PROJECTIONS X PHASE FUNDING MODELING X MATERIAL SURVEYS X TRADE CONTRACTOR ESTIMATES X CHANGE ORDER ESTIMATES X SET-UP COST ACCOUNTING X SET-UP REPORTING METHODS X SET-UP PAYMENT PROCEDURES 2 1 SET-UP CHANGE ORDER PROCEDURES 1 2 1 CONTINUAL PROJECT COST MONITORING 1 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: SUB-CONTRACTING SELECTION AND PURCHASING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK SET PRE-QUALIFICATION CRITERIA 1 2 RECOMMEND SUBCONTRACTOR SELECTION METHODS X RECOMMEND SUBCONTRACTOR AWARD SELECTION METHODS X DEVELOP CONTRACTOR INTEREST X PREPARE BIDDING SCHEDULES X CONDUCT PRE-BID CONFERENCE AND ISSUE PLANS X RECEIVE BIDS 1 2 ANALYZE BIDS 1 2 RECOMMEND AWARD 1 2 2 VERIFY UNIT COSTS X NEGOTIATE UNION RATES AND MANPOWER COSTS REQUIRED X CONDUCT PRE-AWARD CONFERENCES X PREPARE CONTRACTS X SUPPLIER AND SUBCONTRACTOR REVIEW X ORIGINATE RFI’S AFTER SCREENING X PREPARE CHANGE ORDERS 1 2 VERIFY CORRECTNESS OF QUANTITIES AND PRICES OF CHANGE ORDERS 1 2 COORDINATE OWNER-SUPPLIED FIXED EQUIPMENT 2 1 1 Responsibility: x = Total 1 = Primary 2 = Secondary FEASIBILITY REVIEW AND RECOMMENDATIONS X CONSTRUCTIBILITY REVIEW AND RECOMMENDATIONS X SUBCONTRACTOR WORK SCOPING X RESPONSIBILITY FOR: SAFETY PRECAUTIONS X SAFETY PROGRAMS X TEMPORARY FACILITIES X COMMON USE EQUIPMENT X COMMON USE SERVICES X REVIEW FOR: JURISDICTIONAL OVERLAP X INCLUSION OF ALL WORK X PHASE CONSTRUCTION COORD. X IDENTIFY LONG LEAD ITEMS X OBTAIN AGENCY APPROVALS 2 1 ASSIST IN OBTAINING PERMITS (AS NEEDED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: CONSTRUCTION PHASE STAFF PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK PROJECT MANAGER/ASSISTANT PROJECT MANAGER (AS REQUIRED) X PROJECT SUPERINTENDENT (AS REQUIRED) X ASSISTANT PROJECT SUPERINTENDENT X MECHANICAL COORDINATOR (AS REQUIRED) X ELECTRICAL COORDINATOR (AS REQUIRED) X OFFICE ENGINEER (AS REQUIRED) X ENGINEERING AND LAYOUT (AS REQUIRED) X FIELD ENGINEER-LINE AND GRADE (AS REQUIRED) X DRAWING CHECKER (AS REQUIRED) X XXXXXX AND HELPERS (AS REQUIRED) X TIME KEEPER/CHECKER (AS REQUIRED) X SCHEDULING ENGINEER (AS REQUIRED) X PROJECT COORDINATOR X COST ENGINEER (AS REQUIRED) X CLERK-TYPIST (AS REQUIRED) X SAFETY ENGINEER (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TRAVEL AND LODGING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STAFF TRAVEL COST X STAFF TRANSPORTATION X PROJECT STAFF MOVING EXPENSES X PROJECT STAFF SUBSISTENCE COSTS X PHASE: TEMPORARY FACILITIES SAFETY EQUIPMENT AND FIRST AID SUPPLIES X HANDRAILS AND TOE BOARDS X OPENING PROTECTION X FIRE EXTINGUISHERS X WATCHMAN SERVICE X OFFICE OR TRAILER RENTAL X HYDRATION STATION CUPS X TEMPORARY STAIRS X PROJECT SIGNS X BULLETIN BOARDS X CONSTRUCTION FENCING X BARRICADES AND COVERED WALKWAYS (AS REQUIRED) X SAFETY NETS (AS REQUIRED) X A/E TEMPORARY OFFICE (AS REQUIRED) X TEMPORARY TOILETS X Responsibility: x = Total 1 = Primary 2 = Secondary TEMPORARY TELEPHONE INSTALLATION AND EXPENSE (INCLUDING LOCAL A/E) X TEMPORARY POWER SERVICE X POWER SERVICE X TEMPORARY WATER AND HEATING SERVICE X HEATING ENERGY CHARGES X TEMPORARY WIRING X LIGHT BULBS X DAILY CLEAN-UP 1 2 WEEKLY TRASH-REMOVAL 1 2 FINAL CLEAN-UP 1 2 DUMP PERMITS AND FEES X DEBRIS HAULING/REMOVAL X FLAGMAN/TRAFFIC CONTROL (AS REQUIRED) X FUELS FOR INITIAL TANK FILLING X TEMPORARY ROADS X ROADWAY MAINTENANCE X DUST CONTROLS X TEMPORARY EROSION CONTROL X TEMP. WATER /SEWER EXPENSE & WATER EXPENSES - SITE GRADING & COMPACTION X TWO-WAY RADIO EQUIPMENT (AS REQUIRED) X TRASH CHUTE AND HOPPERS (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: ON-SITE EQUIPMENT PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK AUTOMOBILE AND FUEL (AS REQUIRED) X PICK-UP TRUCK AND FUEL (AS REQUIRED) X FLATBED TRUCK AND FUEL (AS REQUIRED) X WATER TRUCK (AS REQUIRED) X AIR COMPRESSOR AND FUEL (AS REQUIRED) X DEWATERING EQUIPMENT AND FUEL (AS REQUIRED) X TEMPORARY GENERATOR AND FUEL (AS REQUIRED) X DEBRIS REMOVAL/HAULING EQUIPMENT (AS REQUIRED) X SNOW REMOVAL (AS REQUIRED) X TIRES AND MAINTENANCE COST (AS REQUIRED) X FORKLIFT OPERATOR X MATERIAL HOIST OPERATOR X PERSONNEL OPERATOR X FIXED CRANE OPERATOR X TRAVEL CRANE OPERATOR X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TEMPORARY HEATING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK REMOVE SNOW AND ICE (AS REQUIRED) X TEMPORARY ENCLOSURES (AS REQUIRED) X PIPING COST IN BUILDING (AS REQUIRED) X FUEL COST FOR HEATING (AS REQUIRED) X POWER COST FOR HEATING (AS REQUIRED) X FURNACE RENTAL (AS REQUIRED) X HEATER RENTAL (AS REQUIRED) X BOILER RENTAL (AS REQUIRED) X OPERATOR - TEMPORARY SYSTEMS (AS REQUIRED) X OPERATION FIRE WATCH (AS REQUIRED) X CLEANING COST (AS REQUIRED) X MAINTENANCE COST (AS REQUIRED) X EXTENDED WARRANTY COST (AS REQUIRED) X FILTER CHANGE (AS REQUIRED) X TEMPORARY OFFICE HEATING (AS REQUIRED) X TEMP WEATHER PROTECTION & HEATING FOR SUBCONTRACTORS (AS REQ’D) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: REPRODUCTION/PRINTING AND DATA PROCESSING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK COST STUDY DOCUMENTS X SYSTEMS STUDY DOCUMENTS X BID PACKAGE SETS (Form SBP-6.13SEE PARAGRAPH 3.5.9) ADVERTISEMENT X BIDDING INSTRUCTIONS X CONSTRUCTION DOCUMENTS ORIGINAL X POSTAGE AND EXPRESS COSTS (CM/GC ISSUES PLANS) X AS-BUILT SUB-DOCUMENTS X AS-BUILT DOCUMENTS X ACCOUNTING FORMS X FIELD REPORTING FORMS