Common use of Occupational Health, Safety, and Environment Plan Clause in Contracts

Occupational Health, Safety, and Environment Plan. Prior to the beginning of its activity, the SUPPLIER must prepare a written report in which the working and environmental risks for each activity to be developed are assessed (Risk Scenario or Risk Assessment). On the basis of said report, the SUPPLIER must prepare and put into operation the Occupational Health, Safety, and Environment Plan, which consists in a document that details the possible risks and measures to prevent, mitigate, or eliminate the risks during the provision of the contracted service, with the corresponding schedule of activities which shall be carried out in its workplace. This document must be revised and approved by ENEL prior to its implementation. Once ENEL has approved the Occupational Health, Safety, and Environment Plan, all the measures and activities included therein must be carried out. In order to guarantee the fulfilment and supervision of said Plan, the SUPPLIER must appoint personnel for this purpose. Said personnel must be approved by ENEL taking into consideration the competency required for performing the functions included in the Plan. Prior to the beginning of the works, the SUPPLIER shall notify ENEL the name of the person in charge of Safety and Environment. In case there are changes during the period of validity of this Contract, they shall be immediately notified to ENEL. For its part, ENEL shall appoint a person from the company as a contact person for issues on Safety and Environment. The costs arising from the implementation of the Occupational Health, Safety, and Environment Plan, as well as the risk attention for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER when the offer was presented, consequently, ENEL shall not recognise any additional value for this concept. The SUPPLIER'S obligations, duties, and responsibilities shall not be excluded or limited in any way by the fact that ENEL is aware of this document o any other information contained therein.

Appears in 4 contracts

Samples: Annex Xiv Guatemala, globalprocurement.enel.com, globalprocurement.enel.com

AutoNDA by SimpleDocs

Occupational Health, Safety, and Environment Plan. Prior to the beginning of its activity, the SUPPLIER must prepare a written report in which the working and environmental risks for each activity to be developed are assessed (Risk Scenario or Risk Assessment). On the basis of said report, the SUPPLIER must prepare and put into operation the Occupational Health, Safety, and Environment Plan, which consists in a document that details the possible risks and measures to prevent, mitigate, or eliminate the risks during the provision of the contracted service, with the corresponding schedule of activities which shall be carried out in its workplace. This document must be revised and approved by ENEL prior to its implementation. Once ENEL has approved the Occupational Health, Safety, and Environment Plan, all the measures and activities included therein must be carried out. In order to guarantee the fulfilment and supervision of said Plan, the SUPPLIER must appoint personnel for this purpose. Said personnel must be approved by ENEL taking into consideration the competency required for performing the functions included in the Plan. Prior to The SUPPLIER shall notify ENEL, before the beginning of the works, the SUPPLIER shall notify ENEL the name of the person Safety and Environment Supervisors (Technicians and Supervisor) and the persons in charge of Safety and Environmentfirst aid. In case there are changes during the period of validity of this Contract, they shall be immediately notified to ENEL. For its part, ENEL shall appoint designate a person from the company as a contact person for issues on Safety and EnvironmentEnvironment and/or shall appoint a Safety and Environment Coordinator. The costs arising from the implementation of the Occupational Health, Safety, and Environment Plan, as well as the risk attention for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER when the offer was presented, consequently, ENEL shall not recognise any additional value for this concept. The SUPPLIER'S obligations, duties, and responsibilities shall not be excluded or limited in any way by the fact that ENEL is aware of this document o any other information contained therein.

