Operational Test. The purpose of this test is to ensure that volumes of usage in consecutive sequence can be extracted, distributed, and processed by U S WEST and AT&T.
Operational Test. The purpose of this test is to ensure that volumes of usage in consecutive sequence can be extracted, distributed, and processed by PACIFIC and CLEC. PACIFIC is required to provide CLEC with PACIFIC recorded, unrated intraLATA local and toll usage (as defined in Section II) for a minimum of five (5) consecutive days. CLEC will provide PACIFIC with the message validation reports associated with test usage. CLEC will rate and process the unrated intraLATA toll and local usage. CLEC will process this data to test bills. CLEC may request that the test usage contain specific usage volumes and characteristics to ensure a complete test. Specific usage volumes and characteristics will be discussed during detailed negotiations.
Operational Test. The purpose of this test is to ensure that volumes of usage in consecutive sequence can be extracted, distributed, and processed by GTE and AT&T. GTE is required to provide AT&T with GTE recorded, unrated usage (as defined in Section 2) for a minimum of five (5) consecutive days. AT&T will provide GTE with the message validation reports associated with test usage. AT&T will rate and process the unrated intraLATA toll and local usage. AT&T will process this data to test bills. AT&T may request that the test usage contain specific usage volumes and characteristics to ensure a complete test. Specific usage volumes and characteristics will be discussed during detailed negotiations. SECTION VI: POST DEPLOYMENT ACTIVITIES ----------- --------------------------
Operational Test. The parties shall conduct the operational test of the sewage treatment centre in accordance with the Sewage Treatment Technology Agreement (or the procedures and contents agreed by the relevant parties). The operational test period of the sewage treatment centre will take place within 30 days after the first payment is paid. If the operational test of the said transfer cannot be completed as outlined in the Sewage Treatment Technology Agreement within the operational test period for any reason on the part of the Vendors, the parties can extend the operational test period but for a period of no more then 30 days. If the test is unable to be completed within the extended period, the parties shall negotiate for further arrangements to be made. The operational test shall be completed within 180 days after the signing of the Agreement, save for delays caused by the Purchaser (or its newly established project company). Where the Acquisition is completed or a written waiver of the Purchaser has been obtained, the Vendors shall provide the supporting evidence in writing and issue a written notice to the Purchaser confirming that the closing arrangements of the Acquisition have been completed. The date on which such written notice is delivered to the Purchaser shall be the closing date of the Agreement (the “Closing Date”).
Operational Test. 1. Activate each remote control valve in sequence from controller. The Owner’s Representative will visually observe operation, water application patterns, and leakage. Functional test of the control system shall be performed and demonstrate that all parts of the control system function as specified or intended,
2. Replace defective remote control valve, solenoid, wiring, or appurtenance to correct operational deficiencies.
3. Replace, adjust, or move water emission devices to correct operational or coverage deficiencies.
4. Replace defective pipe, fitting, joint, valve, sprinkler, or appurtenance to correct leakage problems. Cement or caulking to seal leaks is prohibited.
5. Repeat test(s) until each lateral passes all tests. Repeat tests, replace components, and correct deficiencies at no additional cost to the Owner.
Operational Test i) The operational tests shall be performed in accordance with ASME B30.2, Testing.
Operational Test. Notify City before starting test
a) Load test (Building Load Only), until machine reaches operating water temperature, and stabilizes for a 15- minute period. * Amp per leg * Voltage per leg * Hertz * Oil temperature * Water temperature * KW meter * Fuel pressure
b) Clock Exerciser
c) Delay start
d) Delay cool down
e) Delay retransfer
Operational Test. After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation.
Operational Test. The purpose of this test is to ensure that volumes of usage in consecutive sequence can be extracted. distributed, and processed by BellSouth and MCIm.
Operational Test. Phase A shall be conducted based on conditions for flow, UV transmittance, and dose as specified, and adjusted for degradation such as equipment aging and wear, fouling and cleaning efficiency.
d. Operational Test Phase A shall be conducted during the period outlined in Section 01660. May 2017 C01025C17 ULTRAVIOLET (UV) DISINFECTION Georgetown Wet Weather Treatment Station 11301 - 9 SYSTEM EQUIPMENT INSTALLATION
e. Flow Testing: 1) The UVSS shall provide detailed testing protocol for the County’s review and approval prior to the testing. The testing protocol shall follow the NWRI guidelines, including the following: a) Testing flow conditions: peak flow (35 MGD per channel), average flow (10 MGD per
(1) Flow rate per lamp shall be based on the number of banks that would be required