X SUBCONTRACT AGREEMENT FORMS X SCHEDULE REPORT FORMS X ESTIMATING FORMS X COST REPORTING FORMS X VALUE ANALYSIS STUDIES PRINTING X DATA PROCESSING (MAIN OFFICE) X REFERENCE MATERIALS X SHOP DRAWING PRINTING X ON-SITE FAX AND COPIER X DATA PROCESSING (ON-SITE) X MAINTENANCE MANUALS (FROM SUBS) AND OPERATIONS MANUALS (FROM SUBS) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: QUALITY CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK FIELD INSPECTOR (AS REQUIRED) X INSPECTORS’ OFFICE (AS REQUIRED) X INSPECTORS’ TRANSPORTATION (AS REQUIRED) X INSPECTORS’ EQUIPMENT (AS REQUIRED) X SPECIAL INSPECTION CONSULTANTS X SPECIAL TESTING CONSULTANTS X CONCRETE SUBSTRUCTURE- OBSERVATIONS X CONCRETE TESTING X MASONRY TESTING X COMPACTION TESTING X WELDING TESTING X PIER INSPECTION/TESTING X SOILS INVESTIGATION X SPECIAL TESTING SERVICES (EXCEPT AS NOTED) X PROJECT PHOTOGRAPHS X WARRANTY INSPECTIONS / REWORK 1 2 AIR AND WATER BALANCING X OPERATOR ON-SITE TRAINING X PREPARE OPERATION/MAINTENANCE MANUALS 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PERMITS AND SPECIAL FEES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STORAGE YARD RENTAL X PARKING LOT RENTALS AND SHUTTLE EXPENSES (AS REQUIRED) 2 1 FIELD OFFICE STAFF PARKING FEES X SIGN PERMITS X STREET/CURB PERMIT X BUILDING PERMITS X PLAN CHECK FEES X WATER SYSTEM DEV. FEE X SEWER USE & DRAINAGE PERMIT/DEV. FEE X STORM CONNECTION FEE X GAS AND POWER SERVICE CHARGE (PERMANENT) X GAS AND POWER SERVICE CHARGE (TEMPORARY) X STEAM SERVICE CHARGE X CHILLER WATER SERVICE CHARGE X SPECIAL TAP FEES X CONTRACTORS LICENSES X CONSTRUCTION EQUIPMENT LICENSES X CONSTRUCTION EQUIPMENT PERMITS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: INSURANCE AND BONDS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK BUILDERS RISK INSURANCE X GENERAL LIABILITY, INCLUDING AUTOMOBILE X PRODUCT LIABILITY X EXCESS LIABILITY COVERAGE X WORKERS COMPENSATION (FIELD OFFICE STAFF) X FICA INSURANCE (FIELD OFFICE STAFF) X FEDERAL UNEMPLOYMENT (FIELD OFFICE STAFF) X STATE UNEMPLOYMENT (FIELD OFFICE STAFF) X CONSTRUCTION MANAGER’S PAYMENT BOND X CONSTRUCTION MANAGER’S PERFORMANCE BOND X STATE/LOCAL BONDS X * SUBCONTRACTOR BONDS X Responsibility: x = Total 1 = Primary 2 = Secondary * ONLY AS MUTUALLY AGREED UPON BETWEEN THE PRINCIPAL REPRESENTATIVE AND THE CONSTRUCTION MANAGER. PHASE: OTHER COSTS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CONSTRUCTION EQUIPMENT X CONSTRUCTION SERVICES LABOR X CONSTRUCTION MATERIALS X COST OF DESIGN AND ENGINEERING X A/E FAST TRACK COST EXTRAS X PRELIMINARY SOILS INVESTIGATION X TITLE/DEVELOPMENT COST X BUILDING OPERATION AFTER MOVE-IN X BUILDING MAINTENANCE AFTER MOVE-IN X MOVING COORDINATION X MOVING COSTS X COSTS OF EMERGENCY WORK X CONSTRUCTION MANAGER GENERAL OVERHEAD COST X CONSTRUCTION MANAGER PROFIT MARGIN X GMP FINANCIAL RESPONSIBILITIES X STATE REQUIRED INSPECTIONS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: OFF-SITE SERVICES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CORPORATE EXECUTIVES (AS REQUIRED) X X PRINCIPAL IN CHARGE (AS REQUIRED) X X PROJECT EXECUTIVE (AS REQUIRED) X X LEGAL - BASIC SERVICES (AS REQUIRED) X X ACCOUNTING (AS REQUIRED) X PURCHASING (AS REQUIRED) X SAFETY OFFICER (AS REQUIRED) X EEO OFFICER (AS REQUIRED) X X SECRETARIAL AND CLERK-TYPIST (AS REQUIRED) X X BENEFITS AND VACATIONS FOR BID ADDENDA‌‌ ABOVE X X STAFF BONUSES X Responsibility: x = Total 1 = Primary 2 = Secondary (STATE OF COLORADO‌ FORM SC-6.5) I hereby certify: a. That I am the and duly authorized representative of the firm of: b. That the wage rates and other factual unit costs supporting the compensation to be paid by the State for these professional services and other services are accurate, complete, and current; and c. That I understand the original contract price and any additions shall be adjusted to exclude any significant sums by which the State determines the contract price had been increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs; and d. That all such contract adjustments shall be made within one year following the end of this contract. OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS BID Institution/Agency: Colorado Department of Transportation Project No./Name: 23332/Glenwood Springs 11 Bay VSF, Communications Bldg & Site Work Bidder Acknowledges Receipt of Addenda Numbers: Bidder Anticipates Services outside the United States or Colorado:* No Yes If Yes see 3A below Bidder will comply with 80% Colorado Labor on project above $500,000: Yes No If No see 3B below Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes If Yes see 3C below Base Bid $ (Refer to Bid Alternate Form SC-6.13.1 Attached, If Applicable) BidderPROGRAM EXHIBIT C REQUEST FOR PROPOSAL STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAM EXHIBIT D CONSTRUCTION MANAGER’S FEE PROPOSAL D.1 Construction Manager’s Time of Completion a. Time Period from Notice to Proceed to Substantial Completion: b. Time Period from Substantial Completion to Final Acceptance: c. Total Time of Completion of Entire Project (a + b): 1. BID: Pursuant to the advertisement by the State of Colorado dated the undersigned bidder hereby proposes to furnish all the labor Fee Proposal D.2 Certificate and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.Affidavit Regarding Unauthorized Immigrants

