OPTICAL SPECIFICATION Sample Clauses

OPTICAL SPECIFICATION. Note 1 Refer to Figure 1. Make scans at the center of the web and (plus/minus) 100 mm from the center of the web for each QC sample pulled from a finished roll. Make all scans on the Xxxxxx Xxxxx Lambda 9 spectrophotometer equipped with an integrating sphere. Scans are to span the wavelength region between 400nm and 820 nm, with measurement every 5nm. Base all chromaticity measurements on color illuminant D65 (CIE 1931). Note 2 All reflection measurements are to be specular and made at near normal incidence. Laminate samples (coated side out) to a specially designed light trap (this is a laminate made up of .090" clear float glass, approximately 11 mm (.450") of Monsanto's black PVB and a piece of 1/8" bronze glass) using Norland type 7204 U.V. curing adhesive. Note 3 Smooth interference fringes set up by the index mis-match between the PET and hard coat using a simplified least squares procedure (from Savitzky, A. and X.X. Xxxxx: Analytical Chemistry vol. 36 no. 8, pp 1627-1639). Note 4 Determine the coating absorption using non-laminated samples. Measure coating absorption at the center of the web only for each QC sample pulled from a finished roll.
AutoNDA by SimpleDocs

Related to OPTICAL SPECIFICATION

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • Quality Specifications SANMINA-SCI shall comply with the quality specifications set forth in its Quality Manual, incorporated by reference herein, a copy of which is available from SANMINA-SCI upon request.

  • Product Specifications The Company agrees that all Products sold to Xxxx hereunder shall conform to the respective specifications set forth on Schedule A or to such other specifications as are from time to time agreed upon by the Parties.

  • Changes to Specifications All Specifications and any changes thereto agreed to by the parties from time to time shall be in writing, dated and signed by the parties. Any change to the Process shall be deemed a Specification change. No change in the Specifications shall be implemented by Catalent, whether requested by Client or requested or required by any Regulatory Authority, until the parties have agreed in writing to such change, the implementation date of such change, and any increase or decrease in costs, expenses or fees associated with such change (including any change to Unit Pricing). Catalent shall respond promptly to any request made by Client for a change in the Specifications, and both parties shall use commercially reasonable, good faith efforts to agree to the terms of such change in a timely manner. As soon as possible after a request is made for any change in Specifications, Catalent shall notify Client of the costs associated with such change and shall provide such supporting documentation as Client may reasonably require. Client shall pay all costs associated with such agreed upon changes. If there is a conflict between the terms of this Agreement and the terms of the Specifications, this Agreement shall control. Catalent reserves the right to postpone effecting changes to the Specifications until such time as the parties agree to and execute the required written amendment.

  • Specifications Shipper will ensure that all of its Products tendered at the Origin Point for transportation on the Pipeline System meet the applicable specifications for the Product as set forth in the Tariff (as defined below) (the “Specifications”).

  • Specification Changes (a) During the Term, GSK will accept a labeling change from Prometheus as contemplated by this Section 4.2 but otherwise the Parties acknowledge and agree that GSK does not intend to make any material changes (such as packaging design, manufacturing process or similar or related changes) to the existing Product during the Term.

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • Specification The Airframe shall be manufactured in accordance with the Standard Specification, as modified or varied prior to the date of this Agreement by the Specification Change Notices listed in Appendix 1 to Exhibit A.

  • Project Scope This section should contain SOW summary information including: o Project definition and expected duration o Project goals, objectives, o Priorities & expectations o Project approach & responsibilities o Overall coordination and assumptions

  • Manufacturing Services Jabil will manufacture the Product in accordance with the Specifications and any applicable Build Schedules. Jabil will reply to each proposed Build Schedule that is submitted in accordance with the terms of this Agreement by notifying Company of its acceptance or rejection within three (3) business days of receipt of any proposed Build Schedule. In the event of Jabil’s rejection of a proposed Build Schedule, Jabil’s notice of rejection will specify the basis for such rejection. When requested by Company, and subject to appropriate fee and cost adjustments, Jabil will provide Additional Services for existing or future Product manufactured by Jabil. Company shall be solely responsible for the sufficiency and adequacy of the Specifications [***].

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!