Appears in 4 contracts

Samples: Annex Xiv Guatemala, globalprocurement.enel.com, globalprocurement.enel.com

Occupational Health, Safety, and Environment Plan. Prior to the beginning of its activity, the SUPPLIER Contractor must prepare a written report in which the working and environmental risks for each activity to be developed are assessed (Risk Scenario or Risk Assessment). On the basis of said report, the SUPPLIER Contractor must prepare and put into operation the Occupational Health, Safety, and Environment Plan, which consists in a document that details the possible risks and measures to prevent, mitigate, or eliminate the risks during the provision of the contracted service, with the corresponding schedule of activities which shall be carried out in its workplace. This document must be revised and approved by ENEL prior to its implementation. Once ENEL has approved the Occupational Health, Safety, and Environment Plan, all the measures and activities included therein must be carried out. In order to guarantee the fulfilment and supervision of said Plan, the SUPPLIER Contractor must appoint personnel for this purpose. Said personnel must be approved by ENEL taking into consideration the competency required for performing the functions included in the Plan. Prior to The Contractor shall notify ENEL, before the beginning of the works, the SUPPLIER shall notify ENEL the name of the person Safety and Environment Supervisors (Technicians and Supervisor) and the persons in charge of Safety and Environmentfirst aid. In case there are changes during the period of validity of this Contract, they shall be immediately notified to ENEL. For its part, ENEL shall appoint designate a person from the company as a contact person for issues on Safety and EnvironmentEnvironment and/or shall appoint a Safety and Environment Coordinator. The costs arising from the implementation of the Occupational Health, Safety, and Environment Plan, as well as the risk attention for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER Contractor when the offer was presented, consequently, ENEL shall not recognise any additional value for this concept. The SUPPLIER'S Contractor 's obligations, duties, and responsibilities shall not be excluded or limited in any way by the fact that ENEL is aware of this document o any other information contained therein.

Appears in 2 contracts

Samples: globalprocurement.enel.com, globalprocurement.enel.com

Occupational Health, Safety, and Environment Plan. Prior to the beginning of its activity, the SUPPLIER Contractor must prepare a written report in which the working and environmental risks for each activity to be developed are assessed (Risk Scenario or Risk Assessment). On the basis of said report, the SUPPLIER Contractor must prepare and put into operation the Occupational Health, Safety, and Environment Plan, which consists in a document that details the possible risks and measures to prevent, mitigate, or eliminate the risks during the provision of the contracted service, with the corresponding schedule of activities which shall be carried out in its workplace. This document must be revised and approved by ENEL prior to its implementation. Once ENEL has approved the Occupational Health, Safety, and Environment Plan, all the measures and activities included therein must be carried out. In order to guarantee the fulfilment and supervision of said Plan, the SUPPLIER Contractor must appoint personnel for this purpose. Said personnel must be approved by ENEL taking into consideration the competency required for performing the functions included in the Plan. Prior to the beginning of the works, the SUPPLIER Contractor shall notify ENEL the name of the person in charge of Safety and Environment. In case there are changes during the period of validity of this Contract, they shall be immediately notified to ENEL. For its part, ENEL shall appoint a person from the company as a contact person for issues on Safety and Environment. The costs arising from the implementation of the Occupational Health, Safety, and Environment Plan, as well as the risk attention for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER Contractor when the offer was presented, consequently, ENEL shall not recognise any additional value for this concept. The SUPPLIER'S Contractor 's obligations, duties, and responsibilities shall not be excluded or limited in any way by the fact that ENEL is aware of this document o any other information contained therein.