Appears in 1 contract

Samples: Construction Manager/General Contractor Agreement

NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: Xxxxxxx Xxxxxxxx, P.E., Chief Engineer Department of Transportation 0000 Xxxx Xxxxxx Xxxxx 5th Floor Denver, CO 80204 With copies to (State Buildings Program (or Delegate) State of Colorado): Xxxxxx X. Xxxxxx Department of Transportation Property Management 0000 Xxxx Xxxxxx Xxxxx 4th Floor Denver, CO 80204 Notice to Contractor: With copies to: *Persons signing for Contractor hereby swear and affirm that they are authorized to act on Contractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted THE CONTRACTOR STATE OF COLORADO, acting by and through: Department of Transportation By: Legal Name of Contracting Entity Xxxxxxx Xxxxxxxx, P.E., Chief Engineer Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: By: Xxxxxx X. Xxxxxx Date: C.R.S. § 00-00-000 requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Contractor is not authorized to begin performance until such time. If Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Contactor for such performance or for any goods and/or services provided hereunder. STATE OF COLORADO STATE CONTROLLER'S OFFIC E State Controller (or authorized Delegate) STATE OF COLORADO‌ (STATE FORM SC-6.21) CONTRACTOR’S BID (Form SBP-6.13) ADVERTISEMENT FOR BID ADDENDA‌‌ STATE OF COLORADO‌ OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS BID Institution/Agency: Colorado Department of Transportation Project No./Name: 2333223364/Glenwood Springs 11 Bay VSF, Communications Bldg Rangely Office & Site Work Bidder Acknowledges Receipt of Addenda Numbers: Restroom Remodel Bidder Anticipates Services outside the United States or Colorado:* No Yes If Yes see 3A below Bidder will comply with 80% Colorado Labor on project above $500,000: Yes No If No see 3B below Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes If Yes see 3C below Base Bid $ (Refer to Bid Alternate Form SC-6.13.1 Attached, If Applicable) Bidder’s Time of Completion Completion a. Time Period from Notice to Proceed to Substantial Completion: b. Time Period from Substantial Completion to Final Acceptance: c. Total Time of Completion of Entire Project (a + b): 1. BID: Pursuant to the advertisement by the State of Colorado dated the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.

Appears in 1 contract

Samples: Contractor's Design/Bid/Build Agreement

NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: Xxxxxxx Xxxxxxxx, P.E., Chief Engineer Department of Transportation 0000 Xxxx Xxxxxx Xxxxx 5th Floor Denver, CO 80204 With copies to (State Buildings Program (or Delegate) State of Colorado): Xxxxxx X. Xxxxxx Department of Transportation Property Management 0000 Xxxx Xxxxxx Xxxxx 4th Floor Denver, CO 80204 : Notice to Contractor: With copies to: File *Persons signing for Contractor hereby swear and affirm that they are authorized to act on Contractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted THE CONTRACTOR STATE OF COLORADO, acting by and through: Department (Insert Name of Transportation Agency or IHE) By: Legal Name of Contracting Entity Xxxxxxx Xxxxxxxx, P.E., Chief Engineer (Insert Name & Title of Principal Representative for Agency or IHE) Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: By: Xxxxxx X. Xxxxxx (Insert Name of Authorized Individual) Date: C.R.S. § 00-00-000 requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Contractor is not authorized to begin performance until such time. If Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Contactor for such performance or for any goods and/or services provided hereunder. APPROVED: STATE OF COLORADO STATE CONTROLLER'S OFFIC E OFFICE State Controller (or authorized Delegate) STATE OF COLORADO‌ By: (Insert Name & Title of Authorized Individual) Date: (STATE FORM SC-6.21) CONTRACTOR’S BID (Form SBP-6.13STATE FORM SC-6.21) ADVERTISEMENT FOR BID ADDENDA‌‌ STATE OF COLORADO‌ OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS BID Institution/Agency: Colorado Department PROGRAM PERFORMANCE BOND That the Contractor as Principal and hereinafter called “Principal,” and as Surety and hereinafter called “Surety,” a corporation organized and existing under the laws of Transportation Project No./Name: 23332/Glenwood Springs 11 Bay VSFare held and firmly bound unto the STATE OF COLORADO acting by and through (AGENCY OR INSTITUTION) hereinafter called the “Principal Representative”, Communications Bldg & Site Work Bidder Acknowledges Receipt in the sum of Addenda Numbers: Bidder Anticipates Services outside the United States or Colorado:* No Yes If Yes see 3A below Bidder will comply with 80% Colorado Labor on project above $500,000: Yes No If No see 3B below Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes If Yes see 3C below Base Bid Dollars ($ (Refer to Bid Alternate Form SC-6.13.1 Attached, If Applicable) Bidder’s Time of Completion a. Time Period from Notice to Proceed to Substantial Completion: b. Time Period from Substantial Completion to Final Acceptance: c. Total Time of Completion of Entire Project (a + b): 1. BID: Pursuant to the advertisement by the State of Colorado dated the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete payment whereof the Principal and prompt execution of everything described or shown in or reasonably implied from the Bidding DocumentsSurety bind themselves, including the Drawings their heirs, executors, administrators, successors and Specificationsassigns, for the work jointly and for the base bid indicated above. Bidders should include all taxes that are applicableseverally, firmly, by these presents.

