ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amended.
Appears in 18 contracts
Samples: Professional Services Contract, Professional Services Contract, Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1124 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1124.
Appears in 6 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 975; and 3) Contractor’s Response to RFB 5768, as amendedRFP 975.
Appears in 5 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1074 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1074.
Appears in 4 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1136 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1136.
Appears in 4 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1022 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1022.
Appears in 4 contracts
Samples: Professional Services Contract, Professional Services Contract, Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)5771; and 3) Contractor’s Response to RFB 5768, as amended5771.
Appears in 3 contracts
Samples: Professional Services, Professional Services Contract, Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1053 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1053.
Appears in 3 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)the Specifications; 3) Request for Bid 5717; and 34) Contractor’s Response to RFB 5768, as amendedBid 5717.
Appears in 3 contracts
Samples: Pupil Transportation Contract, Pupil Transportation Contract, Pupil Transportation Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1071 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1071.
Appears in 3 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1082 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1082.
Appears in 3 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1041 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1041.
Appears in 3 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 878; and 3) Contractor’s Response to RFB 5768, as amendedRFP 878.
Appears in 3 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 885; and 3) Contractor’s Response to RFB 5768, as amendedRFP 885.
Appears in 3 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1126 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1126.
Appears in 3 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1003 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1003.
Appears in 3 contracts
Samples: Professional Services, Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)the Specifications; 3) Request for Bid B 5735; and 34) Contractor’s Response to RFB 5768, as amendedB 5735.
Appears in 2 contracts
Samples: Busing Contract, Busing Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1125 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1125.
Appears in 2 contracts
Samples: Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 5779 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amended5779.
Appears in 2 contracts
Samples: Professional Services, Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among anong the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this ContractContract and its exhibits and addenda, if an; 2) RFB 5768 (including all exhibits and addenda)Request for Proposal 1019; and 3) Contractor’s Response to RFB 5768, as amendedRequest for Proposal 1019.
Appears in 2 contracts
Samples: Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)the Specifications; 3) RFP 879; and 34) Contractor’s Response to RFB 5768, as amendedRFP 879.
Appears in 2 contracts
Samples: Pupil Transportation Contract, Pupil Transportation Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 970 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 970 (exclusive of Tab E).
Appears in 2 contracts
Samples: Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1038 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1038.
Appears in 2 contracts
Samples: Professional Services Contract, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (RFP 986 including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 986.
Appears in 2 contracts
Samples: Professional Services Contract, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 987 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 987.
Appears in 2 contracts
Samples: Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1040 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1040.
Appears in 2 contracts
Samples: Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1052 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1052.
Appears in 2 contracts
Samples: Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1129 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1129.
Appears in 2 contracts
Samples: Professional Services, Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1010 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1010.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 929; and 3) Contractor’s Response to RFB 5768, as amendedRFP 929.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 982; and 3) Contractor’s Response to RFB 5768, as amendedRFP 982.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this ContractContract and its Exhibit A; 2) RFB 5768 (including all exhibits and addenda)RFP 876; and 34) Contractor’s Response to RFB 5768, as amendedRFP 876.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)5734; and 3) Contractor’s Response to RFB 5768, as amended5734.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 916; and 3) Contractor’s Response to RFB 5768, as amendedRFP 916.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1032 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1032.
Appears in 1 contract
Samples: Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 981 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768RFP 981, as amended.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (RFP 1000 including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1000.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 953; and 3) Contractor’s Response to RFB 5768, as amendedRFP 953.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1047 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1047.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 915; and 3) Contractor’s Response to RFB 5768, as amendedRFP 915.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1046 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1046.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1018 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1018.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 908; and 3) Contractor’s Response to RFB 5768, as amendedRFP 908.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1004 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768RFP 1004 as modified by Clarification dated June 11, as amended2019 and Amended BAFO date June 28, 2019.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (RFP 998 including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 998.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1123 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1123.
Appears in 1 contract
Samples: Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1112 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1112.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 968; and 3) Contractor’s Response to RFB 5768, as amendedRFP 968.
Appears in 1 contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 985 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 985.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1127 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1127.
Appears in 1 contract
Samples: Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 977 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 977.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 892; and 3) Contractor’s Response to RFB 5768, as amendedRFP 892.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this ContractContract and its exhibits and addenda; 2) RFB 5768 (including all exhibits and addenda)Request for Proposal 899; and 3) Contractor’s Response to RFB 5768, as amendedRequest for Proposal 899.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1034 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1034.
Appears in 1 contract
Samples: Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1093 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1093.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 1063; and 3) Contractor’s Response to RFB 5768, as amendedRFP 1063.
Appears in 1 contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1031 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1031.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 924; and 3) Contractor’s Response to RFB 5768, as amendedRFP 924.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1094 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1094.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1105 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1105.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1061 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amended.;
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this ContractContract with all exhibits; 2) RFB 5768 (including all exhibits and addenda)RFP 931; and 3) Contractor’s Response to RFB 5768, as amendedRFP 931.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1076 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1076.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)the Licensed Product Agreement; 3) RFP 975; and 34) Contractor’s Response to RFB 5768, as amendedRFP 975.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1057 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1057.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1065 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1065.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)the Specifications; 3) Request for Bid B 5744; and 34) Contractor’s Response to RFB 5768, as amendedB 5744.
Appears in 1 contract
Samples: Busing Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 933; and 3) Contractor’s Response to RFB 5768, as amendedRFP 933.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 944; and 3) Contractor’s Response to RFB 5768, as amendedRFP 944.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1025 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768RFP 1025 as modified by the BAFO dated November 22, as amended.2019
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (RFP 993 including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 993.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this ContractContract and Exhibit A; 2) RFB 5768 (including all exhibits and addenda)RFP 920; and 3) Contractor’s Response to RFB 5768, as amendedRFP 920.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 954; and 3) Contractor’s Response to RFB 5768, as amendedRFP 954.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1012 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768RFP 1012, as amended.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all RFP 972 and its exhibits and addenda); 3) Contractor’s Presentation/BAFO Questionnaire Table A to RFP 972; and 34) Contractor’s Response to RFB 5768, as amendedRFP 972 (inclusive of clarification and exclusive of Tab E).
Appears in 1 contract
Samples: Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1070 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1070.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1091 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1091.
Appears in 1 contract
Samples: Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1092 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1092.
Appears in 1 contract
Samples: Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1117 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1117.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1045 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1045.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 966; and 3) Contractor’s Response to RFB 5768, as amendedRFP 966.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1113 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1113.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1039 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1039.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 996; and 3) Contractor’s Response to RFB 5768, as amendedRFP 996.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a ofa conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1071 (including all exhibits and addenda); and 3) Contractor’s 's Response to RFB 5768, as amendedRFP 1071.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1128 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1128.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 (including all exhibits and addenda)RFP 930; and 3) Contractor’s Response to RFB 5768, as amendedRFP 930.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) Contractor’s Response to RFB 5768, as amended; and 3) RFB 5768 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amended.
Appears in 1 contract
Samples: Professional Services Contract
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 979 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 979.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1133 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1133.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1120 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1120.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP XXXX (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP XXXX.
Appears in 1 contract
Samples: Professional Services
ORDER OF PRIORITY. In the event of a conflict among the documents constituting this Contract, the order of priority to resolve the conflict shall be: 1) this Contract; 2) RFB 5768 RFP 1028 (including all exhibits and addenda); and 3) Contractor’s Response to RFB 5768, as amendedRFP 1028.
Appears in 1 contract
Samples: Professional Services