Appears in 2 contracts

Samples: globalprocurement.enel.com, globalprocurement.enel.com

Occupational Health, Safety, and Environment Plan. Prior The Supplier prior to starting its activity shall have the beginning of its activity, the SUPPLIER must obligation to prepare a written report in which the working occupational and environmental risks for each must be analysed by activity to be developed are assessed (Risk Scenario Overview or Risk Assessment). On the basis of said report) and, the SUPPLIER must based on this, prepare and put into operation the Occupational Health, Safety, Safety and Environment Plan, which consists in of a document that details the detailing any possible risks and the measures to prevent, mitigate, mitigate or eliminate the risks during the provision development of the contracted service, with the corresponding schedule of activities which shall that must be carried out in at its workplace. This document must be revised reviewed and approved by ENEL prior to its implementationimplementati on. Once approved by ENEL has approved the Occupational Health, Safety, Safety and Environment Plan, all the measures and activities included therein in this document must be carried out. In order to guarantee the fulfilment To ensure compliance and supervision of said the aforementioned Plan, the SUPPLIER Supplier must appoint personnel for this purpose. Said , said personnel must be approved by ENEL taking into consideration account the competency competencies that are required for performing to perform the functions included in the Plan. Prior to the beginning of the works, the SUPPLIER The Supplier shall notify ENEL ENEL, before the start of work, the name of the person in charge of responsible for Safety and the Environment. In case there are the event that changes occur during the period of validity term of this Contract, they shall must be immediately notified to ENELimmediately. For its part, ENEL shall appoint designate a person from the company as a contact person for issues on Safety and EnvironmentEnvironment issues. The costs arising from involved in the implementation of the Occupational Health, Safety, Safety and Environment Plan, as well as the risk attention of risks for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER when Supplier at the offer was presentedtime of presenting their proposal, consequently, therefore ENEL shall not recognise any additional value for this conceptitem. The SUPPLIER'S obligations, duties, and responsibilities shall fact that ENEL has knowledge of this document or of any information contained in it does not be excluded exclude or limited in any way by limit the fact that ENEL is aware obligations, duties and responsibilities of this document o any other information contained thereinthe Supplier.

Appears in 1 contract

Samples: globalprocurement.enel.com

Occupational Health, Safety, and Environment Plan. Prior to the beginning of its activity, the SUPPLIER Contractor must prepare a written report in which the working and environmental risks for each activity to be developed are assessed (Risk Scenario or Risk Assessment). On the basis of said report, the SUPPLIER Contractor must prepare and put into operation the Occupational Health, Safety, and Environment Plan, which consists in a document that details the possible risks and measures to prevent, mitigate, or eliminate the risks during the provision of the contracted service, with the corresponding schedule of activities which shall be carried out in its workplace. This document must be revised and approved by ENEL prior to its implementation. Once ENEL has approved the Occupational Health, Safety, and Environment Plan, all the measures and activities included therein must be carried out. In order to guarantee the fulfilment and supervision of said Plan, the SUPPLIER Contractor must appoint personnel for this purpose. Said personnel must be approved by ENEL taking into consideration the competency required for performing the functions included in the Plan. Prior to the beginning of the works, the SUPPLIER Contractor shall notify ENEL the name of the person in charge of Safety and Environment. In case there are changes during the period of validity of this Contract, they shall be immediately notified to ENEL. For its part, ENEL shall appoint a person from the company as a contact person for issues on Safety and Environment. The costs arising from the implementation of the Occupational Health, Safety, and Environment Plan, as well as the risk attention for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER Contractor when the offer was presented, consequently, ENEL shall not recognise any additional value for this concept. The SUPPLIER'S Contractor’s obligations, duties, and responsibilities shall not be excluded or limited in any way by the fact that ENEL is aware of this document o any other information contained therein.