Appears in 1 contract

Samples: Contractor's Design/Bid/Build Agreement

NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: Xxxxxxx Xxxxxxxx, P.E., Chief Engineer Department of Transportation 0000 Xxxx Xxxxxx Xxxxx 5th Floor Denver, CO 80204 [Name and address] With copies to (State Buildings Program (or Delegate) State of Colorado): Xxxxxx X. Xxxxxx Department of Transportation Property Management 0000 Xxxx Xxxxxx Xxxxx 4th Floor Denver, CO 80204 [Name and address] Notice to ContractorConstruction Manager: [Name and address] With copies to: File [Name and address] *Persons signing for Contractor Construction Manager hereby swear and affirm that they are authorized to act on ContractorConstruction Manager’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted accepted. THE CONTRACTOR CONSTRUCTION MANAGER: STATE OF COLORADO, acting by and through: Department of Transportation REGENTS OF THE UNIVERSITY OF COLORADO, a body corporate, acting by and through the UNIVERSITY OF COLORADO COLORADO SPRINGS By: Legal Name of Contracting Entity Xxxxxxx XxxxxxxxXxxx Xxxxx, P.E., Chief Engineer Principal Representative Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By By: STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: Name (print) Title By: Xxxxxxx Xxx, R.A., Delegee Date: APPROVED DEPARTMENT OF LAW Attorney General (or authorized Delegate) By: Xxxxxxxx Xxxxxx X. Xxxxxx or Xxx Xxxxx, Legal Counsel Date: C.R.S. § 00-00-000 requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Contractor Construction Manager is not authorized to begin performance until such time. If Contractor Construction Manager begins performing prior thereto, the State of Colorado is not obligated to pay Contactor Construction Manager for such performance or for any goods and/or services provided hereunder. APPROVED: STATE OF COLORADO STATE CONTROLLER'S OFFIC E ’S OFFICE State Controller (or authorized Delegate) STATE OF COLORADO‌ By: Xxxxxxx Xxxx, Delegee Date: XXXXX XX XXXXXXXX CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.21SC-6.5) CONTRACTOR(Attached) PHASE: PRECONSTRUCTION PRE- CONST SVCS FEE CONST SRVS FEE GEN CONDS. DIRECT COST OF WORK ARCHITECTURAL SELECTION X CIVIL, STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL AND OTHER SUB-CONSULTANTS AS APPLICABLE 1 2 SPECIAL CONSULTANT SELECTION X SURVEYOR SELECTION X SITE SELECTION RECOMMENDATIONS 2 1 REVIEW DESIGN CONCEPTS X DEVELOP BID PACKAGES/SUB-CONTRACTING STRATEGY 1 2 SITE USE RECOMMENDATIONS 2 1 MATERIAL SELECTION RECOMMENDATIONS 2 1 BUILDINGS SYSTEMS RECOMMENDATONS 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (MOVEABLE) 2 2 1 BUILDING EQUIPMENT RECOMMENDATIONS (FIXED) 2 2 1 CONSTRUCTION FEASIBILITY RECOMMENDATIONS 1 2 PROJECT MASTER SCHEDULING X BID PACKAGE RECOMMENDATIONS 1 2 LIFE CYCLE COSTING ANALYSIS 2 1 INFORMAL AND FORMAL VALUE ENGINEERING X 2 ENERGY USE ANALYSIS AND RECOMMENDATIONS 2 1 PRELIMINARY TOTAL COST FEASIBILITY REVIEW 1 2 LABOR AVAILABILITY REVIEW (SUBCONTRACTORS) X MATERIAL EQUIPMENT AND CONTRACTOR AVAILABILITY X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PROJECT BUDGETING AND COST CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK TOTAL PROJECT COST BUDGET X CONSTRUCTION COST BUDGET X CONSTRUCTION COST BUDGET ESTIMATES X PRELIMINARY COST MODEL X SCHEMATIC DESIGN PHASE ESTIMATES X DESIGN DEVELOPMENT PHASE ESTIMATES X BID PACKAGE/SUBCONTRACT ESTIMATES X CASH FLOW PROJECTIONS X PHASE FUNDING MODELING X MATERIAL SURVEYS X TRADE CONTRACTOR ESTIMATES X CHANGE ORDER ESTIMATES X SET-UP COST ACCOUNTING X SET-UP REPORTING METHODS X SET-UP PAYMENT PROCEDURES 2 1 SET-UP CHANGE ORDER PROCEDURES 1 2 1 CONTINUAL PROJECT COST MONITORING 1 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: SUB-CONTRACTING SELECTION AND PURCHASING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK SET PRE-QUALIFICATION CRITERIA 1 2 RECOMMEND SUBCONTRACTOR SELECTION METHODS X RECOMMEND SUBCONTRACTOR AWARD SELECTION METHODS X DEVELOP CONTRACTOR INTEREST X PREPARE BIDDING SCHEDULES X CONDUCT PRE-BID CONFERENCE AND ISSUE PLANS X RECEIVE BIDS 1 2 ANALYZE BIDS 1 2 RECOMMEND AWARD 1 2 2 VERIFY UNIT COSTS X NEGOTIATE UNION RATES AND MANPOWER COSTS REQUIRED X CONDUCT PRE-AWARD CONFERENCES X PREPARE CONTRACTS X SUPPLIER AND SUBCONTRACTOR REVIEW X ORIGINATE RFI’S AFTER SCREENING X PREPARE CHANGE ORDERS 1 2 VERIFY CORRECTNESS OF QUANTITIES AND PRICES OF CHANGE ORDERS 1 2 COORDINATE OWNER-SUPPLIED FIXED EQUIPMENT 2 1 1 Responsibility: x = Total 1 = Primary 2 = Secondary FEASIBILITY REVIEW AND RECOMMENDATIONS X CONSTRUCTIBILITY REVIEW AND RECOMMENDATIONS X SUBCONTRACTOR WORK SCOPING X RESPONSIBILITY FOR: SAFETY PRECAUTIONS X SAFETY PROGRAMS X TEMPORARY FACILITIES X COMMON USE EQUIPMENT X COMMON USE SERVICES X REVIEW FOR: JURISDICTIONAL OVERLAP X INCLUSION OF ALL WORK X PHASE CONSTRUCTION COORD. X IDENTIFY LONG LEAD ITEMS X OBTAIN AGENCY APPROVALS 2 1 ASSIST IN OBTAINING PERMITS (AS NEEDED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: CONSTRUCTION PHASE STAFF PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK PROJECT MANAGER/ASSISTANT PROJECT MANAGER (AS REQUIRED) X PROJECT SUPERINTENDENT (AS REQUIRED) X ASSISTANT PROJECT SUPERINTENDENT X MECHANICAL