PAVEMENT MARKINGS AND MARKERS. (7-15-14) RWZ-3 Pavement markings shall be installed in accordance with Standard Drawings 1205.01 through 1205.13 of the 2012 Roadway Standard Drawings and Section 1205 of the 2012 Standard Specifications with the exception of the 15 day edge line replacement requirement for two-lane, two-way roadways as described in Subarticle 1205-3(D) of the 2012 Standard Specifications. For all two-lane, two-way facilities, edge lines can be replaced within 30 calendar days after they have been obliterated.
Appears in 19 contracts
Samples: Roadway Contract, Roadway Contract, Roadway Contract