Appears in 1 contract

Samples: globalprocurement.enel.com

Occupational Health, Safety, and Environment Plan. Prior to the beginning of starting its activity, the SUPPLIER must Supplier shall be obliged to prepare a written report in which analysing the working occupational and environmental risks for each activity to be developed are assessed performed (Risk Scenario Overview or Risk Assessment). On ; the basis of said report, the SUPPLIER Supplier must use this to prepare and put into operation implement the Occupational Health, Safety, Safety and Environment Plan, which consists in is a document that details the detailing any possible risks and the measures to prevent, mitigate, mitigate or eliminate the risks during the provision development of the contracted service, with the corresponding schedule of activities which shall that must be carried out in at its workplaceWork Site. This document must be revised reviewed and approved by ENEL prior to its implementation. Once ENEL has approved by ENEL, the Occupational Health, Safety, Safety and Environment Plan, and all the measures and activities included therein in this document must be carried out. In order to guarantee the fulfilment To ensure compliance and supervision of said the aforementioned Plan, the SUPPLIER Supplier must appoint personnel for this purpose. Said ; said personnel must be approved by ENEL ENEL, taking into consideration account the competency skills that are required for performing to perform the functions roles included in the Plan. Prior to Before starting the beginning of the workswork, the SUPPLIER Supplier shall notify inform ENEL of the name of the person in charge of responsible for Safety and the Environment. In case there are the event that changes occur during the period of validity term of this Contract, they shall must be immediately notified to ENELimmediately. For its part, ENEL shall appoint designate a person from the company as a contact person for issues on Safety and EnvironmentEnvironment issues. The costs arising from involved in the implementation of the Occupational Health, Safety, Safety and Environment Plan, as well as the risk attention assessment for the execution performance of the activitiesactiviti es, must have been budgeted for and included in the price established by the SUPPLIER when Supplier at the offer was presented, consequently, time of presenting their proposal. ENEL shall therefore not recognise agree to pay any additional value for amounts in this conceptregard. The SUPPLIER'S obligations, duties, and responsibilities shall fact that ENEL has knowledge of this document or of any information contained in it does not be excluded exclude or limited in any way by limit the fact that ENEL is aware obligations, duties and responsibilities of this document o any other information contained thereinthe Supplier.

Appears in 1 contract

Samples: Annex Xii Guatemala

Occupational Health, Safety, and Environment Plan. Prior to the beginning of its activity, the SUPPLIER Contractor must prepare a written report in which the working and environmental risks for each activity to be developed are assessed (Risk Scenario or Risk Assessment). On the basis of said report, the SUPPLIER Contractor must prepare and put into operation the Occupational Health, Safety, and Environment Plan, which consists in a document that details the possible risks and measures to prevent, mitigate, or eliminate the risks during the provision of the contracted service, with the corresponding schedule of activities which shall be carried out in its workplace. This document must be revised and approved by ENEL prior to its implementation. Once ENEL has approved the Occupational Health, Safety, and Environment Plan, all the measures and activities included therein must be carried out. In order to guarantee the fulfilment and supervision of said Plan, the SUPPLIER Contractor must appoint personnel for this purpose. Said personnel must be approved by ENEL taking into consideration the competency required for performing the functions included in the Plan. Prior to the beginning of the works, the SUPPLIER Contractor shall notify ENEL the name of the person in charge of Safety and Environment. In case there are changes during the period of validity of this Contract, they shall be immediately notified to ENEL. For its part, ENEL shall appoint a person from the company as a contact person for issues on Safety and Environment. The costs arising from the implementation of the Occupational Health, Safety, and Environment Plan, as well as the risk attention for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER Contractor when the offer was presented, consequently, ENEL shall not recognise any additional value for this concept. The SUPPLIER'S Contractor's obligations, duties, and responsibilities shall not be excluded or limited in any way by the fact that ENEL is aware of this document o any other information contained therein.