COORDINATOR (AS REQUIRED) X ELECTRICAL COORDINATOR (AS REQUIRED) X OFFICE ENGINEER (AS REQUIRED) X ENGINEERING AND LAYOUT (AS REQUIRED) X FIELD ENGINEER-LINE AND GRADE (AS REQUIRED) X DRAWING CHECKER (AS REQUIRED) X XXXXXX AND HELPERS (AS REQUIRED) X TIME KEEPER/CHECKER (AS REQUIRED) X SCHEDULING ENGINEER (AS REQUIRED) X PROJECT COORDINATOR X COST ENGINEER (AS REQUIRED) X CLERK-TYPIST (AS REQUIRED) X SAFETY ENGINEER (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TRAVEL AND LODGING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STAFF TRAVEL COST X STAFF TRANSPORTATION X PROJECT STAFF MOVING EXPENSES X PROJECT STAFF SUBSISTENCE COSTS X PHASE: TEMPORARY FACILITIES SAFETY EQUIPMENT AND FIRST AID SUPPLIES X HANDRAILS AND TOE BOARDS X OPENING PROTECTION X FIRE EXTINGUISHERS X WATCHMAN SERVICE X OFFICE OR TRAILER RENTAL X HYDRATION STATION CUPS X TEMPORARY STAIRS X PROJECT SIGNS X BULLETIN BOARDS X CONSTRUCTION FENCING X BARRICADES AND COVERED WALKWAYS (AS REQUIRED) X SAFETY NETS (AS REQUIRED) X A/E TEMPORARY OFFICE (AS REQUIRED) X TEMPORARY TOILETS X Responsibility: x = Total 1 = Primary 2 = Secondary TEMPORARY TELEPHONE INSTALLATION AND EXPENSE (INCLUDING LOCAL A/E) X TEMPORARY POWER SERVICE X POWER SERVICE X TEMPORARY WATER AND HEATING SERVICE X HEATING ENERGY CHARGES X TEMPORARY WIRING X LIGHT BULBS X DAILY CLEAN-UP 1 2 WEEKLY TRASH-REMOVAL 1 2 FINAL CLEAN-UP 1 2 DUMP PERMITS AND FEES X DEBRIS HAULING/REMOVAL X FLAGMAN/TRAFFIC CONTROL (AS REQUIRED) X FUELS FOR INITIAL TANK FILLING X TEMPORARY ROADS X ROADWAY MAINTENANCE X DUST CONTROLS X TEMPORARY EROSION CONTROL X TEMP. WATER /SEWER EXPENSE & WATER EXPENSES - SITE GRADING & COMPACTION X TWO-WAY RADIO EQUIPMENT (AS REQUIRED) X TRASH CHUTE AND HOPPERS (AS REQUIRED) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: ON-SITE EQUIPMENT PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK AUTOMOBILE AND FUEL (AS REQUIRED) X PICK-UP TRUCK AND FUEL (AS REQUIRED) X FLATBED TRUCK AND FUEL (AS REQUIRED) X WATER TRUCK (AS REQUIRED) X AIR COMPRESSOR AND FUEL (AS REQUIRED) X DEWATERING EQUIPMENT AND FUEL (AS REQUIRED) X TEMPORARY GENERATOR AND FUEL (AS REQUIRED) X DEBRIS REMOVAL/HAULING EQUIPMENT (AS REQUIRED) X SNOW REMOVAL (AS REQUIRED) X TIRES AND MAINTENANCE COST (AS REQUIRED) X FORKLIFT OPERATOR X MATERIAL HOIST OPERATOR X PERSONNEL OPERATOR X FIXED CRANE OPERATOR X TRAVEL CRANE OPERATOR X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: TEMPORARY HEATING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK REMOVE SNOW AND ICE (AS REQUIRED) X TEMPORARY ENCLOSURES (AS REQUIRED) X PIPING COST IN BUILDING (AS REQUIRED) X FUEL COST FOR HEATING (AS REQUIRED) X POWER COST FOR HEATING (AS REQUIRED) X FURNACE RENTAL (AS REQUIRED) X HEATER RENTAL (AS REQUIRED) X BOILER RENTAL (AS REQUIRED) X OPERATOR - TEMPORARY SYSTEMS (AS REQUIRED) X OPERATION FIRE WATCH (AS REQUIRED) X CLEANING COST (AS REQUIRED) X MAINTENANCE COST (AS REQUIRED) X EXTENDED WARRANTY COST (AS REQUIRED) X FILTER CHANGE (AS REQUIRED) X TEMPORARY OFFICE HEATING (AS REQUIRED) X TEMP WEATHER PROTECTION & HEATING FOR SUBCONTRACTORS (AS REQ’D) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: REPRODUCTION/PRINTING AND DATA PROCESSING PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK COST STUDY DOCUMENTS X SYSTEMS STUDY DOCUMENTS X BID PACKAGE SETS (Form SBP-6.13SEE PARAGRAPH 3.5.9) ADVERTISEMENT X BIDDING INSTRUCTIONS X CONSTRUCTION DOCUMENTS ORIGINAL X POSTAGE AND EXPRESS COSTS (CM/GC ISSUES PLANS) X AS-BUILT SUB-DOCUMENTS X AS-BUILT DOCUMENTS X ACCOUNTING FORMS X FIELD REPORTING FORMS X SUBCONTRACT AGREEMENT FORMS X SCHEDULE REPORT FORMS X ESTIMATING FORMS X COST REPORTING FORMS X VALUE ANALYSIS STUDIES PRINTING X DATA PROCESSING (MAIN OFFICE) X REFERENCE MATERIALS X SHOP DRAWING PRINTING X ON-SITE FAX AND COPIER X DATA PROCESSING (ON-SITE) X MAINTENANCE MANUALS (FROM SUBS) AND OPERATIONS MANUALS (FROM SUBS) X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: QUALITY CONTROL PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK FIELD INSPECTOR (AS REQUIRED) X INSPECTORS’ OFFICE (AS REQUIRED) X INSPECTORS’ TRANSPORTATION (AS REQUIRED) X INSPECTORS’ EQUIPMENT (AS REQUIRED) X SPECIAL INSPECTION CONSULTANTS X SPECIAL TESTING CONSULTANTS X CONCRETE SUBSTRUCTURE-OBSERVATIONS X CONCRETE TESTING X MASONRY TESTING X COMPACTION TESTING X WELDING TESTING X PIER INSPECTION/TESTING X SOILS INVESTIGATION X SPECIAL TESTING SERVICES (EXCEPT AS NOTED) X PROJECT PHOTOGRAPHS X WARRANTY INSPECTIONS / REWORK 1 2 AIR AND WATER BALANCING X OPERATOR ON-SITE TRAINING X PREPARE OPERATION/MAINTENANCE MANUALS 2 1 Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: PERMITS AND SPECIAL FEES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK STORAGE YARD RENTAL X PARKING LOT RENTALS AND SHUTTLE EXPENSES (AS REQUIRED) 2 1 FIELD OFFICE STAFF PARKING FEES X SIGN PERMITS X STREET/CURB PERMIT X BUILDING PERMITS X PLAN CHECK FEES X WATER SYSTEM DEV. FEE X SEWER USE & DRAINAGE PERMIT/DEV. FEE X STORM CONNECTION FEE X GAS AND POWER SERVICE CHARGE (PERMANENT) X GAS AND POWER SERVICE CHARGE (TEMPORARY) X STEAM SERVICE CHARGE X CHILLER WATER SERVICE CHARGE X SPECIAL TAP FEES X CONTRACTORS LICENSES X CONSTRUCTION EQUIPMENT