Common use of Payments to Subcontractors Clause in Contracts

Payments to Subcontractors. G.6.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under this contract: a) Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the contract; or b) Notify the District and the subcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment. G.6.2.2 The Contractor must pay any subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) the 15th day after the required payment date for any other item. G.6.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 A dispute between the Contractor and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

Appears in 3 contracts

Samples: Supply Agreement, Idiq Contract, Contract

AutoNDA by SimpleDocs

Payments to Subcontractors. G.6.2.1 14.5.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under this contract: a) Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the contract; or b) Notify the District and the subcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment. G.6.2.2 14.5.2.2 The Contractor must pay any subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) the 15th day after the required payment date for any other item. G.6.2.3 14.5.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 14.5.2.4 A dispute between the Contractor and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

Appears in 2 contracts

Samples: Construction Management at Risk Agreement, Construction Management at Risk Agreement

Payments to Subcontractors. G.6.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under this contract: a) Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the contract; or b) Notify the District and the subcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment. G.6.2.2 The Contractor must pay any subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) the 15th day after the required payment date for any other item. G.6.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-30- day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 A dispute between the Contractor and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

Appears in 1 contract

Samples: Human Care Agreement

Payments to Subcontractors. G.6.2.1 Section 15.5.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor Subcontractor under this contract: a) Pay the subcontractor Subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor Subcontractor for work performed under the contract; or b) Notify the District and the subcontractorSubcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractorSubcontractor’s payment and state the reason for the nonpayment. G.6.2.2 Section 15.5.2.2 The Contractor must pay any subcontractor Subcontractor or supplier interest penalties on amounts due to the subcontractor Subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) the 15th day after the required payment date for any other item. G.6.2.3 Section 15.5.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor Subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 Section 15.5.2.4 A dispute between the Contractor and subcontractor Subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.a

Appears in 1 contract

Samples: Design Build Agreement

Payments to Subcontractors. G.6.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under this contract: a) Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the contract; or b) Notify the District and the subcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment. G.6.2.2 The Contractor must pay any subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) before the 15th day after the required payment date for any other item. G.6.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 A dispute between the Contractor and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

Appears in 1 contract

Samples: Medical Evidence of Record (Mer) Retrieval Contract

Payments to Subcontractors. G.6.2.1 Section 15.5.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under this contract: a) Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the contract; or b) Notify the District and the subcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment. G.6.2.2 Section 15.5.2.2 The Contractor must pay any subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) the 15th day after the required payment date for any other item. G.6.2.3 Section 15.5.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 Section 15.5.2.4 A dispute between the Contractor and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute. Section 15.5.3.1 The Contractor shall include in each subcontract under this contract a provision requiring the subcontractor to include in its contract with any lower-tier subcontractor or

Appears in 1 contract

Samples: Design Build Agreement

Payments to Subcontractors. G.6.2.1 The Contractor must take one of the following actions within seven (7) 7 days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under this contracta human care agreement: a) Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the contract; or b) Notify the District and the subcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment. G.6.2.2 The Contractor must pay any lower-tier subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) the 15th day after the required payment date for any other item. G.6.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-30- day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 A dispute between the Contractor and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

Appears in 1 contract

Samples: Human Care Agreement

Payments to Subcontractors. G.6.2.1 The Contractor must Provider shall take one of the following actions within seven (7) 7 days of receipt of any amount paid to the Contractor Provider by the District for work performed by any subcontractor under this a contract: a) a. Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the contractAgreement; or b) b. Notify the District and the subcontractor, in writing, of the ContractorProvider’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment. G.6.2.2 The Contractor must Provider shall pay any lower-tier subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) a. the 3rd day after the required payment date for meat or a meat product; b) b. the 5th day after the required payment date for an agricultural commodity; or c) c. the 15th day after the required payment date for any other item. G.6.2.3 Any amount of an interest penalty which remains unpaid by the Contractor Provider at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 A dispute between the Contractor Provider and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.. G.7 AUTHORITY OF CONTRACTING OFFICER