Appears in 1 contract

Samples: globalprocurement.enel.com

Occupational Health, Safety, and Environment Plan. Prior The Supplier prior to starting its activity shall have the beginning of its activity, the SUPPLIER must obligation to prepare a written report in which the working occupational and environmental risks for each must be analysed by activity to be developed are assessed (Risk Scenario Overview or Risk Assessment). On the basis of said report) and, the SUPPLIER must based on this, prepare and put into operation the Occupational Health, Safety, Safety and Environment Plan, which consists in of a document that details the detailing any possible risks and the measures to prevent, mitigate, mitigate or eliminate the risks during the provision development of the contracted service, with the corresponding schedule of activities which shall that must be carried out in at its workplace. This document must be revised reviewed and approved by ENEL prior to its implementation. Once approved by ENEL has approved the Occupational Health, Safety, Safety and Environment Plan, all the measures and activities included therein in this document must be carried out. In order to guarantee the fulfilment To ensure compliance and supervision of said the aforementioned Plan, the SUPPLIER Supplier must appoint personnel for this purpose. Said , said personnel must be approved by ENEL taking into consideration account the competency competencies that are required for performing to perform the functions included in the Plan. Prior to The Supplier shall notify ENEL, before the beginning start of the workswork, the SUPPLIER shall notify ENEL the name of the person Safety and Environment Managers (Technicians and Supervisor) and the people in charge of Safety and Environmentthe first aid. In case there are the event that changes occur during the period of validity term of this Contract, they shall must be immediately notified to ENELimmediately. For its part, ENEL shall appoint designate a person from the company as a contact person for issues on Safety and EnvironmentEnvironment issues and/or appoint a Safety and Environment Coordinator. The costs arising from involved in the implementation of the Occupational Health, Safety, Safety and Environment Plan, as well as the risk attention of risks for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER when Supplier at the offer was presentedtime of presenting their proposal, consequently, therefore ENEL shall not recognise any additional value for this conceptitem. The SUPPLIER'S obligations, duties, and responsibilities shall fact that ENEL has knowledge of this document or of any information contained in it does not be excluded exclude or limited in any way by limit the fact that ENEL is aware obligations, duties and responsibilities of this document o any other information contained thereinthe Supplier.

Appears in 1 contract

Samples: globalprocurement.enel.com

AutoNDA by SimpleDocs

Occupational Health, Safety, and Environment Plan. Prior The Supplier prior to starting its activity shall have the beginning of its activity, the SUPPLIER must obligation to prepare a written report in which the working occupational and environmental risks for each must be analysed by activity to be developed are assessed (Risk Scenario Overview or Risk Assessment). On the basis of said report) and, the SUPPLIER must based on this, prepare and put into operation the Occupational Health, Safety, Safety and Environment Plan, which consists in of a document that details the detailing any possible risks and the measures to prevent, mitigate, mitigate or eliminate the risks during the provision development of the contracted service, with the corresponding schedule of activities which shall that must be carried out in at its workplace. This document must be revised reviewed and approved by ENEL prior to its implementation. Once approved by ENEL has approved the Occupational Health, Safety, Safety and Environment Plan, all the measures and activities included therein in this document must be carried out. In order to guarantee the fulfilment To ensure compliance and supervision of said the aforementioned Plan, the SUPPLIER Supplier must appoint personnel for this purpose. Said , said personnel must be approved by ENEL taking into consideration account the competency competencies that are required for performing to perform the functions included in the Plan. Prior to the beginning of the works, the SUPPLIER The Supplier shall notify ENEL ENEL, before the start of work, the name of the person in charge of responsible for Safety and the Environment. In case there are the event that changes occur during the period of validity term of this Contract, they shall must be immediately notified to ENELimmediately. For its part, ENEL shall appoint designate a person from the company as a contact person for issues on Safety and EnvironmentEnvironment issues. The costs arising from involved in the implementation of the Occupational Health, Safety, Safety and Environment Plan, as well as the risk attention of risks for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER when Supplier at the offer was presentedtime of presenting their proposal, consequently, therefore ENEL shall not recognise any additional value for this conceptitem. The SUPPLIER'S obligations, duties, and responsibilities shall fact that ENEL has knowledge of this document or of any information contained in it does not be excluded exclude or limited in any way by limit the fact that ENEL is aware obligations, duties and responsibilities of this document o any other information contained thereinthe Supplier.

