INTERFACE POINTS Sample Clauses

INTERFACE POINTS. The service water terminal point is located underground at the western boundary of the site, shall be in general accordance with the following: • USS Pipe: ***** • Pipe Size: ***** nominal diameter • Pressure Class: ***** psi • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Pressure: ***** prig • Temperature: ***** • Tie-Point Coordinates: ***** SCHEDULE 1.11 Schedule 1.11 Start Up Natural Gas Interface
AutoNDA by SimpleDocs
INTERFACE POINTS. The steam tie-point is located on the pipe rack at the eastern corner of the site, shall be in general accordance with the following: • Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Insulation: ***** • Pressure: ***** • Temperature: ***** • Minimum Steam: ***** • Tie-Point Coordinates [1]: ***** [1]: Tie-points coordinates specified are located at the Provider/Off-Taker fence line. [2]: Approximate elevation subject to final pipe rack design with allowance for 18’ of nominal clearance from bottom of truss to roadway. SCHEDULE 1.11 Schedule 1.11
INTERFACE POINTS. The natural gas tie-point for start-up gas is located underground at the northern boundary of the site, shall be in general accordance with the following: • Temporary Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** (*****) ***** (*****) • Material Specification: ***** • Connection Type: ***** • Pressure: ***** (*****) ***** (*****) ***** • Temperature: ***** • Tie-Point Coordinates: ***** SCHEDULE 1.11 Schedule 1.11 Steam Interface
INTERFACE POINTS. The feedwater tie-point is located on the pipe rack at the eastern corner of the site, shall be in general accordance with the following: • Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Insulation: ***** • Pressure: ***** • Temperature: ***** • Tie-Point Coordinates [1]: ***** [1]: Tie-points coordinates specified are located at the Provider/Off-Taker fence line. [2]: Approximate elevation subject to final pipe rack design with allowance for 18’ of nominal clearance from bottom of truss to roadway. SCHEDULE 1.11 Schedule 1.11 Coke Interface
INTERFACE POINTS. The Coke tie-point is located at the #3 Transfer Tower at the northeastern boundary of the site, shall be in general accordance with the following: • Tie-Point Coordinates: ***** SCHEDULE 1.11 Schedule 3.1(b)(ii) Adjustment to Fixed Price Component Table I Fixed Price Component (Adjustment Period) Effective Date in year of Passage of Repeal of Section 199 Production Activities Deduction under the Code $***** 2009 (Adjustment Period = effective date through the remainder of the Term) $***** 2010 (Adjustment Period = effective date through the remainder of the Term) $***** 2011 (Adjustment Period = effective date through the remainder of the Term) $***** 2012 (Adjustment Period = effective date through the remainder of the Term) $***** 2013 (Adjustment Period = effective date through the remainder of the Term) $***** 2014 (Adjustment Period = effective date through the remainder of the Term) $***** 2015 (Adjustment Period = effective date through the remainder of the Term) $***** 2016 (Adjustment Period = effective date through the remainder of the Term) $***** 2017 (Adjustment Period = effective date through the remainder of the Term) $***** 2018 (Adjustment Period = effective date through the remainder of the Term) $***** 2019 (Adjustment Period = effective date through the remainder of the Term) $***** 2020 (Adjustment Period = effective date through the remainder of the Term) $***** 2021 (Adjustment Period = effective date through the remainder of the Term) $***** 2022 (Adjustment Period = effective date through the remainder of the Term) $***** 2023 (Adjustment Period = effective date through the remainder of the Term) $***** 2024 (Adjustment Period = effective date through the remainder of the Term) $***** 2025 (Adjustment Period = effective date through the remainder of the Term) $***** 2026 (Adjustment Period = effective date through the remainder of the Term) Table II Fixed Price Component (Adjustment Period) Effective Date in year subsequent to passage of Repeal of Section 199 Production Activities Deduction under the Code. $***** 2009 (Adjustment Period = effective date through the remainder of the Term) $***** 2010 (Adjustment Period = effective date through the remainder of the Term) $***** 2011 (Adjustment Period = effective date through the remainder of the Term) $***** 2012 (Adjustment Period = effective date through the remainder of the Term) $***** 2013 (Adjustment Period = effective date through the remainder of the Term) $***** 2014 (Adju...
INTERFACE POINTS. The points of interface between the Power Plant and between the Owner Provided Work, which are set forth in Section 3 of Exhibit A.
INTERFACE POINTS. The primary interface points to the switchgear compartment are: Generator power connection – end/side, non–segregated phase bus flange connection Line power connection (to step–up transformer) – top/roof, non– segregated phase bus flange connection Provision for auxiliary power tap – bottom/floor, entry through gland plate 8.3 Gas Turbine-Generator Controls and Electric Auxiliaries
AutoNDA by SimpleDocs

Related to INTERFACE POINTS

  • Interfaces Bellcore’s GR-446-CORE defines the interface between the administration system and LIDB including specific message formats. (Bellcore’s TR-NWP-000029, Section 10)

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Production Work The Company may use Outside Entities to perform production work outside the plant and its environs provided the Company demonstrates that it is utilizing plant equipment to the maximum extent consistent with equipment capability and customer requirements and the Company is making necessary capital investments to remain competitive in the steel business and is in compliance with Article Eleven, Section B (Investment Commitment).

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Engineering Services Definition: Engineering Services includes any service or creative work, the adequate performance of which requires education, training and experience in the application of special knowledge in consulting, investigating, evaluating, planning and designing, engineering principles. Engineering Services covered by the Xxxxxx Architect-Engineers Act (40 U.S.C. 1102) are not covered in the primary scope of OASIS SB. Examples: Service areas that are included under the Engineering Services discipline include, but are not limited to the following:

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Review Systems The Asset Representations Reviewer will maintain and utilize an electronic case management system to manage the Tests and provide systematic control over each step in the Review process and ensure consistency and repeatability among the Tests.

  • Components Patheon will purchase and test all Components (with the exception of Client-Supplied Components) at Patheon’s expense and as required by the Specifications.

  • Projects The Annexes attached hereto describe the specific projects and the policy reforms and other activities related thereto (each, a “Project”) that the Government will carry out, or cause to be carried out, in furtherance of this Compact to achieve the Objectives and the Compact Goal.

Time is Money Join Law Insider Premium to draft better contracts faster.