Appears in 1 contract

Samples: Oral Health Services Fee for Service Population

AutoNDA by SimpleDocs

Payments to Subcontractors. G.6.2.1 14.4.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under this contract: a) Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the contract; or b) Notify the District Contracting Officert and the subcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment. G.6.2.2 14.4.2.2 The Contractor must pay any subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 11.5% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) the 15th day after the required payment date for any other item. G.6.2.3 14.4.2.4 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 14.4.2.5 A dispute between the Contractor and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

Appears in 1 contract

Samples: Construction Management at Risk Agreement

Payments to Subcontractors. G.6.2.1 Section 15.5.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under this contract: a) Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the contract; or b) Notify the District and the subcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment. G.6.2.2 Section 15.5.2.2 The Contractor must pay any subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) the 15th day after the required payment date for any other item. G.6.2.3 Section 15.5.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 Section 15.5.2.4 A dispute between the Contractor and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

Appears in 1 contract

Samples: Design Build Agreement

Payments to Subcontractors. G.6.2.1 Section 15.5.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor Subcontractor under this contract: a) Pay the subcontractor Subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor Subcontractor for work performed under the contract; or b) Notify the District and the subcontractorSubcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractorSubcontractor’s payment and state the reason for the nonpayment. G.6.2.2 Section 15.5.2.2 The Contractor must pay any subcontractor Subcontractor or supplier interest penalties on amounts due to the subcontractor Subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) the 15th day after the required payment date for any other item. G.6.2.3 Section 15.5.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor Subcontractor and thereafter interest penalties shall accrue on the added amount.on G.6.2.4 Section 15.5.2.4 A dispute between the Contractor and subcontractor Subcontractor relating to the amounts or entitlement of a subcontractor Subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

Appears in 1 contract

Samples: Design Build Agreement

Payments to Subcontractors. G.6.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under this contract: a) Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the contract; or b) Notify the District and the subcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment. G.6.2.2 The Contractor must pay any subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) the 15th day after the required payment date for any other item. G.6.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 A dispute between the Contractor and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

Appears in 1 contract

Samples: Negotiated Contract for Goods and/or Services

Payments to Subcontractors. G.6.2.1 14.4.2.1 The Contractor must take one of the following actions within seven (7) days of receipt of any amount paid to the Contractor by the District for work performed by any subcontractor under this contract: a) Pay the subcontractor for the proportionate share of the total payment received from the District that is attributable to the subcontractor for work performed under the contract; or b) Notify the District and the subcontractor, in writing, of the Contractor’s intention to withhold all or part of the subcontractor’s payment and state the reason for the nonpayment. G.6.2.2 14.4.2.2 The Contractor must pay any subcontractor or supplier interest penalties on amounts due to the subcontractor or supplier beginning on the day after the payment is due and ending on the date on which the payment is made. Interest shall be calculated at the rate of 1% per month. No interest penalty shall be paid on the following if payment for the completed delivery of the item of property or service is made on or before: a) the 3rd day after the required payment date for meat or a meat product; b) the 5th day after the required payment date for an agricultural commodity; or c) the 15th day after the required payment date for any other item. G.6.2.3 14.4.2.3 Any amount of an interest penalty which remains unpaid by the Contractor at the end of any 30-day period shall be added to the principal amount of the debt to the subcontractor and thereafter interest penalties shall accrue on the added amount. G.6.2.4 14.4.2.4 A dispute between the Contractor and subcontractor relating to the amounts or entitlement of a subcontractor to a payment or a late payment interest penalty under the Quick Payment Act does not constitute a dispute to which the District of Columbia is a party. The District of Columbia may not be interpleaded in any judicial or administrative proceeding involving such a dispute.

Appears in 1 contract

Samples: Construction Management at Risk Agreement