Appears in 1 contract

Samples: globalprocurement.enel.com

Occupational Health, Safety, and Environment Plan. Prior The Supplier prior to starting its activity shall have the beginning of its activity, the SUPPLIER must obligation to prepare a written report in which the working occupational and environmental risks for each must be analysed by activity to be developed are assessed (Risk Scenario Overview or Risk Assessment). On the basis of said report) and, the SUPPLIER must based on this, prepare and put into operation the Occupational HealthHealth , Safety, Safety and Environment Plan, which consists in of a document that details the detailing any possible risks and the measures to prevent, mitigate, mitigate or eliminate the risks during the provision development of the contracted service, with the corresponding schedule of activities which shall that must be carried out in at its workplace. This document must be revised reviewed and approved by ENEL prior to its implementation. Once approved by ENEL has approved the Occupational Health, Safety, Safety and Environment Plan, all the measures and activities included therein in this document must be carried out. In order to guarantee the fulfilment To ensure compliance and supervision of said the aforementioned Plan, the SUPPLIER Supplier must appoint personnel for this purpose. Said , said personnel must be approved by ENEL taking into consideration account the competency competencies that are required for performing to perform the functions included in the Plan. Prior to The Supplier shall notify ENEL, before the beginning start of the workswork, the SUPPLIER shall notify ENEL the name of the person Safety and Environment Managers (Technicians and Supervisor) and the people in charge of Safety and Environmentthe first aid. In case there are the event that changes occur during the period of validity term of this Contract, they shall must be immediately notified to ENELimmediately. For its part, ENEL shall appoint designate a person from the company as a contact person for issues on Safety and EnvironmentEnvironment issues and/or appoint a Safety and Environment Coordinator. The costs arising from involved in the implementation of the Occupational Health, Safety, Safety and Environment Plan, as well as the risk attention of risks for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER when Supplier at the offer was presentedtime of presenting their proposal, consequently, therefore ENEL shall not recognise any additional value for this conceptitem. The SUPPLIER'S obligations, duties, and responsibilities shall fact that ENEL has knowledge of this document or of any information contained in it does not be excluded exclude or limited in any way by limit the fact that ENEL is aware obligations, duties and responsibilities of this document o any other information contained thereinthe Supplier.

Appears in 1 contract

Samples: globalprocurement.enel.com

Occupational Health, Safety, and Environment Plan. Prior to the beginning of its activity, the SUPPLIER Contractor must prepare a written report in which the working and environmental risks for each activity to be developed are assessed (Risk Scenario or Risk Assessment). On the basis of said report, the SUPPLIER Contractor must prepare and put into operation the Occupational Health, Safety, and Environment Plan, which consists in a document that details the possible risks and measures to prevent, mitigate, or eliminate the risks during the provision of the contracted service, with the corresponding schedule of activities which shall be carried out in its workplace. This document must be revised and approved by ENEL prior to its implementation. Once ENEL has approved the Occupational Health, Safety, and Environment Plan, all the measures and activities included therein must be carried out. In order to guarantee the fulfilment and supervision of said Plan, the SUPPLIER Contractor must appoint personnel for this purpose. Said personnel must be approved by ENEL taking into consideration the competency required for performing the functions included in the Plan. Prior to The Contractor shall notify ENEL, before the beginning of the works, the SUPPLIER shall notify ENEL the name of the person Safety and Environment Supervisors (Technicians and Supervisor) and the persons in charge of Safety and Environmentfirst aid. In case there are changes during the period of validity of this Contract, they shall be immediately notified to ENEL. For its part, ENEL shall appoint designate a person from the company as a contact person for issues on Safety and EnvironmentEnvironment and/or shall appoint a Safety and Environment Coordinator. The costs arising from the implementation of the Occupational Health, Safety, and Environment Plan, as well as the risk attention for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER Contractor when the offer was presented, consequently, ENEL shall not recognise any additional value for this concept. The SUPPLIER'S Contractor's obligations, duties, and responsibilities shall not be excluded or limited in any way by the fact that ENEL is aware of this document o any other information contained therein.