LICENSES X CONSTRUCTION EQUIPMENT PERMITS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: INSURANCE AND BONDS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK BUILDERS RISK INSURANCE X GENERAL LIABILITY, INCLUDING AUTOMOBILE X PRODUCT LIABILITY X EXCESS LIABILITY COVERAGE X WORKERS COMPENSATION (FIELD OFFICE STAFF) X FICA INSURANCE (FIELD OFFICE STAFF) X FEDERAL UNEMPLOYMENT (FIELD OFFICE STAFF) X STATE UNEMPLOYMENT (FIELD OFFICE STAFF) X CONSTRUCTION MANAGER’S PAYMENT BOND X CONSTRUCTION MANAGER’S PERFORMANCE BOND X STATE/LOCAL BONDS X * SUBCONTRACTOR BONDS X Responsibility: x = Total 1 = Primary 2 = Secondary * ONLY AS MUTUALLY AGREED UPON BETWEEN THE PRINCIPAL REPRESENTATIVE AND THE CONSTRUCTION MANAGER. PHASE: OTHER COSTS PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CONSTRUCTION EQUIPMENT X CONSTRUCTION SERVICES LABOR X CONSTRUCTION MATERIALS X COST OF DESIGN AND ENGINEERING X A/E FAST TRACK COST EXTRAS X PRELIMINARY SOILS INVESTIGATION X TITLE/DEVELOPMENT COST X BUILDING OPERATION AFTER MOVE-IN X BUILDING MAINTENANCE AFTER MOVE-IN X MOVING COORDINATION X MOVING COSTS X COSTS OF EMERGENCY WORK X CONSTRUCTION MANAGER GENERAL OVERHEAD COST X CONSTRUCTION MANAGER PROFIT MARGIN X GMP FINANCIAL RESPONSIBILITIES X STATE REQUIRED INSPECTIONS X Responsibility: x = Total 1 = Primary 2 = Secondary PHASE: OFF-SITE SERVICES PRE- CONST SVCS FEE CONST SVCS FEE GEN CONDS. DIRECT COST OF WORK CORPORATE EXECUTIVES (AS REQUIRED) X X PRINCIPAL IN CHARGE (AS REQUIRED) X X PROJECT EXECUTIVE (AS REQUIRED) X X LEGAL - BASIC SERVICES (AS REQUIRED) X X ACCOUNTING (AS REQUIRED) X PURCHASING (AS REQUIRED) X SAFETY OFFICER (AS REQUIRED) X EEO OFFICER (AS REQUIRED) X X SECRETARIAL AND CLERK-TYPIST (AS REQUIRED) X X BENEFITS AND VACATIONS FOR BID ADDENDA‌‌ ABOVE X X STAFF BONUSES X Responsibility: x = Total 1 = Primary 2 = Secondary STATE OF COLORADO‌ OFFICE OF THE COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE ARCHITECT STATE BUILDINGS PROGRAMS BID Institution/AgencyFORM SC-6.5) I hereby certify: Colorado Department That I am the ______________________________________ and duly authorized representative of Transportation Project No./Namethe firm of: 23332/Glenwood Springs 11 Bay VSF, Communications Bldg & Site Work Bidder Acknowledges Receipt of Addenda Numbers: Bidder Anticipates Services outside and That the United States or Colorado:* No Yes If Yes see 3A below Bidder will comply with 80% Colorado Labor on project above $500,000: Yes No If No see 3B below Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes If Yes see 3C below Base Bid $ (Refer wage rates and other factual unit costs supporting the compensation to Bid Alternate Form SC-6.13.1 Attached, If Applicable) Bidder’s Time of Completion a. Time Period from Notice to Proceed to Substantial Completion: b. Time Period from Substantial Completion to Final Acceptance: c. Total Time of Completion of Entire Project (a + b): 1. BID: Pursuant to the advertisement be paid by the State for these professional services and other services are accurate, complete, and current; and That I understand the original contract price and any additions shall be adjusted to exclude any significant sums by which the State determines the contract price had been increased due to inaccurate, incomplete, or non-current wage rates and other factual unit costs; and That all such contract adjustments shall be made within one year following the end of Colorado dated this contract. CONSTRUCTION MANAGER Signature STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (attached) CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) D.1 Construction Manager’s Fee Proposal D.2 Certificate and Affidavit Regarding Unauthorized Immigrants D.3 Construction Manager’s Certificate of Liability Insurance XXXXX XX XXXXXXXX CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved by the undersigned bidder hereby proposes Principal Representative and prior to furnish all bidding) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) (when approved by the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Principal Representative) STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) FIRST AMENDMENT (INCORPORATING GMP) EXHIBITS H.1 Guaranteed Maximum Price Documents, Drawings, and Specifications including Addenda and Modifications (when approved by the Principal Representative) H.2 Schedule of Bid Package Descriptions and Issuance Dates H.2 Schedule of Values H.4 Allowance Schedule H.5 Critical Path Method (CPM) Construction Schedule STATE OF COLORADO CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) AGREEMENT (STATE FORM SC-6.5) SECOND AND SUBSEQUENT AMENDMENT (INCORPORATING BID PACKAGES) EXHIBITS I.1 Contract Document Drawings and SpecificationsSpecifications (when approved by the Principal Representative) I.2 All Addenda and Modifications I.3 Schedule of Values (consistent with GMP Schedule of Values), include Labor Overhead (direct labor burdens) for the work each Subcontractor to be applied to all change orders and for the base bid indicated above. Bidders should include all taxes that are applicable.amendments; I.4 Allowance Schedule (consistent with GMP Allowance Schedule)

