Offset Antenna Sample Clauses

Offset Antenna. Effective Diameter mm 530x610 -------------------------------------------------------------------------------- Input frequencies GHz from 10.7 to 12.75 -------------------------------------------------------------------------------- Polarization horizontal and vertical -------------------------------------------------------------------------------- Gain*: -------------------------------------------------------------------------------- 11.7 dBi 34.5 -------------------------------------------------------------------------------- 12.5 dBi 35.0 -------------------------------------------------------------------------------- half power Beamwidth deg.
AutoNDA by SimpleDocs

Related to Offset Antenna

  • SINGLE-USE PRODUCTS The Board of County Commissioners has established a single-use products and plastic bags policy intended to reduce the use of products which have become globally recognized as having lasting negative impacts on the environment. Neither single-use products nor plastic bags may be sold or disbursed on County property by staff or contracted vendors, except as set forth in Orange County Administrative Regulation 9.01.03. Failure to comply with the Regulation may result in termination of the contract or other contractual remedies, and may affect future contracting with the County. The use of reusable, recyclable, biodegradable, or compostable materials is encouraged.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Contractor Changes The Contractor shall notify DAS in writing no later than ten (10) Days from the effective date of any change in: a. its certificate of incorporation or other organizational document; b. more than a controlling interest in the ownership of the Contractor; or c. the individual(s) in charge of the Performance. This change shall not relieve the Contractor of any responsibility for the accuracy and completeness of the Performance. DAS, after receiving written notice by the Contractor of any such change, may require such agreements, releases and other instruments evidencing, to DAS’s satisfaction, that any individuals retiring or otherwise separating from the Contractor have been compensated in full or that provision has been made for compensation in full, for all work performed under terms of the Contract. The Contractor shall deliver such documents to DAS in accordance with the terms of DAS’s written request. DAS may also require, and the Contractor shall deliver, a financial statement showing that solvency of the Contractor is maintained. The death of any Contractor Party, as applicable, shall not release the Contractor from the obligation to Perform under the Contract; the surviving Contractor Parties, as appropriate, must continue to Perform under the Contract until Performance is fully completed.

  • Xxxxxx et al Case No. 2:16-cv-10277. The Complaint, ECF No. 1, seeks declaratory and injunctive relief under the citizen-suit provision of the Safe Drinking Water Act, 42 U.S.C. § 300j-8(a);

  • BRAND NAME OR EQUALS/DEVIATIONS Unless otherwise specified, the mention of a particular manufacturer’s brand name or number in the specifications does not imply that this particular good is the only one that will be considered for purchase. This reference is intended solely to designate the type or quality of good that will be acceptable. Equal offers will be considered and must include descriptive literature and/or specifications. Failure to provide descriptive literature and/or specifications with equal offers will result in the disqualification of the bid. The determination as to whether any alternate good or service is or is not equal shall be made solely by the County and such determination shall be final and binding upon all bidders. The County reserves the right to request and review additional information to make such a determination. Although the County provides for the consideration of alternate bids, it reserves the right to make an award in the best interest of the County. Award may not necessarily be given to the lowest bid offered. The Bidder shall be responsible for reading very carefully, and understanding completely, the requirements and the specifications of the items bid upon. Unless the bid is in response to a “Brand Name or Equal” requirement, deviations from the specifications will only be considered if requested in writing prior to the date and time specified for receipt of bids. Deviations, if accepted, will be specifically addressed in writing via an addendum to this Invitation for Bids. Any goods or services that are not in compliance with the specifications will not be accepted.

  • Unbundled Digital Loops 2.3.1 BellSouth will offer Unbundled Digital Loops (UDL). UDLs are service specific, will be designed, will be provisioned with test points (where appropriate), and will come standard with OC and a DLR. The various UDLs are intended to support a specific digital transmission scheme or service. 2.3.2 BellSouth shall make available the following UDLs, subject to restrictions set forth herein:

  • WHEXXXX xs xxxx of a plan of reorganization, RESTART PARTNERS V, L.P., a Delaware Limited Partnership ("Restart V"), may acquire an ownership interest in Elsinore Corporation ("Elsinore") or the Four Queens, Inc. ("FQI");

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!