Appears in 1 contract

Samples: globalprocurement.enel.com

Occupational Health, Safety, and Environment Plan. Prior to the beginning of its activity, the SUPPLIER Contractor must prepare a written report in which the working and environmental risks for each activity to be developed are assessed (Risk Scenario or Risk Assessment). On the basis of said report, the SUPPLIER Contractor must prepare and put into operation the Occupational Health, Safety, and Environment Plan, which consists in a document that details the possible risks and measures to prevent, mitigate, or eliminate the risks during the provision of the contracted service, with the corresponding schedule of activities which shall be carried out in its workplace. This document must be revised and approved by ENEL prior to its implementation. Once ENEL has approved the Occupational Health, Safety, and Environment Plan, all the measures and activities included therein must be carried out. In order to guarantee the fulfilment and supervision of said Plan, the SUPPLIER Contractor must appoint personnel for this purpose. Said personnel must be approved by ENEL taking into consideration the competency required for performing the functions included in the Plan. Prior to The Contractor shall notify ENEL, before the beginning of the works, the SUPPLIER shall notify ENEL the name of the person Safety and Environment Supervisors (Technicians and Supervisor) and the persons in charge of Safety and Environmentfirst aid. In case there are changes during the period of validity of this Contract, they shall be immediately notified to ENEL. For its part, ENEL shall appoint designate a person from the company as a contact person for issues on Safety and EnvironmentEnvironment and/or shall appoint a Safety and Environment Coordinator. The costs arising from the implementation of the Occupational Health, Safety, and Environment Plan, as well as the risk attention for the execution of the activities, must have been budgeted and included in the price established by the SUPPLIER Contractor when the offer was presented, consequently, ENEL shall not recognise any additional value for this concept. The SUPPLIER'S Contractor’s obligations, duties, and responsibilities shall not be excluded or limited in any way by the fact that ENEL is aware of this document o any other information contained therein.

Appears in 1 contract

Samples: globalprocurement.enel.com

Occupational Health, Safety, and Environment Plan. Prior to the beginning of starting its activity, the SUPPLIER must Supplier shall be obliged to prepare a written report in which analysing the working occupational and environmental risks for each activity to be developed are assessed performed (Risk Scenario Overview or Risk Assessment). On ; the basis of said report, the SUPPLIER Supplier must use this to prepare and put into operation implement the Occupational Health, Safety, Safety and Environment Plan, which consists in is a document that details the detailing any possible risks and the measures to prevent, mitigate, mitigate or eliminate the risks during the provision development of the contracted service, with the corresponding schedule of activities which shall that must be carried out in at its workplaceWork Site. This document must be revised reviewed and approved by ENEL prior to its implementation. Once ENEL has approved by ENEL, the Occupational Health, Safety, Safety and Environment Plan, and all the measures and activities included therein in this document must be carried out. In order to guarantee the fulfilment To ensure compliance and supervision of said the aforementioned Plan, the SUPPLIER Supplier must appoint personnel for this purpose. Said ; said personnel must be approved by ENEL ENEL, taking into consideration account the competency skills that are required for performing to perform the functions roles included in the Plan. Prior to The Supplier shall notify ENEL, before the beginning start of the workswork, the SUPPLIER shall notify ENEL of the name of the person in charge of Safety and EnvironmentEnvironment Managers (Technicians and Supervisor) and the first-aiders. In case there are the event that changes occur during the period of validity term of this Contract, they shall must be immediately notified to ENELimmediately. For its part, ENEL shall appoint designate a person from the th e company as a contact person for issues on Safety and EnvironmentEnvironmental issues and/or appoint a Safety and Environment Coordinator. The costs arising from involved in the implementation of the Occupational Health, Safety, Safety and Environment Plan, as well as the risk attention assessment for the execution performance of the activities, must have been budgeted for and included in the price established by the SUPPLIER when Supplier at the offer was presented, consequently, time of presenting their proposal. ENEL shall therefore not recognise agree to pay any additional value for amounts in this conceptregard. The SUPPLIER'S obligations, duties, and responsibilities shall fact that ENEL has knowledge of this document or of any information contained in it does not be excluded exclude or limited in any way by limit the fact that ENEL is aware obligations, duties and responsibilities of this document o any other information contained thereinthe Supplier.

Appears in 1 contract

Samples: Annex Xii Guatemala

Time is Money Join Law Insider Premium to draft better contracts faster.