Appears in 1 contract

Samples: Construction Manager/General Contractor Agreement

AutoNDA by SimpleDocs

NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: Xxxxxxx XxxxxxxxXxxx Xxxxx, P.E., Chief Engineer Department of Transportation 0000 Xxxx Xxxxxx Xxxxx 5th Floor Denver, CO 80204 _ With copies to (State Buildings Program (or Delegate) State of Colorado): Xxxxxx X. Xxxxxx Department of Transportation Property Management 0000 Xxxx Xxxxxx Xxxxx 4th Floor Denver, CO 80204 ): A. Notice to Contractor: ______________________ With copies to: ______________________ ______________________ SIGNATURE APPROVALS: *Persons signing for Contractor hereby swear and affirm that they are authorized to act on Contractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted THE CONTRACTOR STATE OF COLORADO, acting by and through: Department (Insert Name & Title of Transportation Agency or IHE) By: Legal Name of Contracting Entity Xxxxxxx XxxxxxxxXxxx Xxxxx, P.E., Chief Engineer Principal Representative Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: By: Xxxxxx X. Xxxxxx Xxxxxxx Xxx, RA, Delegee Date: C.R.S. § CRS §00-00-000 requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Contractor is not authorized to begin performance until such time. If Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Contactor for such performance or for any goods and/or services provided hereunder. APPROVED: STATE OF COLORADO STATE CONTROLLER'S OFFIC E OFFICE State Controller (or authorized Delegate) STATE OF COLORADO‌ By: Xxxxxxx Xxxx, Delegee Date: (STATE FORM SC-6.21) CONTRACTOR’S BID (Form SBP-6.13) ADVERTISEMENT FOR BID ADDENDA‌‌ (STATE OF COLORADO‌ OFFICE OF THE FORM SC-6.21) PERFORMANCE BOND (Form SC-6.22) (STATE ARCHITECT FORM SC-6.21) LABOR AND MATERIAL PAYMENT BOND (Form SC-6.221) (STATE BUILDINGS PROGRAMS BID Institution/Agency: Colorado Department of Transportation Project No./Name: 23332/Glenwood Springs 11 Bay VSFFORM SC-6.21) INSURANCE CERTIFICATE(S) (attached) (STATE FORM SC-6.21) Certification and Affidavit Regarding Unauthorized Immigrants (State Form UI-1), Communications Bldg & Site Work Bidder Acknowledges Receipt of Addenda Numbers: Bidder Anticipates Services outside the United States or Colorado:* No Yes If Yes see 3A below Bidder will comply with 80% Colorado Labor on project above $500,000: Yes No If No see 3B below Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes If Yes see 3C below Base Bid $ (Refer required at contract signing prior to Bid Alternate Form SC-6.13.1 Attachedcommencing work) (STATE FORM SC-6.21) (STATE FORM SC-6.21) The Contractor shall obtain and maintain, If Applicable) Bidder’s Time of Completion a. Time Period from Notice to Proceed to Substantial Completion: b. Time Period from Substantial Completion to Final Acceptance: c. Total Time of Completion of Entire Project (a + b): 1. BID: Pursuant to the advertisement by the State of Colorado dated the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work at its own expense and for the base bid indicated aboveduration of the contract including any warranty periods under the Contract are satisfied, the insurance coverages set forth below. Bidders should include all taxes By requiring such insurance, the Principal Representative shall not be deemed or construed to have assessed the risk that may be applicable to the Contractor its agents, representatives, employees or subcontractors under this contract. The insurance requirements herein for this Contract in no way limit the indemnity covenants contained in the Contract. The Principal Representative in no way warrants that the limits contained herein are applicablesufficient to protect the Contractor from liabilities that might arise out of the performance of the work under this Contract by the Contractor, its agents, representatives, employees, or subcontractors. The Contractor shall assess its own risks and if it deems appropriate and/or prudent, maintain higher limits and/or broader coverages. The Contractor is not relieved of any liability or other obligations assumed or pursuant to the Contract by reason of its failure to obtain or maintain insurance in sufficient amounts, duration, or types.

