Common use of OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS Clause in Contracts

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15.

Appears in 23 contracts

Samples: Contract for Construction, Contract for Construction, Contract for Construction

AutoNDA by SimpleDocs

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 § 7.4.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15Project.

Appears in 16 contracts

Samples: Agreement, www.unlv.edu, www.unlv.edu

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts including Subcontractors currently on the Project in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided elsewhere in Article 15the Contract Documents.

Appears in 16 contracts

Samples: Agreement, Agreement, Agreement

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. § 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15.

Appears in 6 contracts

Samples: mccmeetingspublic.blob.core.usgovcloudapi.net, crdact.net, Form of Agreement (Nu Skin Enterprises Inc)

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 11.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions conditions of the Contract contract identical or substantially similar to these these, including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim claim as provided in Article 15Paragraph 9.10.

Appears in 3 contracts

Samples: Owner and Contractor Agreement, Owner and Contractor Agreement, www.rsfassociation.org

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 A.6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, forces and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of site. The Design-Builder shall cooperate with the Contract identical or substantially similar to these including those portions related to insurance Owner and waiver of subrogationseparate contractors whose work might interfere with the Design-Builder’s Work. If the Contractor Design-Builder claims that delay or additional cost is involved because of such action by the Owner, the Contractor Design-Builder shall make such Claim as provided in Article 15Section A.4.1.

Appears in 3 contracts

Samples: www.unlv.edu, www.unlv.edu, www.unlv.edu

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15Paragraph 4.3.

Appears in 2 contracts

Samples: Immunicon Corp, Corixa Corp

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided elsewhere in Article 15the Contract Documents.

Appears in 2 contracts

Samples: Contract for Construction (Monarch Casino & Resort Inc), Agreement (Digex Inc/De)

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 11.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions conditions of the Contract contract identical or substantially similar to these these, including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim claim as provided in Article 15Paragraph 9.10.

Appears in 2 contracts

Samples: Owner and Contractor Agreement, Omtool LTD

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 11.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions conditions of the Contract contract identical or substantially similar to these these, including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim claim as provided in Article 15Paragraph 9. 10.

Appears in 1 contract

Samples: www.dmhprojects.com

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under 20 Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15Paragraph 4.3.

Appears in 1 contract

Samples: www.mohave.edu

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The 6.1.1. Owner reserves the right to perform construction or operations related to the Project not included within the Work with the Owner’s 's own forces, forces and to award separate contracts in connection with other portions of the Project or other construction or operations on not included within the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogationWork. If the Contractor claims that delay or additional cost is involved because of such action by the OwnerOwner or actions of such separate contractors, the Contractor shall make such Claim Claims as provided elsewhere in Article 15the Contract.

Appears in 1 contract

Samples: Contractor Construction Agreement (Bluerock Residential Growth REIT, Inc.)

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. § 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15.

Appears in 1 contract

Samples: biznet.ct.gov

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 § 11.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions conditions of the Contract contract identical or substantially similar to these these, including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim claim as provided in Article 15Section 9.10.

Appears in 1 contract

Samples: teammct.com

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 A.6.1.1 The Owner reserves the right to perform construction or operations related or adjacent to the Project with the Owner’s own forces, forces and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of site. The Design-Builder shall cooperate with the Contract identical or substantially similar to these including those portions related to insurance Owner and waiver of subrogationseparate contractors whose work might interfere with the Design-Builder’s Work. If the Contractor Design-Builder claims that delay or additional cost is involved because of such action by the Owner, the Contractor Design-Builder shall make such Claim as provided in Article 15Section A.4.1.

Appears in 1 contract

Samples: bnavisionnashville.com

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. § 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15.

Appears in 1 contract

Samples: 70.248.29.17:8085

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance insurance, and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided elsewhere in Article 15the Contract Documents.

Appears in 1 contract

Samples: Agreement (Digex Inc/De)

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The A. Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance site, and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make cooperate fully with such Claim other contractors and Owner’s employees and carefully fit Contractor’s own Work to such work as provided in Article 15directed by the Owner or Architect/Engineer.

Appears in 1 contract

Samples: Agreement for Construction Contract

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. § 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogationProject Site. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15.The term “

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 20 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15Paragraph 4.3.

Appears in 1 contract

Samples: cdn.maricopa.edu

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 11.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s Owners own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions conditions of the Contract contract identical or substantially similar to these these, including those portions related to insurance and waiver of subrogation. If Any/all of these items to conform to schedule generated by Contractor, if the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim claim as provided in Article 15Paragraph 9.1.

Appears in 1 contract

Samples: Standard Construction Agreement

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site Property under Conditions of the Contract identical or substantially similar to these General Conditions, including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is costs are involved because of such action by the Owner, the Contractor shall make such Claim claims as provided elsewhere in Article 15the Contract Documents.

Appears in 1 contract

Samples: Agreement (Altera Corp)

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these these, including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15Paragraph 4.3.

Appears in 1 contract

Samples: documents.cabq.gov

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The 6.1.1. Owner reserves the right to perform construction or operations related to the Project not included within the Work with the Owner’s 's own forces, forces and to award separate contracts in connection with other portions of the Project or other construction or operations on not included within the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogationWork. If the Contractor claims that delay or additional cost is involved because of such action by the OwnerOwner or actions of such separate contractors, the Contractor shall make such Claim Claims as provided else where in Article 15the Contract.

Appears in 1 contract

Samples: Contractor Construction Agreement (Bluerock Residential Growth REIT, Inc.)

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 11.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions conditions of the Contract identical or substantially similar to these these, including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim claim as provided elsewhere in Article 15Paragraph 9.10.

Appears in 1 contract

Samples: www.outagamie.org

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15site.

Appears in 1 contract

Samples: Chukchansi Economic Development Authority

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 A.6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, forces and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of site. The Design-Builder shall cooperate with the Contract identical or substantially similar to these including those portions related to insurance Owner and waiver of subrogation. If separate contractors whose work might interfere with the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15Design-Builder’s Work.

Appears in 1 contract

Samples: asc67.org

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 § 7.4.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on Project. all s vis xxx ited the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Ownersite, the Contractor shall make such Claim as provided in Article 15.personal

Appears in 1 contract

Samples: www.unlv.edu

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15Section 4.3.

Appears in 1 contract

Samples: Agreement (Adicet Bio, Inc.)

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. § 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15.

Appears in 1 contract

Samples: www.purchasing.ri.gov

OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS. § 6.1.1 The Owner reserves the right to perform construction or operations related to the Project with the Owner’s 's own forces, and to award separate contracts in connection with other portions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner, the Contractor shall make such Claim as provided in Article 15Section 4.3.

Appears in 1 contract

Samples: Agreement (Sierra Pacific Resources /Nv/)