OPTICAL ACCEPTANCE MEASUREMENTS Sample Clauses

OPTICAL ACCEPTANCE MEASUREMENTS. 1. All testing is performed in accordance with ITU-T G.650, Definition and Test Methods for the relevant parameters of single mode fibres. Test procedures will define required test set up, type of equipment to be used and parameters to be reported from each test. Where equipment used is subject to calibration, copies of equipment’s current calibration certificates are going to be supplied as part of the result packages. 2. The Contractor will perform tests as described in this Schedule to determine optical performance of the Dark Fibre. 3. Dark Fibre Section description The diagram below depicts a typical Dark Fibre Section identifying the Interface Points between the Contractor and the Customer. Picture 1: Interface points 4. The test results will be recorded with the notice of provision and forwarded to the Customer. The Contractor will provide the Customer with Dark Fibre product that has been prepared and tested according to guidelines as described in this Schedule and with acceptance levels as defined in the Agreement. The Dark Fibre Section parameters will be documented and handed-over to the Customer.
AutoNDA by SimpleDocs

Related to OPTICAL ACCEPTANCE MEASUREMENTS

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Measuring DNS parameters Every minute, every DNS probe will make an UDP or TCP “DNS test” to each of the public-­‐DNS registered “IP addresses” of the name servers of the domain name being monitored. If a “DNS test” result is undefined/unanswered, the tested IP will be considered unavailable from that probe until it is time to make a new test.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Performance Measurement The Uniform Guidance requires completion of OMB-approved standard information collection forms (the PPR). The form focuses on outcomes, as related to the Federal Award Performance Goals that awarding Federal agencies are required to detail in the Awards.

  • Benchmarks for Measuring Accessibility For the purposes of this Agreement, the accessibility of online content and functionality will be measured according to the W3C’s Web Content Accessibility Guidelines (WCAG) 2.0 Level AA and the Web Accessibility Initiative Accessible Rich Internet Applications Suite (WAI-ARIA) 1.0 for web content, which are incorporated by reference.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Acceptance Criteria The Services and Deliverables must meet the following acceptance criteria or the JBE may reject the applicable Services or Deliverables. The JBE may use the attached Acceptance and Signoff Form to notify Contractor of the acceptance or rejection of the Services and Deliverables. Contractor will not be paid for any rejected Services or Deliverables.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Performance Measure Grantee will adhere to the performance measures requirements documented in