Appears in 1 contract

Samples: Contractor's Design/Bid/Build Agreement

NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: Xxxxxxx Xxxxxxxx, P.E., Chief Engineer Department of Transportation 0000 Xxxx Xxxxxx Xxxxx 5th Floor Denver, CO 80204 With copies to (State Buildings Program (or Delegate) State of Colorado): Xxxxxx X. Xxxxxx Department of Transportation Property Management 0000 Xxxx Xxxxxx Xxxxx 4th Floor Denver, CO 80204 Notice to ContractorDesign/Build Entity: With copies to: *Persons signing for Contractor Design/Build Entity hereby swear and affirm that they are authorized to act on ContractorDesign/Build Entity’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted accepted. THE CONTRACTOR DESIGN/BUILD ENTITY: STATE OF COLORADO, acting by and through: Department (Insert Name & Title of Transportation Agency or IHE) By: Legal Name of Contracting Entity Xxxxxxx Xxxxxxxx, P.E., Chief Engineer (Insert Name & Title of Principal Representative for Agency or IHE) Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By By: STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: By: Xxxxxx X. Xxxxxx (Insert Name of Authorized Individual) Date: APPROVED DEPARTMENT OF LAW Attorney General (or authorized Delegate) By: (Insert Name of Authorized Individual) Date: C.R.S. § 00-00-000 requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Contractor Design/Build Entity is not authorized to begin performance until such time. If Contractor Design/Build Entity begins performing prior thereto, the State of Colorado is not obligated to pay Contactor Design/Build Entity for such performance or for any goods and/or services provided hereunder. STATE OF COLORADO STATE CONTROLLER'S OFFIC E OFFICE State Controller (or authorized Delegate) STATE OF COLORADO‌ By: (Insert Name of Authorized Individual) Date: (STATE FORM SC-6.21SC-8.0) CONTRACTOR’S BID (Form SBP-6.13STATE FORM SC-8.0) ADVERTISEMENT FOR BID ADDENDA‌‌ (STATE FORM SC-8.0) (STATE FORM SC-8.0) (STATE FORM SC-8.0) STATE OF COLORADO‌ COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS BID Institution/Agency: Colorado Department PROGRAM PERFORMANCE BOND That the Contractor as Principal and hereinafter called “Principal,” and as Surety and hereinafter called “Surety,” a corporation organized and existing under the laws of Transportation Project No./Name: 23332/Glenwood Springs 11 Bay VSFare held and firmly bound unto the STATE OF COLORADO acting by and through (AGENCY OR INSTITUTION) hereinafter called the “Principal Representative”, Communications Bldg & Site Work Bidder Acknowledges Receipt in the sum of Addenda Numbers: Bidder Anticipates Services outside the United States or Colorado:* No Yes If Yes see 3A below Bidder will comply with 80% Colorado Labor on project above $500,000: Yes No If No see 3B below Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes If Yes see 3C below Base Bid Dollars ($ (Refer to Bid Alternate Form SC-6.13.1 Attached, If Applicable) Bidder’s Time of Completion a. Time Period from Notice to Proceed to Substantial Completion: b. Time Period from Substantial Completion to Final Acceptance: c. Total Time of Completion of Entire Project (a + b): 1. BID: Pursuant to the advertisement by the State of Colorado dated the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete payment whereof the Principal and prompt execution of everything described or shown in or reasonably implied from the Bidding DocumentsSurety bind themselves, including the Drawings their heirs, executors, administrators, successors and Specificationsassigns, for the work jointly and for the base bid indicated above. Bidders should include all taxes that are applicableseverally, firmly, by these presents.

Appears in 1 contract

Samples: Design/Build Lump Sum Agreement

NOTICE IDENTIFICATION. All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing. Notice to Principal Representative: Xxxxxxx Xxxxxxxx, P.E., Chief Engineer Department of Transportation 0000 Xxxx Xxxxxx Xxxxx 5th Floor Denver, CO 80204 With copies to (State Buildings Program (or Delegate) State of Colorado): Xxxxxx X. Xxxxxx Department of Transportation Property Management 0000 Xxxx Xxxxxx Xxxxx 4th Floor Denver, CO 80204 Notice to Contractor: With copies to: File *Persons signing for Contractor hereby swear and affirm that they are authorized to act on Contractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted THE CONTRACTOR STATE OF COLORADO, acting by and through: Department (Insert Name of Transportation Agency or IHE) By: Legal Name of Contracting Entity Xxxxxxx Xxxxxxxx, P.E., Chief Engineer (Insert Name & Title of Principal Representative for Agency or IHE) Date: *Signature APPROVED DEPARTMENT OF PERSONNEL & ADMINISTRATION By STATE BUILDINGS PROGRAM Name (print) Title State Architect (or authorized Delegate) Date: By: Xxxxxx X. Xxxxxx (Insert Name of Authorized Individual) Date: C.R.S. § 00-00-000 requires the State Controller to approve all State Contracts. This Contract is not valid until signed and dated below by the State Controller or delegate. Contractor is not authorized to begin performance until such time. If Contractor begins performing prior thereto, the State of Colorado is not obligated to pay Contactor for such performance or for any goods and/or services provided hereunder. STATE OF COLORADO STATE CONTROLLER'S OFFIC E State Controller (or authorized Delegate) STATE OF COLORADO‌ (STATE FORM SC-6.21) CONTRACTOR’S BID (Form SBP-6.13) ADVERTISEMENT FOR BID ADDENDA‌‌ STATE OF COLORADO‌ OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS BID Institution/Agency: Colorado Department of Transportation Project No./Name: 23332/Glenwood Springs 11 Bay VSF, Communications Bldg & Site Work Bidder Acknowledges Receipt of Addenda Numbers: Bidder Anticipates Services outside the United States or Colorado:* No Yes If Yes see 3A below Bidder will comply with 80% Colorado Labor on project above $500,000: Yes No If No see 3B below Bidder is a Service-Disabled Veteran Owned Small Business:* No Yes If Yes see 3C below Base Bid $ (Refer to Bid Alternate Form SC-6.13.1 Attached, If Applicable) Bidder’s Time of Completion a. Time Period from Notice to Proceed to Substantial Completion: b. Time Period from Substantial Completion to Final Acceptance: c. Total Time of Completion of Entire Project (a + b): 1. BID: Pursuant to the advertisement by the State of Colorado dated the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.

Appears in 1 contract

Samples: Contractor's Design/Bid/Build Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!